Tief- und Strassenbau Projekt Pistensanierung Flughafen Zürich

We pave the way for you

Road construction








Civil engineering contacts in Switzerland

Peter Fringeli
Head Civil DE-Switzerland, Market Manager Region Central CH
+41 58 474 32 99 peter.fringeli@implenia.com Linkedin Download VCF-Card Business card
Andreas Rogenmoser
Head Civil Western Switzerland
andreas.rogenmoser@implenia.com Linkedin Download VCF-Card Business card
Walter Wolf
Marktleiter Nordwestschweiz/Bern
walter.wolf@implenia.com Linkedin Download VCF-Card Business card
Markus Bauer
Marktleiter Zürich/Ost
+41 58 474 34 43 markus.bauer2@implenia.com Linkedin Download VCF-Card Business card

Road construction reference projects

22 references Sort by:
asc desc

Fulenbach, Erweiterung

Bern, Switzerland

Start of construction: May 2023
Construction volume (value of our services): 141.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the construction of an access road on the premises of Fischer Papier AG.

Steffisburg, Gschwendareal

Steffisburg, Switzerland

Start of construction: November 2022
Construction volume (value of our services): 121.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included pavement paving as part of the environmental works of the Gschwendareal.

STEP AS25 Rüthi – Oberriet, system adjustments

Rüthi – Oberriet, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 102,715 M EUR Costs converted according to average yearly exchange rates during project realization

The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.

Stettlen, Schwandihof WL

Bern, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 307,816 M EUR Costs converted according to average yearly exchange rates during project realization

With the "Schwandihof property", Bernapark AG created a new quarter on an old farm site, which combines living, work and leisure in one place. We carried out the civil engineering work for this project. These were carried out in…

AFW Holligen Nord

Bern, Switzerland

Start of construction: May 2022
Construction volume (value of our services): 7,483 M EUR Costs converted according to average yearly exchange rates during project realization

Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.

Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude

Liestal, Switzerland

Start of construction: February 2022
Construction volume (value of our services): 41,086 M EUR Costs converted according to average yearly exchange rates during project realization

In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …

Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223

Baden, Switzerland

Start of construction: October 2021
Construction volume (value of our services): 11,803 M EUR Costs converted according to average yearly exchange rates during project realization

A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…

Gesamtsanierung Monbijoustrasse

Bern, Switzerland

Start of construction: February 2021
Construction volume (value of our services): 13,161 M EUR Costs converted according to average yearly exchange rates during project realization

The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.

Erneuerung Waldenburgerbahn Los 6.1

Waldenburg, Switzerland

Start of construction: October 2020
Construction volume (value of our services): 69,93 M EUR Costs converted according to average yearly exchange rates during project realization

The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…

Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9

Zweisimmen, Switzerland

Start of construction: April 2020
Construction volume (value of our services): 5,711 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…

Pont Neuf - Replacement Kettenbrücke Aarau

Aarau, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 22,964 M EUR Costs converted according to average yearly exchange rates during project realization

The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.

Sanierung Busplatz und Anpassungen Kantonsstrasse

Reichenbach im Kandertal, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 582.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.

SBB Vierspurausbau – Liestal

Liestal, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 112,794 M EUR Costs converted according to average yearly exchange rates during project realization

Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure. …

Umgestaltung Worbstrasse

Gümligen, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 1,42 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.

Südwestumfahrung Brugg

Brugg/Windisch/Hausen, Switzerland

Start of construction: April 2019
Construction volume (value of our services): 30,344 M EUR Costs converted according to average yearly exchange rates during project realization

The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.

Korrektion Gerbers Kurve

Reichenbach im Kandertal, Switzerland

Start of construction: October 2018
Construction volume (value of our services): 1,588 M EUR Costs converted according to average yearly exchange rates during project realization

The current road exiting the village of Reichenbach has different road widths. There are crossing problems in many places, especially when trucks or post buses are involved. Therefore, the OIK I plans to rehabilitate the section…

Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme

Zürich, Switzerland

Start of construction: September 2018
Construction volume (value of our services): 50,781 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.

N01/42, 46 UPlaNS Verzweigung ZH Ost – Effretikon

Wallisellen, Switzerland

Start of construction: February 2018
Construction volume (value of our services): 70,977 M EUR Costs converted according to average yearly exchange rates during project realization

Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.

Erneuerung Saanenmöserstrasse Priorität 3, Los 5+6+7

Saanenmöser, Switzerland

Start of construction: June 2017
Construction volume (value of our services): 9,33 M EUR Costs converted according to average yearly exchange rates during project realization

The present project comprised an approx. 1.95 km long section in the overall project of the renewal of the Saanenmöserstrasse.

Biel, Umgestaltung Jakob-Stämpfli Strasse

Biel, Switzerland

Start of construction: January 2017
Construction volume (value of our services): 1,916 M EUR Costs converted according to average yearly exchange rates during project realization

The rehabilitation of Jakob-Stämpfli-Strasse includes the construction of new sidewalks on both sides, the renewal of the entire road drainage system as well as the foundation and edge trims over a total length of 510m. …

SBB Bözbergtunnel

Strihen, Switzerland

Start of construction: May 2015
Construction volume (value of our services): 133,693 M EUR Costs converted according to average yearly exchange rates during project realization

The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project. …

Zürich-Oerlikon Bahnhofausbau Gleis 7+8

Zürich, Switzerland

Start of construction: January 2012
Construction volume (value of our services): 9,417 M EUR Costs converted according to average yearly exchange rates during project realization

The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train…