Interlaken, Implenia Switzerland Ltd.
In Interlaken können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
ANGEBOTENE LEISTUNGEN
Contact
References
Fulenbach, Erweiterung
Bern, Switzerland
Start of construction:
May 2023
Construction volume (value of our services):
141.000 EUR
Costs converted according to average yearly exchange rates during project realization
The project included the construction of an access road on the premises of Fischer Papier AG.
Verkehrssanierung und städtebauliche Entwicklung in Laupen
Laupen, Switzerland
Start of construction:
March 2023
Construction volume (value of our services):
51,4 M EUR
Costs converted according to average yearly exchange rates during project realization
After completion of the project, the course of the Sense River will be wider and more natural. Thus, the town of Laupen, the new train station, the bicycle and hiking paths along the Sense and the settlements in the Sense area…
Steffisburg, Gschwendareal
Steffisburg, Switzerland
Start of construction:
November 2022
Construction volume (value of our services):
122.000 EUR
Costs converted according to average yearly exchange rates during project realization
The project included pavement paving as part of the environmental works of the Gschwendareal.
Secondo tubo San Gottardo - Lot 241, Main Tunnel North
Göschenen, Switzerland
Start of construction:
October 2022
Construction volume (value of our services):
449 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…
STEP AS25 Rüthi – Oberriet, system adjustments
Rüthi – Oberriet, Switzerland
Start of construction:
June 2022
Construction volume (value of our services):
102 M EUR
Costs converted according to average yearly exchange rates during project realization
The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.
AFW Holligen Nord
Bern, Switzerland
Start of construction:
May 2022
Construction volume (value of our services):
7,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.
Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude
Liestal, Switzerland
Start of construction:
February 2022
Construction volume (value of our services):
40,9 M EUR
Costs converted according to average yearly exchange rates during project realization
In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …
Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223
Baden, Switzerland
Start of construction:
October 2021
Construction volume (value of our services):
11,8 M EUR
Costs converted according to average yearly exchange rates during project realization
A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…
Neubau Grundwasserfassung Oberi Au
Uttigen, Switzerland
Start of construction:
August 2021
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…
Secondo tubo San Gottardo - Lot 243, North access tunnel
Göschenen, Switzerland
Start of construction:
April 2021
Construction volume (value of our services):
85,1 M EUR
Costs converted according to average yearly exchange rates during project realization
To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…
Gesamtsanierung Monbijoustrasse
Bern, Switzerland
Start of construction:
February 2021
Construction volume (value of our services):
13,2 M EUR
Costs converted according to average yearly exchange rates during project realization
The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.
Erneuerung Waldenburgerbahn Los 6.1
Waldenburg, Switzerland
Start of construction:
October 2020
Construction volume (value of our services):
69,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…
Neubau LNG-Anlage
Neuenegg, Switzerland
Start of construction:
September 2020
Construction volume (value of our services):
609.000 EUR
Costs converted according to average yearly exchange rates during project realization
Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.
Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9
Zweisimmen, Switzerland
Start of construction:
April 2020
Construction volume (value of our services):
5,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…
Bernapark, Erschliessung Marktplatz und Speditionsplatz
Stettlen, Switzerland
Start of construction:
March 2020
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Bernapark AG created the "Bernapark" on an old factory site, a new quarter that combines living, working and leisure in one place. We carried out the civil engineering work for this project. These took place in different parts of…
Sanierung Busplatz und Anpassungen Kantonsstrasse
Reichenbach im Kandertal, Switzerland
Start of construction:
November 2019
Construction volume (value of our services):
582.000 EUR
Costs converted according to average yearly exchange rates during project realization
The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.
Pont Neuf - Replacement Kettenbrücke Aarau
Aarau, Switzerland
Start of construction:
November 2019
Construction volume (value of our services):
23 M EUR
Costs converted according to average yearly exchange rates during project realization
The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.
Pontons von Cologny, Genf
Cologny, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
1,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…
Umgestaltung Worbstrasse
Gümligen, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
1,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.
Südwestumfahrung Brugg
Brugg/Windisch/Hausen, Switzerland
Start of construction:
April 2019
Construction volume (value of our services):
30,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.
Korrektion Gerbers Kurve
Reichenbach im Kandertal, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
1,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The current road exiting the village of Reichenbach has different road widths. There are crossing problems in many places, especially when trucks or post buses are involved. Therefore, the OIK I plans to rehabilitate the section…
Parking Kunstmuseum
Basel, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
40,8 M EUR
Costs converted according to average yearly exchange rates during project realization
In the St. Alban-Graben in Basel, a busy street with two-lane streetcar traffic, a new underground parking lot is to be built, surrounded by the Museum of Art and Antiquities, the main branches of UBS and CS in Basel and the…
Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme
Zürich, Switzerland
Start of construction:
September 2018
Construction volume (value of our services):
50,8 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.
Andockung MLK Frauenklinik, Inselspital
Bern, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
1,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.
Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS
St. Gallen, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
66,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…
Sanierung Werkleitungen und Umgestaltung Marktplatz
Lyss, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
1,9 M EUR
Costs converted according to average yearly exchange rates during project realization
In Lyss, the market square was redesigned and the works pipelines were rehabilitated.
N01/42, 46 UPlaNS Verzweigung ZH Ost – Effretikon
Wallisellen, Switzerland
Start of construction:
February 2018
Construction volume (value of our services):
71 M EUR
Costs converted according to average yearly exchange rates during project realization
Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.
Erneuerung Saanenmöserstrasse Priorität 3, Los 5+6+7
Saanenmöser, Switzerland
Start of construction:
June 2017
Construction volume (value of our services):
9,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project comprised an approx. 1.95 km long section in the overall project of the renewal of the Saanenmöserstrasse.
Biel, Umgestaltung Jakob-Stämpfli Strasse
Biel, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
1,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The rehabilitation of Jakob-Stämpfli-Strasse includes the construction of new sidewalks on both sides, the renewal of the entire road drainage system as well as the foundation and edge trims over a total length of 510m. …
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction:
October 2016
Construction volume (value of our services):
39,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of new swimming pool and sports hall on Sursee campus
Zürich-Oerlikon Bahnhofausbau Gleis 7+8
Zürich, Switzerland
Start of construction:
January 2012
Construction volume (value of our services):
9,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train…
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction:
May 2008
Construction volume (value of our services):
7,7 M EUR
Costs converted according to average yearly exchange rates during project realization
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction:
May 2008
Construction volume (value of our services):
23,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Weinbergtunnel DML SBB Zürich ATW
Zürich, Switzerland
Start of construction:
January 2007
Construction volume (value of our services):
257 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of a two-track railway tunnel with a TBM.
Address
Interlaken, Switzerland
Implenia Switzerland Ltd.
Aareckstrasse 6
3800 Interlaken