We are building on the energy of tomorrow

Power plant expansion


Complex and impressive - the power station building




Civil engineering contacts in Switzerland

Peter Fringeli
Head Civil DE-Switzerland, Market Manager Region Central CH
+41 58 474 32 99 peter.fringeli@implenia.com Linkedin Download VCF-Card Business card
Andreas Rogenmoser
Head Civil Western Switzerland
andreas.rogenmoser@implenia.com Linkedin Download VCF-Card Business card
Walter Wolf
Marktleiter Nordwestschweiz/Bern
walter.wolf@implenia.com Linkedin Download VCF-Card Business card
Markus Bauer
Marktleiter Zürich/Ost
+41 58 474 34 43 markus.bauer2@implenia.com Linkedin Download VCF-Card Business card

Reference projects for power plant expansion

2 references Sort by:
asc desc

Staumauer Spitallamm – Grimsel

Grimsel, Switzerland

Start of construction: May 2019
Construction volume (value of our services): 96,544 M EUR Costs converted according to average yearly exchange rates during project realization

The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.

Pumpspeicherkraftwerk Nant de Drance

Finhaut VS (Le Châtelard), Switzerland

Start of construction: January 2008
Construction volume (value of our services): 601,596 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of an underground pumped-storage power station.