Rocket & Tigerli

Winterthur, Switzerland

Start of construction: September 2025

At 100 meters, "Rocket" in Winterthur is one of the tallest timber residential buildings currently in planning. The building complex comprises attractive rental apartments and hotel rooms. The three "Tigerli" buildings complete…

Tunnel Ligerz, Lot 2

Ligerz, Switzerland

Start of construction: September 2024
Construction volume (value of our services): 230 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprises the construction of the 2.1 km long twin-track tunnel in Ligerz. The total contract value is CHF 220 million, with Implenia's share amounting to around CHF 150 million.

Fulenbach, Erweiterung

Bern, Switzerland

Start of construction: May 2023
Construction volume (value of our services): 141.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the construction of an access road on the premises of Fischer Papier AG.

Verkehrssanierung und städtebauliche Entwicklung in Laupen

Laupen, Switzerland

Start of construction: March 2023
Construction volume (value of our services): 51,4 M EUR Costs converted according to average yearly exchange rates during project realization

After completion of the project, the course of the Sense River will be wider and more natural. Thus, the town of Laupen, the new train station, the bicycle and hiking paths along the Sense and the settlements in the Sense area…

Leonardo Zürich

Zürich, Switzerland

Start of construction: February 2023
Construction volume (value of our services): 275.000 EUR Costs converted according to average yearly exchange rates during project realization

In the New Leonardo office building in Zurich Oerlikon, the joinery was commissioned to carry out the interior fit-out of the new catering area.

The Flag

Massagno (Lugano), Switzerland

Start of construction: December 2022
Construction volume (value of our services): 18,4 M EUR Costs converted according to average yearly exchange rates during project realization

Two buildings with 78 barrier-free apartments are being built in Lugano, which not only offer the highest level of living comfort, but also a wide range of services for a self-determined life in old age.

Steffisburg, Gschwendareal

Steffisburg, Switzerland

Start of construction: November 2022
Construction volume (value of our services): 122.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included pavement paving as part of the environmental works of the Gschwendareal.

Laborneubau Departement Biomedizin DBM Universität Basel

Basel, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 259 M EUR Costs converted according to average yearly exchange rates during project realization

The Department of Biomedicine (DBM) of the University of Basel combines the experimental laboratory research of the medical faculty in the latest new building of the Life Sciences Campus on the Schällemätteli site in Basel. This…

Secondo tubo San Gottardo - Lot 241, Main Tunnel North

Göschenen, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 449 M EUR Costs converted according to average yearly exchange rates during project realization

The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…

Luzerner Kantonsspital – Neubau Kinderspital/Frauenklinik

Luzern, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 41,7 M EUR Costs converted according to average yearly exchange rates during project realization

The new building will enable future-oriented further development of pediatric medicine (pediatrics and pediatric surgery) as well as obstetrics and gynecology at the highest level and is an important step for future health care…

Neubau REFH Sandblatte Rain

Rain, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 2,6 M EUR Costs converted according to average yearly exchange rates during project realization

The "Sandblatte" development comprises 22 terraced single-family homes and three commercial premises.

EWZ Werkhof Herdern

Zürich, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 1 M EUR Costs converted according to average yearly exchange rates during project realization

The façade of the new Werkhof Herdern building consists of over 2,500 m² of untreated, local Douglas fir wood with special profiles, which were developed for the project in close collaboration with the architect and the…

Angéloz, Fribourg

Fribourg, Switzerland

Start of construction: July 2022

The project concerns an existing building in the city centre of Fribourg, Rue de Romont 33, in which the owner wanted to carry out an interior extension and a conversion of the administrative and sanitary rooms.

Ersatzneubau Riedacker

Zürich, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 2,4 M EUR Costs converted according to average yearly exchange rates during project realization

For the new Riedacker replacement building, timber construction elements were mounted on a solid steel and concrete structure.

STEP AS25 Rüthi – Oberriet, system adjustments

Rüthi – Oberriet, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 102 M EUR Costs converted according to average yearly exchange rates during project realization

The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.

Stettlen, Schwandihof WL

Bern, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 308 M EUR Costs converted according to average yearly exchange rates during project realization

With the "Schwandihof property", Bernapark AG created a new quarter on an old farm site, which combines living, work and leisure in one place. We carried out the civil engineering work for this project. These were carried out in…

COE Green Village, Bâtiment Kyoto

Le Grand-Saconnex, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 61,4 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of an administrative building in the new Green Village district on the site of the Ecumenical Center of Churches.

AFW Holligen Nord

Bern, Switzerland

Start of construction: May 2022
Construction volume (value of our services): 7,5 M EUR Costs converted according to average yearly exchange rates during project realization

Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.

Ersatzneubau Tokeh

Zürich, Switzerland

Start of construction: April 2022
Construction volume (value of our services): 7,8 M EUR Costs converted according to average yearly exchange rates during project realization

For the replacement TOKEH building, a new morphological building type was generated that combines the two row buildings (longitudinal and transverse to the slope) prevalent in the neighborhood into a cruciform floor plan. …

Parkhaus Forschungskampus EMPA

Düebendorf, Switzerland

Start of construction: March 2022
Construction volume (value of our services): 1,8 M EUR Costs converted according to average yearly exchange rates during project realization

A new campus is being built on the Empa-Eawag site in Dübendorf, consisting of a laboratory and a multifunctional building with a parking garage.

Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude

Liestal, Switzerland

Start of construction: February 2022
Construction volume (value of our services): 40,9 M EUR Costs converted according to average yearly exchange rates during project realization

In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …

Ottikon Schulhausstrasse

Ottikon bei Kemptthal, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 85.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is realizing the interior fittings and custom-made products for the new construction of the Wachter multi-family house.

Überbauung Lindenweg

Zell, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 2,3 M EUR Costs converted according to average yearly exchange rates during project realization

Production and assembly of prefabricated pitched roof elements.

Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223

Baden, Switzerland

Start of construction: October 2021
Construction volume (value of our services): 11,8 M EUR Costs converted according to average yearly exchange rates during project realization

A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…

Green Village Route de Ferney

Genf, Switzerland

Start of construction: September 2021
Construction volume (value of our services): 389.000 EUR Costs converted according to average yearly exchange rates during project realization

The building is named after the Montreal Protocol, an international agreement signed by 24 countries in 1987 to reduce by half the number of substances that damage the ozone layer. In 2009, it became the first universally…

Neubau Grundwasserfassung Oberi Au

Uttigen, Switzerland

Start of construction: August 2021
Construction volume (value of our services): 2,7 M EUR Costs converted according to average yearly exchange rates during project realization

Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…

Laborprovisorium Functional Genomics Center Zürich

Zürich, Switzerland

Start of construction: July 2021
Construction volume (value of our services): 16,3 M EUR Costs converted according to average yearly exchange rates during project realization

The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…

Neubau Mehrzweckgebäude Alterswil

Alterswil, Switzerland

Start of construction: June 2021
Construction volume (value of our services): 2,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Alterswil multi-purpose building is an important part of the Alterswil municipality's infrastructure. It is used for school lessons, sports, events and other purposes.

Zollikerberg Langwattstrasse

Zollikerberg, Switzerland

Start of construction: May 2021
Construction volume (value of our services): 99.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is carrying out the interior finishing work on the new Langwattstrasse apartment building in Zollikerberg.

Secondo tubo San Gottardo - Lot 243, North access tunnel

Göschenen, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 85,1 M EUR Costs converted according to average yearly exchange rates during project realization

To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…

Lokstadt Elefant

Winterthur, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 42,9 M EUR Costs converted according to average yearly exchange rates during project realization

The "Elefant" is a modern office building consisting of a historic part of the building and a new 7-storey timber construction. This makes it one of the largest timber office buildings that Implenia has developed and realized for…

Masterplan Forschungscampus Empa Eawag, Etappe 1

Düebendorf, Switzerland

Start of construction: April 2021

In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…

Gesamtsanierung Monbijoustrasse

Bern, Switzerland

Start of construction: February 2021
Construction volume (value of our services): 13,2 M EUR Costs converted according to average yearly exchange rates during project realization

The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.

Adlikon Leebern

Adlikon, Switzerland

Start of construction: January 2021
Construction volume (value of our services): 1,7 M EUR Costs converted according to average yearly exchange rates during project realization

The Adlikon Leebern project is spread over three stages, which will be carried out one after the other. The contract is worth around 1.7 million Swiss francs.

Erneuerung Waldenburgerbahn Los 6.1

Waldenburg, Switzerland

Start of construction: October 2020
Construction volume (value of our services): 69,9 M EUR Costs converted according to average yearly exchange rates during project realization

The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…

Neubau LNG-Anlage

Neuenegg, Switzerland

Start of construction: September 2020
Construction volume (value of our services): 609.000 EUR Costs converted according to average yearly exchange rates during project realization

Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.

MFH Lilienstrasse

Allschwil, Switzerland

Start of construction: July 2020
Construction volume (value of our services): 6,5 M EUR Costs converted according to average yearly exchange rates during project realization

The "Lilienstrasse" project consists of a four-storey building and a car park.

Mission Permanente de l’Inde

Pregny-Chambésy, Switzerland

Start of construction: June 2020

India passed the 1.4 billion mark last year, making it the most populous country in the world. The diplomatic mission in French-speaking Switzerland could therefore no longer make do with the cramped premises in the centre of…

Les Jardins de Rozon

La Croix-de-Rozon, Switzerland

Start of construction: June 2020

Marking the border with France, Bardonnex is home to a number of residential communities, including La Croix-de-Rozon.

Sézenove

Bernex, Switzerland

Start of construction: June 2020

Close to the hamlet of Sézenove, to the south-west of the commune of Bernex, lies a village-style residential area.

Worblaufen Hammerwerk residential development

Worblaufen, Switzerland

Start of construction: May 2020
Construction volume (value of our services): 29,9 M EUR Costs converted according to average yearly exchange rates during project realization

New residential development on the banks of the River Aare on the former Hammerwerke site in the municipality of Ittigen / Worblaufen (BE).

Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9

Zweisimmen, Switzerland

Start of construction: April 2020
Construction volume (value of our services): 5,7 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…

Swiss Life Brannhof

Zürich, Switzerland

Start of construction: March 2020
Construction volume (value of our services): 97,1 M EUR Costs converted according to average yearly exchange rates during project realization

With the redevelopment of Swiss Life Brannhof in Zurich's Bahnhofstrasse comes a new and attractive mixed-use concept. Thus, the historic pioneering spirit on the renowned promenade and shopping street will be given a new lease…

Bernapark, Erschliessung Marktplatz und Speditionsplatz

Stettlen, Switzerland

Start of construction: March 2020
Construction volume (value of our services): 2,7 M EUR Costs converted according to average yearly exchange rates during project realization

Bernapark AG created the "Bernapark" on an old factory site, a new quarter that combines living, working and leisure in one place. We carried out the civil engineering work for this project. These took place in different parts of…

Innere Erneuerung, Hummelbergstrasse 8 - 16

Rapperswil-Jona, Switzerland

Start of construction: February 2020
Construction volume (value of our services): 4,4 M EUR Costs converted according to average yearly exchange rates during project realization

The existing properties are located in an attractive residential area in Rapperswil-Jona and were renovated a few years ago. Although the occupancy rate remains very good, the owner has been intending to carry out a renovation…

Am Giessenplatz M1.2.1

Dübendorf, Switzerland

Start of construction: February 2020
Construction volume (value of our services): 20,5 M EUR Costs converted according to average yearly exchange rates during project realization

A new, attractive residential quarter is being built on the banks of the Glatt in Dübendorf. Once all four stages have been completed, the quarter will have a total of around 385 flats, 60 care rooms and a new city park. …

Bremgarten Wohnüberbauung Wydeweg

Bremgarten, Switzerland

Start of construction: January 2020
Construction volume (value of our services): 1,5 M EUR Costs converted according to average yearly exchange rates during project realization

On behalf of Graubünden-based general contractor Mathis Baumanagement, approx. 5000 m2 of wooden facade will be installed in three stages on a total of 6 apartment buildings.

Résidence Honolulu, Etoy VD

Etoy, Switzerland

Start of construction: January 2020

The Résidence Honolulu, a new address with all the comforts in Etoy, for senior citizens and people with reduced mobility who are looking for conviviality and security.

New Aarau Cantonal Hospital "Dreiklang" (KSA) building

Aarau, Switzerland

Start of construction: January 2020

The cantonal hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…

SH4 Datacenter

Rafz, Switzerland

Start of construction: December 2019
Construction volume (value of our services): 19,7 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of a data center with main building, office complex, cooling systems, generator building, 2 power conversion buildings.

Sanierung Busplatz und Anpassungen Kantonsstrasse

Reichenbach im Kandertal, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 582.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.

Pont Neuf - Replacement Kettenbrücke Aarau

Aarau, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 23 M EUR Costs converted according to average yearly exchange rates during project realization

The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.

Pontons von Cologny, Genf

Cologny, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 1,7 M EUR Costs converted according to average yearly exchange rates during project realization

The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…

Kilchberg Seestrasse 160 / 162

Zürich, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 532.000 EUR Costs converted according to average yearly exchange rates during project realization

With the displacement of the old building, space was created for an apartment building with seven parties.

Primary school building Martin Haffter

Weinfelden, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 24 M EUR Costs converted according to average yearly exchange rates during project realization

The Martin Haffter primary school building was constructed using timber elements. The new building is Minergie-certified.

Vier Wohnhäuser Langenhagweg

Allschwil, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 19,7 M EUR Costs converted according to average yearly exchange rates during project realization

The Langenhagweg project consists of 4 residential buildings, each with a basement and base floor, a ground floor, two upper floors and an attic floor.

Kaiseraugst Bollingerhaus

Basel, Switzerland

Start of construction: September 2019
Construction volume (value of our services): 533.000 EUR Costs converted according to average yearly exchange rates during project realization

Complete excavation of the economic part. Support and securing of the roof structure to be protected. Measures to secure the facade.

Refresh Geschäftshaus „TORO 1“, Brown Boveristrasse 5

Zürich, Switzerland

Start of construction: September 2019
Construction volume (value of our services): 18,3 M EUR Costs converted according to average yearly exchange rates during project realization

The current main tenants have reduced their rental space. The vacant rental area measuring around 8,900 m², about 45% of the total rental area, is to be made available for rental to various users (multi-tenant) in future. …

AZ Rohwiesen

Opfikon, Switzerland

Start of construction: August 2019
Construction volume (value of our services): 14,7 M EUR Costs converted according to average yearly exchange rates during project realization

The Zurich blue-light organizations are guided by the credo "knowing heads in crisis".

Neubau Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: July 2019
Construction volume (value of our services): 43,8 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

Rue de Lausanne 42-44, Genève

Genève, Switzerland

Start of construction: June 2019

The building at rue de Lausanne 42-44 in Geneva, built in 1962, is located in a sought-after urban district in the heart of the right bank, within easy reach of Cornavin station, transport links, business and shopping facilities…

Adret 15-17-19, Lancy

Grand-Lancy, Switzerland

Start of construction: June 2019

The project is located in the new district created to the west of the CEVA railway line, at the Lancy-Pont-Rouge station of the Léman express. It is part of a complex of 635 public housing units in various categories (low-income,…

SBB Vierspurausbau – Liestal

Liestal, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 113 M EUR Costs converted according to average yearly exchange rates during project realization

Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure. …

Herrenschwanden New school building

Herrenschwanden, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 7,6 M EUR Costs converted according to average yearly exchange rates during project realization

School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)

Umgestaltung Worbstrasse

Gümligen, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 1,4 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.

KIM residential and commercial development / construction site 4.1

Winterthur, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 77 M EUR Costs converted according to average yearly exchange rates during project realization

The One Company project 'KIM' is being built in Winterthur Neuhegi near Neuhegi railway station. A total of 208 rental flats are being built with public-oriented uses on the ground floor.

Staumauer Spitallamm – Grimsel

Grimsel, Switzerland

Start of construction: May 2019
Construction volume (value of our services): 96,2 M EUR Costs converted according to average yearly exchange rates during project realization

The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.

Basel Kaserne Hauptbau

Basel, Switzerland

Start of construction: May 2019
Construction volume (value of our services): 1,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Kaserne Basel is a building in Basel, built in 1863. Today it is a cultural center for the independent theater, dance and performance scene as well as for concerts in the field of popular music.

Südwestumfahrung Brugg

Brugg/Windisch/Hausen, Switzerland

Start of construction: April 2019
Construction volume (value of our services): 30,3 M EUR Costs converted according to average yearly exchange rates during project realization

The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.

Affolternstrasse 77+79, 8050 Zürich

Zurich, Switzerland

Start of construction: February 2019
Construction volume (value of our services): 4,5 M EUR Costs converted according to average yearly exchange rates during project realization

Renovation and addition of another floor to the residential buildings Affolternstrasse 77/79, 8050 Zurich. The existing 31 apartments were supplemented with an additional 4 apartments with a wooden extension. The tenants could…

Feuerthalen am Cholfirst

Laufen-Uhwiesen, Switzerland

Start of construction: January 2019
Construction volume (value of our services): 828.000 EUR Costs converted according to average yearly exchange rates during project realization

In this project Implenia Holzbau realized the facade including insulation as well as the floor gratings on the balconies.

Giessenturm

Dübendorf, Switzerland

Start of construction: January 2019
Construction volume (value of our services): 82,5 M EUR Costs converted according to average yearly exchange rates during project realization

In the northwest of Dübendorf, between the Überlandstrasse and the idyllic riverside path of the Glatt, a new urban district is being built on the former Givaudan site in five stages by 2022.

Quartier de l'Etang - Îlot E

Vernier, Switzerland

Start of construction: December 2018

The Quartier de l'Etang, an exemplary conversion of an industrial site two kilometers from the historic center of Geneva, has become a strategic urban piece. Located in the commune of Vernier, it extends over a 9.5 hectare…

Site development veneer plant

Rheinfelden AG, Switzerland

Start of construction: November 2018
Construction volume (value of our services): 13 M EUR Costs converted according to average yearly exchange rates during project realization

Reference property Implenia Schweiz AG Rheinfelden AG Site development Furnierwerk The project new building site development with 155 high-quality rental apartments and approx. 3'000m2 commercial space.

COOP Rolle

Rolle, Switzerland

Start of construction: November 2018
Construction volume (value of our services): 6,3 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of multifunctional buildings in the center of Rolle (Vaud).

Korrektion Gerbers Kurve

Reichenbach im Kandertal, Switzerland

Start of construction: October 2018
Construction volume (value of our services): 1,6 M EUR Costs converted according to average yearly exchange rates during project realization

The current road exiting the village of Reichenbach has different road widths. There are crossing problems in many places, especially when trucks or post buses are involved. Therefore, the OIK I plans to rehabilitate the section…

Parking Kunstmuseum

Basel, Switzerland

Start of construction: October 2018
Construction volume (value of our services): 40,8 M EUR Costs converted according to average yearly exchange rates during project realization

In the St. Alban-Graben in Basel, a busy street with two-lane streetcar traffic, a new underground parking lot is to be built, surrounded by the Museum of Art and Antiquities, the main branches of UBS and CS in Basel and the…

New BSS building of the Department of Biosystems, Basel

Basel, Switzerland

Start of construction: October 2018
Construction volume (value of our services): 145 M EUR Costs converted according to average yearly exchange rates during project realization

The new building for the Department D-BSSE (Department of Biosystems Science and Engineering), founded by ETH Zurich in 2007, will provide experimental biologists and bioinformaticians with the best conditions to generate new…

Servicebuilding Preola

Zürich, Switzerland

Start of construction: September 2018
Construction volume (value of our services): 10,5 M EUR Costs converted according to average yearly exchange rates during project realization

In Zurich Altstetten, "West-Log" is a property for city logistics.

Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme

Zürich, Switzerland

Start of construction: September 2018
Construction volume (value of our services): 50,8 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.

Wohnhochhaus Baslerstrasse

Zürich, Switzerland

Start of construction: September 2018
Construction volume (value of our services): 58,9 M EUR Costs converted according to average yearly exchange rates during project realization

The high-rise building with its plinth blends in perfectly with Zurich's up-and-coming outer district and sets a striking urban accent.

RBS Los 1.2 Postparc – Ausbau Bahnhof Bern

Bern, Switzerland

Start of construction: August 2018
Construction volume (value of our services): 12,4 M EUR Costs converted according to average yearly exchange rates during project realization

Sub-project involving the expansion of Bern train station

Deisswil b. Stettlen Bernapark

Bernapark, Switzerland

Start of construction: August 2018
Construction volume (value of our services): 61,6 M EUR Costs converted according to average yearly exchange rates during project realization

Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.

Andockung MLK Frauenklinik, Inselspital

Bern, Switzerland

Start of construction: August 2018
Construction volume (value of our services): 1,7 M EUR Costs converted according to average yearly exchange rates during project realization

The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.

Neubau Halle 7, Militärflugplatz ZLE

Emmen, Switzerland

Start of construction: July 2018
Construction volume (value of our services): 26,1 M EUR Costs converted according to average yearly exchange rates during project realization

Hangar building with a total of 7 aircraft boxes in solid construction 187mx27m. On the north side is a three-story annex for offices.

ONU, Palais des nations Bâtiment H

Genève, Switzerland

Start of construction: June 2018

Construction of a new administrative building within the Palais des Nations.

Petite Prairie 2, Nyon

Nyon, Switzerland

Start of construction: June 2018

The Petite Prairie district in the heights of Nyon is made up of several urban components. Petite Prairie 2 is the second stage of this major project to extend the town to the north-west, and was the result of a competition won…

Gesamtsanierung Sommerhaldenstrasse 13+15

Brugg, Switzerland

Start of construction: June 2018
Construction volume (value of our services): 11,3 M EUR Costs converted according to average yearly exchange rates during project realization

The properties, which comprise 102 flats, have never been completely renovated since they were constructed in 1981 and 1984.

Cilag Microbio Lab B45

Schaffhausen, Switzerland

Start of construction: June 2018
Construction volume (value of our services): 12,4 M EUR Costs converted according to average yearly exchange rates during project realization

New building Microbio laboratory with technical rooms in Schaffhausen

Office and commercial building Orion

Zürich, Switzerland

Start of construction: May 2018
Construction volume (value of our services): 17,7 M EUR Costs converted according to average yearly exchange rates during project realization

Office and commercial building Orion, 8005 Zurich

Winterthur Lokstadt Krokodil

Winterthur, Switzerland

Start of construction: May 2018
Construction volume (value of our services): 15,3 M EUR Costs converted according to average yearly exchange rates during project realization

The four-sided perimeter block development with parking garage on the 1st basement level is planned on 3 sides with 6 floors.

Kornhaus

Romanshorn, Switzerland

Start of construction: May 2018
Construction volume (value of our services): 25,7 M EUR Costs converted according to average yearly exchange rates during project realization

The project involved the conversion and extension of the former SBB warehouses with an underground car park in Romanshorn.

WÜB WolkenWerk

Oerlikon, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 27 M EUR Costs converted according to average yearly exchange rates during project realization

Implenia is constructing the three high-rise residential buildings and associated plinth structures in the up-and-coming Zurich-Oerlikon district.

Leonardo – Thurgauerstrasse 80

Zürich, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 17,5 M EUR Costs converted according to average yearly exchange rates during project realization

The "Leonardo" office building, which went into operation in 2002, was the largest office building in Switzerland to be built to the Minergie standard at the time.

Winterthur Town Village

Town Village, Winterthur, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 1,9 M EUR Costs converted according to average yearly exchange rates during project realization

A multi-use, multi-faceted development with a community focus.

Schmitten Residential development Bodenmattpark

Schmitten, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 17,6 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a residential development in the village centre of Schmitten (FR). The 70 flats of owner-occupied standard are divided into 5 buildings, each with 5 storeys. The surroundings would be designed according to the…

New residential and commercial development in the picture

Zizers, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 17,5 M EUR Costs converted according to average yearly exchange rates during project realization

Commercial: Coop Cooperative with 650 m2 of retail space 33 rental apartments between 2 ½ and 5 ½-rooms.

Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS

St. Gallen, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 66,3 M EUR Costs converted according to average yearly exchange rates during project realization

The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…

Sanierung Werkleitungen und Umgestaltung Marktplatz

Lyss, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 1,9 M EUR Costs converted according to average yearly exchange rates during project realization

In Lyss, the market square was redesigned and the works pipelines were rehabilitated.

N01/42, 46 UPlaNS Verzweigung ZH Ost – Effretikon

Wallisellen, Switzerland

Start of construction: February 2018
Construction volume (value of our services): 71 M EUR Costs converted according to average yearly exchange rates during project realization

Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.

Grubenstrasse 23 / 25

Langenthal, Switzerland

Start of construction: January 2018
Construction volume (value of our services): 1,5 M EUR Costs converted according to average yearly exchange rates during project realization

Prior to the actual building works, Implenia Real Estate Consulting carried out a property analysis to investigate the development potential of the property. After completion of the analysis, a renovation concept was developed…

Neubau Leister AG

Kägiswil, Switzerland

Start of construction: January 2018
Construction volume (value of our services): 17,7 M EUR Costs converted according to average yearly exchange rates during project realization

Addition of a new production to the existing building.

Renovation of the Weyergut Centre, Mohnstrasse 4

Köniz, Switzerland

Start of construction: January 2018

The "Weyergut" retirement and nursing home in Wabern, which originally served as a retirement home and is currently used as a nursing home with its own dementia unit, is in need of renovation after 40 years of intensive use. …

Panxwiesen groundwater pumping station, Malans

Malans, Switzerland

Start of construction: January 2018
Construction volume (value of our services): 204.000 EUR Costs converted according to average yearly exchange rates during project realization

A new pumping station was built in the Panxwiesen district in order to increase the drinking water capacity of the municipalities of Malans and Landquart.

Rolle, Rue du Temple 8

Rolle, Switzerland

Start of construction: January 2018

The project in Rolle, which was realised by the total contractor Implenia from 2018 to 2022, was the starting point for a more comprehensive urban redevelopment that also included Rue du Temple and the new Place du Marché, which…

Overbuilding Rebgarten, Liestal

Liestal, Switzerland

Start of construction: November 2017
Construction volume (value of our services): 6 M EUR Costs converted according to average yearly exchange rates during project realization

Residential and commercial building, divided into two continuous basement levels with three structures on top.

Pieterlen Bassbelt

Biel, Switzerland

Start of construction: November 2017
Construction volume (value of our services): 1,6 M EUR Costs converted according to average yearly exchange rates during project realization

Spring 2019 saw the completion of the new, timber-clad Bassbelt superstructure between Bassbeltweg and Solothurnerstrasse in Pieterlen.

Flughafen SwissLounge

Zürich Flughafen, Switzerland

Start of construction: November 2017
Construction volume (value of our services): 309.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau helped produce and install the new SwissLounge at the Zürich Airport with a close partnership between our wood construction and our finish carpentry teams.

Vogelsang Wetzikon – Mönchberg- /Preyen- /Tösstalstrasse

Wetzikon, Switzerland

Start of construction: October 2017
Construction volume (value of our services): 55,8 M EUR Costs converted according to average yearly exchange rates during project realization

The modernisation of the area comprises three stages with 12 existing residential buildings. The majority of the properties are Göhner buildings which are being enlarged to meet contemporary living requirements, including the…

Sanierung Überlandstrasse 375/377 und 391/393

Zürich, Switzerland

Start of construction: September 2017
Construction volume (value of our services): 17,8 M EUR Costs converted according to average yearly exchange rates during project realization

The two apartment buildings from the 1960s with a total of 180 apartments are in great need of renovation and refurbishment.

WÜB Bernhardswies, Bernhardswiesstr. 28-34, Hechtackerstr. 12-12g, 14-14b

St. Gallen, Switzerland

Start of construction: August 2017
Construction volume (value of our services): 36,5 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of four apartment buildings with 147 rental apartments and commercial premises as well as a kindergarten.

OMS, Bâtiment B

Genève, Switzerland

Start of construction: June 2017

Construction of a new administration building on the campus of the World Health Organisation. Demolition and remediation of contaminated sites in advance.

Edmond Vaucher 19-19c

Châtelaine, Switzerland

Start of construction: June 2017

Avenue Edmond-Vaucher connects Avenue de Châtelaine and the intersection of Le Bouchet and runs through a patchy landscape. A new, modern residential building with 60 flats and a large shop is being built on the site. The…

Atrium Park

Meyrin, Switzerland

Start of construction: June 2017

The municipality of Meyrin, which occupies a strategically important location, is home to major industrial areas and numerous urban development projects, including the multifunctional CP de la Bergère - Atrium Park property…

Espace Tourbillon

Plan-les-Ouates, Switzerland

Start of construction: June 2017

Strategically located at the crossroads of major transport routes to French-speaking Switzerland, France and Italy, Espace Tourbillon in the Plan-les-Ouates industrial zone is a new public attraction.

Erneuerung Saanenmöserstrasse Priorität 3, Los 5+6+7

Saanenmöser, Switzerland

Start of construction: June 2017
Construction volume (value of our services): 9,3 M EUR Costs converted according to average yearly exchange rates during project realization

The present project comprised an approx. 1.95 km long section in the overall project of the renewal of the Saanenmöserstrasse.

Quai Zürich

Zürich, Switzerland

Start of construction: May 2017

The Quai Zurich project involves the redevelopment of the global headquarters of the Zurich Insurance Group. Bringing together heritage properties full of tradition and state-of-the-art construction, the project reflects the…

Interior renovation Postmatte 1/3/5 and Zellburg 2/3/4

Schenkon, Switzerland

Start of construction: March 2017
Construction volume (value of our services): 5,7 M EUR Costs converted according to average yearly exchange rates during project realization

The scope of the renovation of these six residential buildings with a total of 68 flats comprised the bathroom units, kitchens, lift systems and parts of the external works. In addition, contaminants were removed from the areas…

Neubau Verwaltungszentrum Sinergia

Chur, Switzerland

Start of construction: March 2017
Construction volume (value of our services): 58,5 M EUR Costs converted according to average yearly exchange rates during project realization

Cantonal administration building with open space office structure. Consolidation of 14 offices.

Pressy 17

Vandœuvres, Switzerland

Start of construction: March 2017

In a neighborhood of beautiful residences in the commune of Vandoeuvres, on a 15,928 square meter plot, a complex of four volumes has replaced the 1960s villa. In the heart of this haven of peace bordering the Geneva Golf Club,…

Edmond Vaucher

Châtelaine, Switzerland

Start of construction: February 2017

oie perpendicular to the avenue de Châtelaine and the carrefour du Bouchet, the avenue Edmond-Vaucher traces a long straight line in a disparate landscape where the allotment gardens and the public park impose their green lung…

«RIVUS» WÜB Rehetobelstrasse 64 / 66

St. Gallen, Switzerland

Start of construction: February 2017
Construction volume (value of our services): 18,7 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of two apartment buildings with 55 apartments and conversion of the old workshop.

Bassbelt residential complex

Pieterlen, Switzerland

Start of construction: January 2017
Construction volume (value of our services): 20,7 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…

Biel, Umgestaltung Jakob-Stämpfli Strasse

Biel, Switzerland

Start of construction: January 2017
Construction volume (value of our services): 1,9 M EUR Costs converted according to average yearly exchange rates during project realization

The rehabilitation of Jakob-Stämpfli-Strasse includes the construction of new sidewalks on both sides, the renewal of the entire road drainage system as well as the foundation and edge trims over a total length of 510m. …

Les Terrasses Volantes

Saint-Blaise, Switzerland

Start of construction: January 2017
Construction volume (value of our services): 16,9 M EUR Costs converted according to average yearly exchange rates during project realization

Nestled between vineyards, water and sky, Terrasses Volantes enjoys a privileged location in the communes of Hauterive and Saint-Blaise. Taking advantage of the sloping terrain to enhance the exceptional panorama, the project has…

Haus Adeline Favre (Hall 52)

Winterthur, Switzerland

Start of construction: December 2016
Construction volume (value of our services): 62,3 M EUR Costs converted according to average yearly exchange rates during project realization

In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new…

Îlot Vert

La Chaux-de-Fonds, Switzerland

Start of construction: November 2016
Construction volume (value of our services): 37,6 M EUR Costs converted according to average yearly exchange rates during project realization

Îlot Vert is a multifunctional building in La Chaux-de-Fonds. The building offers a new, contemporary image to a complex that has been disused for several years. The project is located in the checkerboard zone, just above…

Neubau Schwimm- und Sporthallen Campus Sursee

Oberkirch, Switzerland

Start of construction: October 2016
Construction volume (value of our services): 39,1 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of new swimming pool and sports hall on Sursee campus

Basel, Roche Construction 02 (Roche Tower 2)

Basel, Switzerland

Start of construction: October 2016
Construction volume (value of our services): 17,9 M EUR Costs converted according to average yearly exchange rates during project realization

The joint venture for Roche Construction 02, consisting of the Foundation Engineering business unit of Implenia Switzerland Ltd. and BAUER Schweiz AG, was instructed by Hofmann – La Roche in 2016 to construct the excavation pit…

Retirement living Silber

Schaffhausen, Switzerland

Start of construction: September 2016
Construction volume (value of our services): 102 M EUR Costs converted according to average yearly exchange rates during project realization

In Schaffhausen, a retirement housing project was built to the Minergie standard.

Düdingenplus, Étapes 2 et 4

Düdingen, Switzerland

Start of construction: July 2016

The Düdingenplus project was initially developed jointly by Implenia Suisse SA's subsidiaries in Fribourg and Bern. It consists of eight residential buildings with commercial areas that now stand opposite Guin/Düdingen railway…

Am Glattbogen

Zurich, Switzerland

Start of construction: July 2016
Construction volume (value of our services): 73,5 M EUR Costs converted according to average yearly exchange rates during project realization

Replacement construction at "Am Glattbogen" with 229 rental apartments, commercial zones and childcare facilities.

Résidence Les Hauts de Drize

Plan-les-Ouates, Switzerland

Start of construction: June 2016

Proche du Salève, à cinq minutes du centre de Carouge, dans la commune genevoise de Plan-les-Ouates, la parcelle se situe sur la Route d’Annecy, dans un cadre privilégié du fait d’une végétation abondante dans un environnement…

Promenade des Artisans, Meyrin

Meyrin, Switzerland

Start of construction: June 2016

The Promenade des Artisans project in Meyrin, originally planned for large villas, was converted into a residential building with 66 age-appropriate flats and activity zones due to the need for medical facilities. …

Neubau Schulpavillon Steinmürli

Dietikon, Switzerland

Start of construction: May 2016
Construction volume (value of our services): 1,8 M EUR Costs converted according to average yearly exchange rates during project realization

Six classrooms and nursery rooms for a total of 110 children, provided for the start of the 2017/2018 school year.

Sanierung Abwasseranlagen Breitenrain

Bern, Switzerland

Start of construction: May 2016
Construction volume (value of our services): 12,6 M EUR Costs converted according to average yearly exchange rates during project realization

The sewer systems in Viktoriastrasse and Moserstrasse in Bern have reached their age and are being replaced.

Security Centre

Weinfelden, Switzerland

Start of construction: May 2016
Construction volume (value of our services): 7,1 M EUR Costs converted according to average yearly exchange rates during project realization

New security center for Weinfelden

GIBZ Bildungszentrum Trakt 5

Zug, Switzerland

Start of construction: April 2016
Construction volume (value of our services): 11,2 M EUR Costs converted according to average yearly exchange rates during project realization

Educational center with 20 classrooms, 10 group rooms and 1 seminar room.

Andreasturm

Zürich, Switzerland

Start of construction: April 2016
Construction volume (value of our services): 89,5 M EUR Costs converted according to average yearly exchange rates during project realization

SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…

Vogelsang

Wetzikon, Switzerland

Start of construction: April 2016
Construction volume (value of our services): 7,3 M EUR Costs converted according to average yearly exchange rates during project realization

The "Vogelsang" housing estate is situated in Wetzikon-Kempten, nestled between forests and farming land. The existing buildings are being modernised in several stages, with new construction also taking place in some parts. In…

Biogen BMC, civil works & structural steel

Luterbach, Switzerland

Start of construction: January 2016

Realization of the project "Next Generation Manufacturing" of Biogen in Luterbach.

Neubau Schulhaus Rotweg

Wädenswil, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 780.000 EUR Costs converted according to average yearly exchange rates during project realization

In parts four stories high, the project is situated atop a public parking garage.

Kabel Galerie

Lausanne, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 10,3 M EUR Costs converted according to average yearly exchange rates during project realization

As part of the preparatory work for the Lausanne train station construction site, all the cables managing the region's rail activity had to be diverted. To do this, we have excavated and sealed two wells 27.00 and 22.00 deep, for…

Neubau Hallenbad Oberes Rheintal in Altstätten

Altstätten, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 17,5 M EUR Costs converted according to average yearly exchange rates during project realization

Demolition work with pollutant cleanup of existing HB new indoor swimming pool.

Fährenpark

St. Margrethen, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 13,6 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of four apartment buildings with 36 apartments.

Lokstadt

Winterthur, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 680 M EUR Costs converted according to average yearly exchange rates during project realization

A modern, urban and sustainable new district with fascinating industrial history in the heart of Winterthur

Biel Residential development Jardin du Paradis

Biel, Switzerland

Start of construction: October 2015
Construction volume (value of our services): 78,3 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.

sue & til

Winterthur, Switzerland

Start of construction: October 2015
Construction volume (value of our services): 109 M EUR Costs converted according to average yearly exchange rates during project realization

One of the largest timber construction projects in Switzerland - residential development with commercial space.

Zentralstrasse 37– Town Town

Zürich, Switzerland

Start of construction: September 2015
Construction volume (value of our services): 16,5 M EUR Costs converted according to average yearly exchange rates during project realization

The 1970s office building has undergone total renovation and conversion creating a residential building with 35 flats, 3 studio flats and 4 commercial units on the ground floor.

Neubau Alterspflegeheim Humanitas

Riehen, Switzerland

Start of construction: September 2015
Construction volume (value of our services): 25,7 M EUR Costs converted according to average yearly exchange rates during project realization

A new building is planned for a nursing home for the elderly with a garden in Riehen, Niederholz. The building has a basement, a ground floor and three upper floors.

Pont Rouge Lot B1

Lancy, Switzerland

Start of construction: August 2015
Construction volume (value of our services): 11,5 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of a complex for SBB Real Estate consisting of three towers of 13 to 15 floors (total area of 47'365 m2 of offices and shops) but also an underground parking of 353 places on 3 levels of basements over the entire…

Renovation on Rheinsfelderstrasse

Eglisau, Switzerland

Start of construction: August 2015
Construction volume (value of our services): 584.000 EUR Costs converted according to average yearly exchange rates during project realization

The "Rheinsfelder Hof" is a former barn with a distinctive supporting structure and striking roof. Six apartments have been integrated into the building, each combined with contemporary elements and modern comforts. …

Ceres Tower

Pratteln, Switzerland

Start of construction: August 2015
Construction volume (value of our services): 7,9 M EUR Costs converted according to average yearly exchange rates during project realization

The high-rise building is a mixed use of office and residential

Villa Boveri

Baden, Switzerland

Start of construction: July 2015
Construction volume (value of our services): 287.000 EUR Costs converted according to average yearly exchange rates during project realization

Preservation work on the historic, 125 year old Villa along with the extension of the top floor staff rooms and installation of a dampening mass in the conference rooms.

Swisspor Châtel II

Châtel-Saint-Denis, Switzerland

Start of construction: July 2015

In 2010, insulation manufacturer Swisspor opened the largest production facility for insulation materials in Switzerland in Châtel-Saint-Denis. Today, the Swiss market leader for expanded polystyrene has built a second factory on…

Primary school centre «Elisabetha Hess»

Weinfelden, Switzerland

Start of construction: July 2015
Construction volume (value of our services): 16,6 M EUR Costs converted according to average yearly exchange rates during project realization

The primary school center "Elisabetha Hess" is the first school center in the canton of Thurgau with Minergie-A certification.

INAD (Entreprise Générale)

Meyrin, Switzerland

Start of construction: June 2015

Due to the federal authorities' requirement to create a centre for asylum seekers and people who have been refused entry to Switzerland, Geneva Airport had to find a new location for the construction of a building in 2012, as the…

Rhône-Monnaie

Genève, Switzerland

Start of construction: June 2015

Crédit Suisse has been based at Bel-Air Square since 1906 and has expanded its activities and space over the years; a major renovation project in the 21st century optimised the working conditions and use of the buildings,…

Borné Nau, Grandson

Grandson, Switzerland

Start of construction: June 2015

Located on the shores of Lake Neuchâtel, the municipality of Grandson is experiencing steady and regular population growth and now has 3,000 inhabitants. The number of pupils is growing proportionally and an adaptation of the…

Hôtel des patients, Lausanne

Lausanne, Switzerland

Start of construction: June 2015

The desire to provide medical services while offering a hotel-like welcome has prompted the CHUV to adapt its services to inpatients. To welcome them, the Hôtel des Patients (patients' hotel) was opened in October 2016. …

PPE Rhône11, Aigle VD

Aigle, Switzerland

Start of construction: June 2015

Ateliers Jean-Jaques Gippa have moved from Rue du Rhône to the Les Artisans industrial estate in Aigle. The demolition of the old buildings made the second phase of the project, which began ten years ago, possible. PPE Rue du…

Immeuble LINK, Lausanne

Lausanne, Switzerland

Start of construction: June 2015

Vaudoise Insurance, the owner of the Link building, which is located near the Parc Mon-Repos and the train station, wanted to upgrade its building, built in 1976 by J.-P. Lavizzari, and at the same time give it a new identity. …

PPE Alezane, Vufflens-La-Ville

Vufflens-la-Ville, Switzerland

Start of construction: June 2015

Anchored in the heart of Vufflens-la-Ville, a quiet village in Grosde-Vaud just outside Lausanne, the "Alezane" residence - the proximity to a stud farm gave the project its name - comprises ten three-and-a-half to…

Quartier Boverattes-Est, Pully

Pully, Switzerland

Start of construction: June 2015

The landscape of the Lavaux region was shaped to tame the slopes, whether for working in the vineyard or for living. The municipality of Pully, the owner of the land, realised that many residents were leaving the municipality…

Zürich, ETH Gloriastrasse

Zürich, Switzerland

Start of construction: June 2015
Construction volume (value of our services): 15,1 M EUR Costs converted according to average yearly exchange rates during project realization

For construction of the new research and laboratory building GLC in the university district in central Zurich, the existing Hydraulics, Hydrology and Glaciology (VAW) building and the Gloriabar on Gloriastrasse were dismantled.…

SBB Bözbergtunnel

Strihen, Switzerland

Start of construction: May 2015
Construction volume (value of our services): 134 M EUR Costs converted according to average yearly exchange rates during project realization

The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project. …

Neubau Wohnen im Knonau

Knonau, Switzerland

Start of construction: March 2015
Construction volume (value of our services): 15,6 M EUR Costs converted according to average yearly exchange rates during project realization

Residential development with 3 MFH with 5 apartments each and 5 EFH.

Neubau Wohnheime Rathausen SSBL

Emmen, Switzerland

Start of construction: March 2015
Construction volume (value of our services): 19,9 M EUR Costs converted according to average yearly exchange rates during project realization

New construction 3 dormitories with 90 resident rooms.

St. Gallen, Schuppis new construction

St. Gallen, Switzerland

Start of construction: February 2015
Construction volume (value of our services): 4,2 M EUR Costs converted according to average yearly exchange rates during project realization

To expand the premises of K+D AG on the Schuppis industrial estate in St. Gallen, an extension featuring a four-level underground parking garage and five above-ground floors was built.

Trèfle Campus Santé

Le Grand-Saconnex, Switzerland

Start of construction: January 2015

Since the first quarter of the 20th century, it has been an implicit tradition for Geneva to host its international organizations on the right bank of Lake Geneva. This choice was justified in particular by the proximity of the…

ETH HWW Living Science

Zürich, Switzerland

Start of construction: January 2015
Construction volume (value of our services): 2,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

Neubau Felix Platter Spital, Basel

Basel, Switzerland

Start of construction: January 2015
Construction volume (value of our services): 201 M EUR Costs converted according to average yearly exchange rates during project realization

A completely new building will be constructed at the current location on Burgfelderstrasse for around CHF 200 million. The current situation with the hospital built in 1967 no longer meets the structural and operational…

Dangelweg 1/3

Zurich-Wollishofen, Switzerland

Start of construction: December 2014
Construction volume (value of our services): 8,2 M EUR Costs converted according to average yearly exchange rates during project realization

Conversion and addition of a new storey to residential building with 42 flats

Lyss Portalyssa residential development

Lyss, Switzerland

Start of construction: November 2014
Construction volume (value of our services): 47,7 M EUR Costs converted according to average yearly exchange rates during project realization

New residential development on a former commercial site in the immediate vicinity of Lyss railway station. The 143 flats are divided into 5 structures.

New building Parking II Roche

Kaiseraugst, Switzerland

Start of construction: September 2014
Construction volume (value of our services): 10,7 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a parking garage with 9 parking decks, 2 access spirals and 4 staircases in in-situ concrete and elements

Neubau Wohnüberbauung Feldbreite Baufeld D2

Emmen, Switzerland

Start of construction: September 2014
Construction volume (value of our services): 35,7 M EUR Costs converted according to average yearly exchange rates during project realization

Residential development with 151 apartments and commercial space on the ground floor, underground parking with 131 parking spaces.

Hinterkappelen Capella residential development

Hinterkappelen Wohlen, Switzerland

Start of construction: September 2014
Construction volume (value of our services): 22,8 M EUR Costs converted according to average yearly exchange rates during project realization

74 rental flats in Minergie standard

Schoren Hochhäuser

Basel, Switzerland

Start of construction: July 2014
Construction volume (value of our services): 40,2 M EUR Costs converted according to average yearly exchange rates during project realization

The construction project comprises the new construction of two high-rise buildings with 18 and 16 upper floors respectively. Both buildings have two basement floors. The existing car park was structurally repaired and adapted to…

Les Platanes, Genève

Genève, Switzerland

Start of construction: June 2014

The project on the Route de Meyrin in Geneva comprises the construction of five residential buildings with 72 flats and a police station, with construction work taking around 18 months following the demolition of the villas. …

Bâtiments administratif et commerces, La Sallaz

Lausanne, Switzerland

Start of construction: June 2014

From car junction to pedestrian square. The Place de La Sallaz in the upper part of Lausanne - one of the few horizontal areas in the city - had become the main intersection where car flows from five major roads coming from or…

Garage AMAG, Etoy

Etoy, Switzerland

Start of construction: June 2014

The large plateau that forms the shopping area of Etoy is filling up at breakneck speed. One of the most recent inaugurations is the new garage of the Swiss representative of a major German car manufacturer. It is located at the…

Umbau und Erweiterung Schulhaus Hasel.

Spreitenbach, Switzerland

Start of construction: June 2014
Construction volume (value of our services): 19,2 M EUR Costs converted according to average yearly exchange rates during project realization

The municipality of Spreitenbach decided to renovate the original 1960s building, because the school no longer met today’s requirements and was clearly a candidate for major refurbishment.

Residential and commercial development Witenzelg

Romanshorn, Switzerland

Start of construction: June 2014
Construction volume (value of our services): 44 M EUR Costs converted according to average yearly exchange rates during project realization

The Witenzelg residential and commercial development is a housing estate with 10 apartment buildings. It was realized according to the Minergie standard.

Modulis Business Park

Versoix, Switzerland

Start of construction: May 2014

Birth of a new business center 10 km from Geneva. Versoix can be reached by the "Route Suisse", by two SBB stations or by the CGN boats from the Swiss and French coastal towns. Geneva's public transport system also serves 11 bus…

Crèche Origami

Geneva, Switzerland

Start of construction: February 2014

Geneva displays its international dimension first and foremost on its right bank. Permanent missions, headquarters of organizations or large companies, this part of the city has not ceased to develop for nearly a hundred years.…

Migros Ticino

Lugano, Switzerland

Start of construction: January 2014
Construction volume (value of our services): 22,2 M EUR Costs converted according to average yearly exchange rates during project realization

Conversion and renovation; facade renovation

Neubau Wellnesshostel Aqua Allin

Saas Fee, Switzerland

Start of construction: November 2013
Construction volume (value of our services): 981.000 EUR Costs converted according to average yearly exchange rates during project realization

Four story wood building with a ventilated wood façade.

Construction Sunnewiese

Islikon, Switzerland

Start of construction: July 2013
Construction volume (value of our services): 23,6 M EUR Costs converted according to average yearly exchange rates during project realization

The Sunnewiese development is a new construction project with seven buildings.

Petite-Prairie, Nyon

Nyon, Switzerland

Start of construction: June 2013

After many years of delays, the La Petite-Prairie residential project in Nyon was launched, with Implenia taking on the coordination and construction of 150 flats and 8,000 square metres of office space.

Centror-Ritschard

Meyrin, Switzerland

Start of construction: June 2013

Centror, a subsidiary of watch manufacturer Audemars-Piguet, was too cramped at its old production site and needed to find a new location for its activities. The plot of land the company had its eye on appeared to be a good…

Crèche Origami, Genève

Genève, Switzerland

Start of construction: June 2013

Geneva shows its international dimension particularly on the right side of the lake, where permanent missions, headquarters of organisations and large companies have been located for almost a hundred years; in the 21st century,…

Gamma Visions Center, Etoy

Etoy, Switzerland

Start of construction: June 2013

Halfway between Geneva and Lausanne, the municipality of Etoy has an important area of 112 hectares. This area, Littoral Parc, was initially intended for the establishment of stores. As it is well connected to the road network,…

Ecole La Planchette, Aigle

Aigle, Switzerland

Start of construction: June 2013

On a 18,218 m2 meadow adjacent to the Collège de la Planchette and classified as a public utility zone, the municipality of Aigle wanted to build infrastructure for pre-school and extracurricular care to meet the strong demand…

Business Parc, Prilly

Prilly, Switzerland

Start of construction: June 2013

On the former site of the Bobst company, now based in Mex (VD), this disused industrial area in Prilly is coming back to life. At the crossroads of Route de Renens and Route des Flumeaux, the project has a special role to play…

Funicular railway Schwyz-Stoos

Schwyz, Switzerland

Start of construction: May 2013
Construction volume (value of our services): 22 M EUR Costs converted according to average yearly exchange rates during project realization

The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle…

"Neugrüen" residential complex

Mellingen, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 10,7 M EUR Costs converted according to average yearly exchange rates during project realization

Multi-story wooden structures erected in prefabricated elements with a wood façade. The project meets Minergie P ECO standards.

Zellweger Park

Uster, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 1,2 M EUR Costs converted according to average yearly exchange rates during project realization

5000 m² of ventilated façade with wood cladding

Renergia waste incineration plant

Renergia Zentralschweiz, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 6 M EUR Costs converted according to average yearly exchange rates during project realization

Renergia in Perlen (LU) is a modern and environmentally friendly waste incineration plant.

Sportpark Bergholz

Wil, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 46,4 M EUR Costs converted according to average yearly exchange rates during project realization

Overall renovation of the sports and recreational facility.

Syngenta Project ROSE

Basel, Switzerland

Start of construction: June 2012
Construction volume (value of our services): 40 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of the staff restaurant. Subsequently, the existing restaurant was demolished and converted into a piazza.

Modulis Business Park, Versoix

Versoix, Switzerland

Start of construction: June 2012

Versoix, an attractive town on the Léman with a population of 13,000, is planning to develop a new regional business centre while retaining its rural charm.

Bon Park, Quartier de la Chapelle

Grand-Lancy, Switzerland

Start of construction: June 2012

The new La Chapelle neighbourhood in Geneva comprises eighteen buildings with residential and commercial space as well as a large public park and represents a major urban development project.

Center de Chirurgie Ambulatoire, Lausanne

Lausanne, Switzerland

Start of construction: June 2012

The new building is located in the immediate vicinity of the CHUV (Centre Hospitalier Universitaire Vaudois) on Avenue de Beaumont and houses six rooms for outpatient surgery in its lower part, which are mainly dedicated to the…

Flumeaux 41, Prilly

Prilly, Switzerland

Start of construction: June 2012

Built on the site of the former HIFIPAC factory, the administration building is seen by numerous passers-by and motorists traveling in this fast-growing industrial district. This prime location presented the owner with the…

En Pontet - Center scolaire et crèche, Echichens

Colombier, Switzerland

Start of construction: June 2012

In the spring of 2006, the planned merger of the four municipalities of Colombier, Echichens, Monnaz and St. Saphorin-sur-Morges led to the formation of a working group to replace three outdated classrooms in Colombier and to the…

Herisau Kasernenareal

Herisau, Switzerland

Start of construction: May 2012
Construction volume (value of our services): 25,3 M EUR Costs converted according to average yearly exchange rates during project realization

In June 2012, the foundation stone was laid in Herisau for the planned adaptations to the barracks buildings. The intact load-bearing structure and the existing generous room layout in the multi-storey old building made of…

Elephant House, Zürich Zoo

Zurich, Switzerland

Start of construction: April 2012
Construction volume (value of our services): 9,9 M EUR Costs converted according to average yearly exchange rates during project realization

Our Elephant House covers over 5,000 square meters of the new 10,000 square meter Elephant paddock at the Zürich Zoo.

Hochhaus Park Tower

Zug, Switzerland

Start of construction: January 2012
Construction volume (value of our services): 79,1 M EUR Costs converted according to average yearly exchange rates during project realization

Park Tower high-rise building

Zürich-Oerlikon Bahnhofausbau Gleis 7+8

Zürich, Switzerland

Start of construction: January 2012
Construction volume (value of our services): 9,4 M EUR Costs converted according to average yearly exchange rates during project realization

The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train…

Terre Bonne Park, Centre administratif

Eysins, Switzerland

Start of construction: June 2011

Located 15 minutes from Geneva International Airport, 20 minutes from Lausanne and served by TPN (Transports publics de Nyon), "Terre Bonne Park" offers all the features that can attract international companies looking for a…

CUG, Cité Universitaire

Genève, Switzerland

Start of construction: June 2011

The Cité universitaire de Genève is located on the heights of the residential neighbourhood of Champel and has been home to students from all over the world for several generations.

Le Pré-Du-Mont, Lausanne

Le Mont-sur-Lausanne, Switzerland

Start of construction: June 2011

With 42 condominiums, this project blends harmoniously into a pleasant environment that forms the transition between residential areas and a site area reserved for services and ancillary activities. The slope of the plot allows a…

UEFA Bois-Bougy, Nyon

Nyon, Switzerland

Start of construction: June 2011

The administrative building in Bois-Bougy is now part of the new UEFA campus. The main project of former President Michel Platini is to promote a healthy image of football and the associations that govern it, through the notions…

Center CSS Romandie, Lausanne

Lausanne, Switzerland

Start of construction: June 2011

The plot is part of the cantonal development plan (PAC) for the Biôpole site, which is primarily intended to accommodate companies from the health and medical sciences sectors.

Résidence La Miroiterie, Lausanne

Lausanne, Switzerland

Start of construction: June 2011

This neighborhood was relatively unsightly for several decades due to its industrial vocation, its proximity to the Sébeillon paths and the marginal activities of all kinds that developed there. This plot opposite the Ecole des…

Sallivaz Vergers, Chavannes-de-Bogis

Chavannes-de-Bogis, Switzerland

Start of construction: June 2011

The "Sallivaz Vergers" residential area is the continuation of the first stage, "Sallivaz Village", which began in 2010 with the construction of three buildings with a total of 29 apartments. The new buildings are located in the…

Les Grands Champs, Epalinges

Epalinges, Switzerland

Start of construction: June 2011

At the exit of the municipality of Epalinges above Lausanne, there was a large field of 9,200 square meters bordered by a wooded hill, an avenue of trees and the Berner Strasse. A tennis hall and a former carpentry workshop were…

Flon Pépinières, Lausanne

Lausanne, Switzerland

Start of construction: June 2011

Located in the heart of Lausanne, the Flon district is a reference for the city, both topographically and morphologically and in terms of revitalizing the city center. Built in the old bed of the Flon river on an artificial…

Grands-Champs, Epalinges

Epalinges, Switzerland

Start of construction: June 2011

At the exit of the commune of Epalinges, on the heights of Lausanne, there was a large field of 9,200 square meters bordered by a wooded hill, an avenue of trees and the Bern road. Following the demolition of the tennis hall and…

Central Parc, Nyon

Nyon, Switzerland

Start of construction: June 2011

The building is part of a neighbourhood plan that aims to urbanize a green valley in the immediate vicinity of the city center, north of Nyon railroad station. The building complex is a completely new quarter in the heart of Nyon…

OMC Extra Muros

Romont, Switzerland

Start of construction: January 2011

Respond to growth and consolidate all activities on a single site. The WTO's current headquarters is located in Geneva and houses approximately 900 staff. It houses the various departments of the Secretariat, as well as…

LCA Supercomputing Center

Lugano, Switzerland

Start of construction: July 2010
Construction volume (value of our services): 35,5 M EUR Costs converted according to average yearly exchange rates during project realization

New construction LCA Supercomputing Center Turnkey construction Construction and building services work Office building with four floors

Extension du Campus des Nations

Grand-Saconnex, Switzerland

Start of construction: June 2010

The new building was erected on an 18,993 square metre site, the school's existing location in the municipality of Grand-Saconnex. It complements the school built in 2004-2005, which already occupied 3,500 square metres and was…

Beaulieu, Halles Sud, Lausanne

Lausanne, Switzerland

Start of construction: June 2010

The exhibition hall, which formed the south wing of the Beaulieu complex in Lausanne, no longer met the requirements of a modern multi-purpose facility with its half levels. As part of a major modernization project for the entire…

BrainServe SA, DataCenter, Crissier

Crissier, Switzerland

Start of construction: June 2010

The building stands on a 6,500 m2 plot of land in an industrial and commercial zone on the site of an old factory. The building is to house electronic data processing centers and corresponds to a program whose keyword is "global…

Sallivaz Village, Chavannes-de-Bogis

Chavannes-de-Bogis, Switzerland

Start of construction: June 2010

Sallivaz Village is the result of a merger of two plots of approximately 6,389 m2 located in a village zone in the heart of the commune of Chavannes-de-Bogis, 10 minutes from Nyon and 15 minutes from Geneva. The new residential…

Center Socio Culturel, Ecublens

Ecublens, Switzerland

Start of construction: June 2010

The Le Croset municipal site, which covers just over one hectare, is located in a central area of Ecublens and is adjacent to two shopping centers, several schools, the town's public services, the swimming pool and numerous…

Résidence du Bois 29 A-B, Ecublens

Ecublens, Switzerland

Start of construction: June 2010

New center of the municipality. The center of Ecublens is moving from Le Motty to Le Croset. The municipal site, which covers just over one hectare, is adjacent to the Coop and Migros shopping centers, several schools, the town's…

L'Epi d'Or, Cugy

Cugy, Switzerland

Start of construction: June 2010

The municipality of Cugy, just outside Lausanne, has seen a sharp increase in its population. During the period in which the "L'Épi d'Or" project was realized, the number of inhabitants rose from around 2,400 to 2,800. …

Bon-Park

Lancy, Switzerland

Start of construction: August 2009

A place to (re)invent. Eighteen buildings, tens of thousands of square meters of housing, three thousand five hundred inhabitants planned, commerce and a large public park: the new district of La Chapelle is a major urban…

AGENHOR SA

Meyrin, Switzerland

Start of construction: June 2009

An industrial building of modest size, this exemplary project offers industrial and administrative spaces developed on two levels and suitable for any possibility of development over time.

Villas Bois des Arts, Thônex

Thônex, Switzerland

Start of construction: June 2009

The plot is located in the villa zone of the municipality of Thônex and has an area of 10,284 square metres with a beautiful south/south-east orientation. The plot offers space for thirteen villas, which are connected by a…

Résidence du Château, St-Livres VD

St-Livres, Switzerland

Start of construction: June 2009

The municipality of Saint-Livres is located on La Côte, above Aubonne and Lavigny, with views of Lake Geneva and the Alps. The "Résidence du Château" forms a significant extension to the north of the village for a community of…

Résidence Beau-Séjour, Nyon

Nyon, Switzerland

Start of construction: June 2009

The 4,766 m2 plot, formerly used for agricultural purposes, is part of a neighborhood plan whose rather restrictive rules stipulated a division into four blocks connected by stairwells and elevators. The buildings represent a new…

Résidence Pré-Fleuri, Nyon

Nyon, Switzerland

Start of construction: June 2009

Building C of the "Le Boiron" district plan in Nyon is intended exclusively for residential purposes and offers 35 apartments designed and built for sale as individual properties. (PPE)

Chemin des Fins 5 à 5C, Grand-Saconnex

Grand-Saconnex, Switzerland

Start of construction: June 2008

The town of Grand-Saconnex is under strong demographic pressure due to the completion of two neighbourhood plans, namely Le Pommier and Chemin des Fins. Nevertheless, the infrastructure has not been neglected and the…

Domaine de Maisonneuve

Vernier, Switzerland

Start of construction: June 2008

The Plan localisé de quartier de Maisonneuve was initiated in 1986 and led to planning permission 20 years later.

Urbania, Genève

Genève, Switzerland

Start of construction: June 2008

The building stands on a 1,500 square metre plot in place of the Roseraie temple in the heart of Geneva, between the hospital, Carouge and Plainpalais, not far from the banks of the River Arve.

Lancy Les Mouilles II

Petit-Lancy, Switzerland

Start of construction: June 2008

Lancy-centre is an extension of a shopping centre built some twenty years ago on the edge of the Route de Chancy alongside two bank buildings that cover the Collège de Saussure.

Wipo-Ompi, Genève

Genève, Switzerland

Start of construction: June 2008

The World Intellectual Property Organisation (WIPO) employs around 1,300 people at its site in Geneva, near the Place des Nations. The building completes a complex of five buildings and this new stage of development materialises…

Métropole Lausanne

Lausanne, Switzerland

Start of construction: June 2008

The Métropole complex is considered the "oldest shopping center in Lausanne" and is a major attraction for the west of the municipality. It is located at the junction of Rue des Terreaux, the eastern exit of Place Chauderon, and…

Migros Interio, Etoy VD

Etoy, Switzerland

Start of construction: June 2008

Halfway between Lausanne and Rolle, served by the Aubonne highway junction, the "Littoral Parc" industrial and commercial area stretches between the highway and the cantonal road over a long stretch shared by the municipalities…

Les Résidences du Bois, Vers-Chez-Les-Blancs VD

Lausanne, Switzerland

Start of construction: June 2008

In the municipality of Lausanne, in Vers-chez-les-Blanc, the Route de Marin meets the Route de la Claie-aux-Moines in the direction of Savigny. The location is pleasant and privileged for those who like to live in the countryside…

En Belle-Vue, Renens VD

Renens, Switzerland

Start of construction: June 2008

The staggered arrangement of the buildings allows optimum views from the apartments.

Rue de Genève 75

Lausanne, Switzerland

Start of construction: June 2008

This building was constructed in 1959 and is fairly typical of the buildings erected at that time, both in terms of its design and execution.

Philip Morris International, Avenue de Cour 107

Lausanne, Switzerland

Start of construction: June 2008

Following the construction and commissioning of its new operations center, the Group began renovating its original building to enable full integration into the site's functional and qualitative organization.

Easy Day, Etablissement Hospitaliers du Nord Vaudois

Yverdon-les-Bains, Switzerland

Start of construction: June 2008

The building meets a growing demand in the field of outpatient surgery and, as a first step, provides the necessary space to relieve the pressure on the current buildings.

Philip Morris International, Crèche Rhodanie Campus, Lausanne

Lausanne, Switzerland

Start of construction: June 2008

The daycare center that PMI has built next to its new center in Lausanne is embedded in a sloping terrain that forms a series of gardens. The gardens are a continuation of the park adjacent to the company's headquarters. …

Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft

Zurich, Switzerland

Start of construction: May 2008
Construction volume (value of our services): 7,7 M EUR Costs converted according to average yearly exchange rates during project realization

For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…

Zurich cross-city link, lot 2, Löwenstrasse train station

Zurich, Switzerland

Start of construction: May 2008
Construction volume (value of our services): 23,9 M EUR Costs converted according to average yearly exchange rates during project realization

The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…

Pumpspeicherkraftwerk Nant de Drance

Finhaut VS (Le Châtelard), Switzerland

Start of construction: January 2008
Construction volume (value of our services): 602 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of an underground pumped-storage power station for the Nant de Drance pumped-storage power plant.

Route du Bois-des-Frères, Vernier

Vernier, Switzerland

Start of construction: June 2007

The buildings are located on three adjacent plots totalling 4,500 square metres in development zones 4B and 5 on the corner of Route du Bois-des-Frères and Route d'Aïre in the municipality of Vernier.

Résidence les Tilleuls, Chavannes

Chavannes-près-Renens, Switzerland

Start of construction: June 2007

The building is located on a flat plot with a balanced geometry on the edge of a medium-density development area.

EMS Le Pacific, Etoy

Etoy, Switzerland

Start of construction: June 2007

The 9,260 m2 plot borders the Etoy industrial estate, halfway between Morges and Rolle. The construction of a care home in this highly strategic industrial area, in the middle of a very dense customer pool, is an expression of…

Ilot du Centre, Blonay VD

Blonay, Switzerland

Start of construction: June 2007

The restructuring of the center of the municipality of Blonay has been a priority goal of the municipal administration for many years. In order to achieve this goal, it has taken the necessary steps in parallel to master the land…

Center Sportif de la Châtaigneraie, Founex VD

Founex, Switzerland

Start of construction: June 2007

The building, with a volume of 22,400 SIA cubic meters, includes a double gymnasium with stands for 200 people, a multi-purpose hall, a public hall and a bar, which are to be integrated into the Châtaigneraie complex. …

Weinbergtunnel DML SBB Zürich ATW

Zürich, Switzerland

Start of construction: January 2007
Construction volume (value of our services): 257 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of a two-track railway tunnel with a TBM.

Les Pommes d'Or

Veyrier, Switzerland

Start of construction: June 2006

The two building lots, each with four semi-detached houses, meet the continuing demand for high-quality detached houses that combine several criteria that are valued by modern young middle-class families.

Caserne des Pompiers

Vésenaz, Switzerland

Start of construction: June 2006

The fire brigade's premises, which have been located in the centre of the village of Collonge for decades, no longer met the requirements and constraints to which this public service is subject today.

Centre d'Activités Onex-Jardins

Onex, Switzerland

Start of construction: June 2006

The building is located on the border between the municipalities of Onex and Lancy on the Avenue des Grandes-Communes. Its set-back position defines a space that marks the entrance to the town of Onex on the one hand and…

Permanent Mission of Singapore in Geneva

Genève, Switzerland

Start of construction: June 2006

The building is part of a local neighbourhood plan that also includes a residential building, which was planned and built by the same planners and the same general contractor.

Conforama, Villeneuve

Villeneuve, Switzerland

Start of construction: June 2006

The building is located in the industrial zone of Villeneuve and is part of the "Pré-neuf II" district plan, which was legalized in 2005. Its location in an industrial and commercial development area, at the mouth of the Rhône…

Rue Marteray 33, Lausanne

Lausanne, Switzerland

Start of construction: June 2006

The building is a residential building in the city center of Lausanne that illustrates the typology and arrangement of terraced houses along the historic axes leading into the city. The relatively quiet Rue Marterey, along which…

Rue Caroline 15, Lausanne

Lausanne, Switzerland

Start of construction: June 2006

It runs from south to north and forms a link between the traditional shopping district of Rue de Bourg and the newer developments upstream towards the Cité Hospitalière.

CISCO Systems, Rolle

Rolle, Switzerland

Start of construction: June 2006

The client's decision to locate its technology center in Rolle is strongly linked to the presence of EPFL and the potential for the creation of high value-added companies in French-speaking Switzerland. To demonstrate the…

Métraux Transports, Savigny

Savigny, Switzerland

Start of construction: June 2006

This building is located in the municipality of Savigny within the perimeter of the "PPA la Claie aux Moines 2" land-use plan and borders on the Claie aux Moines cantonal road.

O2

Onex, Switzerland

Start of construction: April 2006

An extension in continuity. The "O2" building extension is located at the junction of the communes of Onex and Lancy, along the Avenue des Grandes-Communes. It is the second stage of a project for an activity building established…

Fiedler SA

Carouge, Switzerland

Start of construction: June 2005

The new 20,000 cubic metre SIA is located on a 3,000 square metre site on the slope of a hill that marks the transition between the La Praille industrial area and the surrounding countryside just outside Geneva.

Le Jonc, Grand-Saconnex

Le Grand-Saconnex, Switzerland

Start of construction: June 2005

The buildings stand on a beautiful plot with a gentle slope in a quiet neighbourhood in the municipality of Grand-Saconnex.

Lancy Innovation Center

Petit-Lancy, Switzerland

Start of construction: June 2005

Located at the end of a development area with high-quality buildings, the approximately 11,000 square metre site was home to the activities of an Implenia Group company for many years. In the 1990s, the site was gradually…

Montfleury Parc, Versoix

Versoix, Switzerland

Start of construction: June 2005

This imposing building with 48,736 cubic metres of SIA stands on a plot of 14,961 square metres in development zone 4B in the municipality of Versoix. It forms a new extension to the Montfleury neighbourhood, which is bordered by…

La Jaquière, Epalinges

Epalinges, Switzerland

Start of construction: June 2005

The project, with a total volume of 7,500 m3 SIA, consists of 12 condominiums in 6 adjoining villas. The project is the third stage of an overall plan of 12 adjoining residential groups regulated by a development plan adopted in…

Planchamp-Dessous, Montreux

Clarens, Switzerland

Start of construction: June 2005

The project is the result of a resumed study developed on the basis of an initial building permit granted in 2002 and concerns the upgrading of a plot of 7,083 m2 located in a neighborhood above Montreux made up of villas, some…

Les jardins de Tavel, Montreux

Clarens, Switzerland

Start of construction: June 2005

The hamlet of Tavel is located above Montreux on the territory of this municipality in a remarkable location, away from the major traffic flows and with a sweeping view of the panorama of Lake Geneva. The nearby river "La Baye",…

Parking de la Duche, Nyon

Nyon, Switzerland

Start of construction: June 2005

Between the lake and the castle, in a very sensitive area, the parking garage serves the old town and the Rive district. The project, which is accessed exclusively via paths that do not lead through the center, was born out of…

Bâtiment Extranef, Chavannes-près-Renens

Chavannes, Switzerland

Start of construction: June 2005

According to the 1967 master plan, the Dorigny site is divided into three zones, which are assigned to the Faculty of Science in the west, the common rooms in the middle and the Faculty of Humanities in the east. The latter zone…

Sablon 2-4, Morges

Morges, Switzerland

Start of construction: June 2005

The building is part of the "Sablon-Nord" district plan in Morges, which is located not far from the town center and the SBB train station. The ordinance, which was legalized in 1989, permits the establishment of administrative,…

Generali, Nyon

Nyon, Switzerland

Start of construction: June 2005

The headquarters of the Generali insurance group in western Switzerland occupies a 4,921 m2 plot of land included in the "Perdtemps-St-Jean" district plan in Nyon. It is adjacent to the SBB site, i.e. in the immediate vicinity of…

Coopérative INTI

Confignon, Switzerland

Start of construction: June 2004

The 19 flats and the underground car park with 22 parking spaces defined in the programme are located on a plot of 2,311 square metres with a total volume of 12,145 cubic metres SIA. The plot is located in the municipality of…

Ecole Internationale de Genève

Grand-Saconnex, Switzerland

Start of construction: June 2004

At the time, the school had 3,770 pupils spread across three sites in the Geneva region. With the construction of the building presented here, the school was able - at least in an interim phase - to cope with the steady influx of…

Résidence "Le Moulin Vert"

Aire-la-Ville, Switzerland

Start of construction: June 2004

The residential development, which is to be sold as a condominium, comprises a total of more than 19,000 cubic metres of SIA and offers a gross living area of 3,776 square metres just outside the Geneva conurbation. …

Mairie 35, Genève

Genève, Switzerland

Start of construction: June 2004

The building is located on the corner of Rue de la Mairie and Rue du Nant in the city of Geneva, close to a major transport axis.

Pailly Logement, Vernier

Vernier, Switzerland

Start of construction: June 2004

The building stands on a 2,480 square metre plot of land that is integrated into a neighbourhood plan of the municipality of Vernier.

Résidences du Boiron, Nyon

Nyon, Switzerland

Start of construction: June 2004

The two new buildings are situated in a pleasant location on the border with the municipality of Nyon. The steeply sloping terrain offers a view of a green and peaceful space formed by the strip of forest that fills the valley…

Rue Du Torrent, Vevey

Vevey, Switzerland

Start of construction: June 2004

The plot for this building with 41 large rental apartments marks the corner of Rue du Torrent and Rue de la Madeleine, halfway between the Veveyse and Place du Marché.

Parking du Rôtillon, Lausanne

Lausanne, Switzerland

Start of construction: June 2004

The Rôtillon district in Lausanne is one of the places where the city originally developed. It is located on the left bank of the Flon valley, which runs through the historic center from east to west. Clinging to the steep slope…

EPFL AI, Ecublens

Lausanne, Switzerland

Start of construction: June 2004

The building is located on the grounds of the Ecole Polytechnique Fédérale de Lausanne (EPFL), in line with the "AI" building, which itself was completed in 2002 when the third development stage of the university was implemented…

Philip Morris International Rhodanie Campus

Lausanne, Switzerland

Start of construction: June 2004

Philip Morris International has been based in Lausanne for many years at several locations, including Chemin du Liseron, Avenue de Brillancourt and Avenue de Cour. In June 2002, after acquiring an existing administrative building…

Les Hauts-de-Coppet, Coppet

Coppet, Switzerland

Start of construction: June 2004

The "Les Hauts de Coppet" estate is located in the upper part of the club resort, just a few hundred meters from the famous castle. It stretches between the lake and the Jura on a plot of 15,000m2.

Extension GPMG, Montreux

Montreux, Switzerland

Start of construction: June 2004

70 parking spaces between the platforms of Montreux station. The Park + Rail parking lot at Montreux railroad station, which opened in 1997, is located in the town center and offers direct access to the SBB - MOB…

Rue du Lac 128, Clarens

Clarens, Switzerland

Start of construction: June 2004

The residence enjoys a breathtaking view of Lake Geneva and is located on the border between the commercial area and the residential area of Clarens.

Amedis, Puidoux

Puidoux, Switzerland

Start of construction: June 2004

The plot consists of a flat piece of land with an area of around 23,000 m2. The location is ideal for the construction of a pharmaceutical distribution center, which is within easy reach of the largest urban centers in…

Avenue Dapples 24-26-28, Lausanne

Lausanne, Switzerland

Start of construction: June 2004

Built in 1932 in the Sousgare district, this classic Lausanne building is a fine example of civic architecture, just a few meters from the metro line that will disappear to make way for the new M2 line.

Rue Du Simplon 35, Vevey

Vevey, Switzerland

Start of construction: June 2004

Built in 1964, the building is in a prime location in the heart of Vevey, close to stores and public transport.

Usine EgoKiefer, Villeneuve

Villeneuve, Switzerland

Start of construction: June 2004

The EgoKiefer Group, the number one in the Swiss window and door business, had to react as quickly as possible to the very high order volume, which exceeded its production capacity. Expanding one of the production facilities was…

Métro Lausanne, M2 Lot 1700

Lausanne, Switzerland

Start of construction: March 2004
Construction volume (value of our services): 33 M EUR

Ouchy-Epalinges metro line via the Central Station and Place de l'Europe. Total length: 6 km, 14 stops, 9 tunnels and 5 bridges.

Parking des Rayes

Vésenaz, Switzerland

Start of construction: June 2003

The Les Rayes public car park commissioned by the municipality of Collonge-Bellerive is located on the road of the same name at the exit of the old village centre of Vésenaz on municipal land in the eastern part of the village. …

Le Train Bleu, Genève

Genève, Switzerland

Start of construction: June 2003

The building was erected on a former industrial and commercial site of 3,487 square metres and contributes to the upgrading of the site by creating a residential complex. It thus makes a decisive contribution to the integration…

Saint-Jean 21-29, Genève

Genève, Switzerland

Start of construction: June 2003

The two new buildings, which belong to an institutional investor, were erected on a plot of land between Rue St. Jean and Rue Miléant in Geneva and contribute to the densification of a neighbourhood that was previously partly…

Les Platanes C, Prilly

Prilly, Switzerland

Start of construction: June 2003

In an environment of good quality, the plot of 1,960 m2 allows the realization of a building with four floors plus attic, entirely intended for apartments.

Les Portes de Nyon, Nyon

Nyon, Switzerland

Start of construction: June 2003

The four buildings are located on Route du Boiron, on the north-western edge of the town of Nyon.

Résidence du Rhône, Aigle

Aigle, Switzerland

Start of construction: June 2003

The "Résidence du Rhône" is located in the heart of the town of Aigle, just a few hundred meters from the train station and the stores in the center, and offers a pleasant living space.

Sie SA, Crissier

Crissier, Switzerland

Start of construction: June 2003

The intermunicipal company based in the municipality of Crissier occupies a relatively flat and well-proportioned plot in the industrial zone, which is perfect for the construction of an industrial building that requires spacing…

Les Jardins d'Onex

Onex, Switzerland

Start of construction: March 2003

Former filling area. Located on the edge of the new city of Onex, the building benefits from a privileged situation with a magnificent view of the Jura and the cliffs of the Rhone. All amenities are nearby, shops and public…

Lötschberg Basistunnel

Niedergesteln, Switzerland

Start of construction: October 2002
Construction volume (value of our services): 515 M EUR Costs converted according to average yearly exchange rates during project realization

The Lötschberg base line runs from Frutigen to Raron. In the north, it includes the connection to the BLS line and the Frutigen bypass with the Engstligen tunnel, the Lötschberg base tunnel and, in the south, the Rhone crossing…

Europlex Cinémas Flon, Lausanne

Lausanne, Switzerland

Start of construction: June 2002

The new Multisaal complex in the city of Lausanne contributes to the long-awaited redevelopment of the Flon Valley in the heart of the city, where the old freight station and the Port-Franc are located. The new building will be…

Philip Morris International Rhodanie 50 - Rénovation 1ère Phase

Lausanne, Switzerland

Start of construction: June 2002

The existing building was designed in the early 1960s by architect F. Brugger on behalf of Kodak SA and is terraced into the slope of the site. The building is characterized by simple and plain forms and has façades made of…

Les Jardins de Prélaz, Lausanne, Lot 1

Lausanne, Switzerland

Start of construction: June 2002

The Prélaz site is one of the last large contiguous plots of land in the city of Lausanne. It is located between an urban and industrialized area on the south side and a residential area on the north side.

Sedrun tunnel, lot 360, AlpTransit, Gotthard Base Tunnel

Sedrun, Switzerland

Start of construction: December 2001
Construction volume (value of our services): 1.061 B EUR Costs converted according to average yearly exchange rates during project realization

Construction of two parallel single-track railway tunnels using blasting, and construction of a multi-function station.

Amrita Wellness, Montreux

Montreux, Switzerland

Start of construction: June 2001

Today's regular guests at major international palaces not only expect high-quality service, but also an offer that is adapted to changing lifestyles. This includes the possibility of practicing so-called "wellness" activities and…

Sur les Moulins, Denges

Lausanne, Switzerland

Start of construction: June 2001

The municipality of Denges is located between Morges and Lausanne and is part of a highly developed area in the agglomeration of the Vaud capital. Public and private services and connections in all directions are particularly…

Clinique Bois-Cerf, Lausanne

Lausanne, Switzerland

Start of construction: June 2001

The long-established Bois-Cerf clinic, located halfway between Ouchy and the Lausanne SBB railroad station, enjoys a good reputation and has long stood out among similar facilities in the Vaud capital. The Board of Directors has…

BCV Chauderon, Lausanne

Lausanne, Switzerland

Start of construction: June 2001

The impressive building, which dominates Place Chauderon in the west wing of the center of Lausanne, was built in 1908 as the headquarters of Crédit Foncier Vaudois and has been part of the bank's real estate holdings since the…

Bodio & Faido sections, Alptransit Gotthard Base Tunnel

Bodio - Faido, Switzerland

Start of construction: January 2001
Construction volume (value of our services): 1.996 B EUR Costs converted according to average yearly exchange rates during project realization

Construction of two parallel single-track railway tunnels with a Gripper TBM and of a multi-function station using blasting

Complexe Hotelier La Barcarolle, Prangins

Prangins, Switzerland

Start of construction: June 2000

The cultural and sporting facilities of the village, glorified by the presence of Prangins Castle, have been strengthened in recent years by the creation of a recreational area near the port, to which has been added the…

Immeuble Les Platanes, Prilly

Prilly, Switzerland

Start of construction: June 2000

At the request of the owner, Société Sicpa, the 8,400 m2 of undeveloped land in the urbanization zone of the municipality of Prilly was subjected to a neighbourhood plan study.

Hochhaus-Ensemble Quadro

Zürich, Switzerland

Start of construction: January 2000
Construction volume (value of our services): 345 M EUR Costs converted according to average yearly exchange rates during project realization

Implenia has developed and executed an ensemble of four high-rise buildings of different heights in Zurich North.

Immeuble Figuiers B, Lausanne

Lausanne, Switzerland

Start of construction: June 1999

The northern and southern boundaries of the plot are defined by two busy axes: av. des Figuiers and av. de Rhodanie. These two roads converge and meet at the Maladière traffic circle, the south-western exit from the city of…

SUVA, Lausanne

Lausanne, Switzerland

Start of construction: June 1999

Suva, which has been based at Av. de la Gare 19 in Lausanne for 25 years, had been looking for a way to expand the space available to it for many years. Having been given the opportunity to acquire the two neighboring buildings,…

BDG, Lausanne

Lausanne, Switzerland

Start of construction: June 1999

The client, a bank that has long been based in its building on the corner of av. du Théâtre and rue Ch. Monnard in Lausanne, had extensive renovation work carried out on the 3,250 m2 gross floor area of its building from 1996…

Extension Usine Bobst, Mex

Mex, Switzerland

Start of construction: June 1999

As a renowned industrial company active in the production of machines for manufacturing cardboard packaging, the client already had a site in the triangle formed by the municipalities of Villars-Ste-Croix, Vufflens-la-Ville and…

CERN LHC, Los 1

Genf, Switzerland

Start of construction: January 1998
Construction volume (value of our services): 68,5 M EUR Costs converted according to average yearly exchange rates during project realization

Construction contract for CERN, the European Organization for Nuclear Research (Conseil Européen pour la Recherche Nucléaire). CERN is one of the largest and most renowned centers for basic research in physics in the world.…

Quartier D'habitations les Terailles, Cossonay-Ville

Cossonay-Ville, Switzerland

Start of construction: June 1997

The "Les Terrailles" settlement is located in the upper part of Cossonay, a medium-sized municipality between Lausanne and Yverdon-les-Bains in the heart of the canton of Vaud. The hamlet's current appearance is the result of a…

La Poste Center colis, Daillens

Daillens, Switzerland

Start of construction: June 1997

The rapid development of the entire economy in the 1990s prompted Swiss Post to take extensive reorganization measures, which were implemented at short notice. The aim was to adapt the company's resources to the expectations of a…

Les Vergers du Poyet, Aubonne

Lussery-Villars, Switzerland

Start of construction: June 1996

This complex of rental apartments was built thanks to the investment fund of a pension fund in Aubonne on an 8,993 m2 plot in the north-west of the old town.

Pont-Rouge

Lancy, Switzerland

The upcoming opening of CEVA will give a boost to the neighborhoods that will be revitalized by the new rail link. This is the case for the area around the Pont-Rouge station, which becomes the gateway to the city from the Lancy…

Pont-Rouge B4-B5

Lancy, Switzerland

The creation of CEVA has been the basis for a real estate revival along the route of this new rail link. The area around the Pont-Rouge station is a very good example of this, as it becomes the gateway to the city from the Lancy…

Augsterheglistrasse 27 and 29

Pratteln, Switzerland


Construction volume (value of our services): 7,8 M EUR Costs converted according to average yearly exchange rates during project realization

Renovation and restoration of a development consisting of 56 residential units and a parking garage, both built in 1970.

Motel One

Basel, Switzerland


Construction volume (value of our services): 19,3 M EUR Costs converted according to average yearly exchange rates during project realization

Complete renovation of existing building containing offices and commercial premises, and conversion into a hotel with 143 rooms.

Schorenstadt

Basel, Switzerland


Construction volume (value of our services): 9,2 M EUR Costs converted according to average yearly exchange rates during project realization

Implenia`s flagship project for the 2000-Watt Society. This 65-unit housing development meets the latest requirements of the SIA path towards energy efficiency.

Strättligen housing estate

Thun, Switzerland


Construction volume (value of our services): 23 M EUR Costs converted according to average yearly exchange rates during project realization

Renovation of a housing estate comprising eight three- to six-storey buildings with 138 rental apartments, keeping the exterior architectural appearance in line with the aesthetics of the period in which the homes were originally…

PARKSTRASSE 11, BERN

Bern, Switzerland


Construction volume (value of our services): 4,1 M EUR Costs converted according to average yearly exchange rates during project realization

Implenia was tasked with renovating the property at Parkstrasse 11 in Bern with its 40 apartments.

Avant-Poste

Lausanne, Switzerland


Construction volume (value of our services): 8,2 M EUR Costs converted according to average yearly exchange rates during project realization

Renovation of the property and the building shell, expansion and redevelopment of the ground floor, and extension of the property by construction of eight apartments.

Le Nouveau Prieuré

Chêne-Bougeries, Switzerland

Chêne-Bougeries, a pretty commune on the left bank, is experiencing, like all the agglomerations located on the outskirts of the city of Geneva, significant development. Today, between the Frontenex plateau and the Gradelle…

Quartier Coupe Gordon-Bennett

Vernier, Switzerland

A new life. After more than half a century as the site of the construction company Zschokke, which became Implenia in 2006, a 35,000 m2 site in the heart of Vernier has undergone a rapid and spectacular transformation in just a…

IAF Genève

Genève, Switzerland

Change of use in the course of studies. Launched in 2003, the project was the result of an architectural competition set up to create an extension to the WTO (International Trade Organization). The latter subsequently withdrew,…

UBS Corraterie - Confédération

Genève, Switzerland

A pilot project. In 2010, ten years after the end of the redevelopment of the urban block consisting of the building on rue de la Corraterie 5 and 7, known as the Camoletti building, adjoining the building on rue de la Cité 4 and…

Terre Bonne Park

Eysins, Switzerland

A real estate park of ten buildings. 15 minutes from Geneva International Airport, 20 minutes from Lausanne and served by the TPN (Nyon public transport), "Terre Bonne Park" has all the features likely to attract international…

Aux Armourins

Neuchâtel, Switzerland


Construction volume (value of our services): 24,5 M EUR Costs converted according to average yearly exchange rates during project realization

Refurbishment and extension of a commercial property to create a commercial building with eleven residential units

Petite-Prairie

Nyon, Switzerland

The land had been decommissioned some 15 years ago, but a farmer who owned 1.25% of the parcels concerned had managed to block the project until an agreement was finally reached. On 100,000 m2, in the north of Nyon, the new…

Résidences A26 - Ecoquartier Les Vergers

Meyrin, Switzerland

Ecoquartier. The new Ecoquartier des Vergers is the result of a competition organized by the commune of Meyrin (Geneva). It is developed on former agricultural parcels declassified in development zone 3 in 2006.

Les Résidences du Soleil

Meinier, Switzerland

Au cœur du village. Composé à l’origine de deux hameaux distincts, le village de Meinier se singularise par son noyau ancien et ses réalisations récentes (bâtiments locatifs ou villas) ayant considérablement modifié la structure…

Japan Tobacco Internationals

Genève, Switzerland

Japan Tobacco International (JTI) has been present in Geneva for half a century. Until October 2015, its thousand employees were spread over three buildings. The desire to regroup all the activities of its international…

Logitech EMEA, Morges

Ecublens, Switzerland

Since the initial studies, MCM Architecture's desire was to create a physical and emotional link between the new Logitech Center "Europe - Middle East - Africa" and the different regions of the world it represents, to bring them…

Résidence du Parc, Morges

Morges, Switzerland

The two new buildings on Rue de Lausanne are in a privileged location between Lausanne and Geneva. The new buildings are not far from the city center on the cantonal road along the lakeshore and benefit from their proximity to…

Unterfeld Süd

Baar, Switzerland


Construction volume (value of our services): 230 M EUR Costs converted according to average yearly exchange rates during project realization

Development and new construction of a mixed-use neighborhood (residential and work) in the municipality of Baar (ZG).

Migros Navigation

Genève, Switzerland

The building, located in a busy area in the Les Pâquis neighborhood, houses Migros and three other retailers. The complete renovation took place on a semi-occupied site.

The Metropolitans

Zurich, Switzerland


Construction volume (value of our services): 262 M EUR Costs converted according to average yearly exchange rates during project realization

The Metropolitans consists of two 19-floor high-rise buildings containing apartments with interesting floor plans of between 75 and over 200 square metres. The apartments in these unique high-rise buildings are also surrounded by…

ZHAW library

Winterthur, Switzerland


Construction volume (value of our services): 39,8 M EUR Costs converted according to average yearly exchange rates during project realization

Complete renovation of an existing listed industrial building (built in 1939), including installation of the ZHAW library and classrooms

Zurlindenstrasse 111

Zurich, Switzerland


Construction volume (value of our services): 10,8 M EUR Costs converted according to average yearly exchange rates during project realization

In Zürich`s central Scmiede Wiedikon district, developers renovated the former Swisscom buildings into 20 loft apartments.

Im Giessen

Dübendorf, Switzerland


Construction volume (value of our services): 272 M EUR Costs converted according to average yearly exchange rates during project realization

One of the most attractive residential areas in Dübendorf is being built in idyllic surroundings on the bank of the River Glatt. Featuring architecture that is sophisticated yet down to earth, the Im Giessen district forms an…

Allenmoosstrasse 116-120

Zurich, Switzerland


Construction volume (value of our services): 22 M EUR Costs converted according to average yearly exchange rates during project realization

Complete renovation of eight multi-occupancy homes and building extension

Brandschenkestrasse 47

Zurich, Switzerland


Construction volume (value of our services): 5,3 M EUR Costs converted according to average yearly exchange rates during project realization

Overall design and project management in order to deliver maximum value at the premises – with assistance from the acquisition stage right through to handover of the keys.

Medienpark Flurstrasse 55

Zurich, Switzerland


Construction volume (value of our services): 54,4 M EUR Costs converted according to average yearly exchange rates during project realization

Timeless office / commercial building with sophisticated architecture, detached, with newly renovated office spaces covering approx. 16,000 square metres.