Bolzano, Implenia Construction GmbH
In Bolzano, our customers can draw on Implenia's portfolio of tunneling services. Our specialists act across sites and divisions to offer you the best solution from a single source.
Contact
References
Tunnel Ligerz, Lot 2
Ligerz, Switzerland
Start of construction:
September 2024
Construction volume (value of our services):
230 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprises the construction of the 2.1 km long twin-track tunnel in Ligerz. The total contract value is CHF 220 million, with Implenia's share amounting to around CHF 150 million.
Secondo tubo San Gottardo - Lot 241, Main Tunnel North
Göschenen, Switzerland
Start of construction:
October 2022
Construction volume (value of our services):
449 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…
STEP AS25 Rüthi – Oberriet, system adjustments
Rüthi – Oberriet, Switzerland
Start of construction:
June 2022
Construction volume (value of our services):
102 M EUR
Costs converted according to average yearly exchange rates during project realization
The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.
AFW Holligen Nord
Bern, Switzerland
Start of construction:
May 2022
Construction volume (value of our services):
7,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.
Neubau Grundwasserfassung Oberi Au
Uttigen, Switzerland
Start of construction:
August 2021
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…
Secondo tubo San Gottardo - Lot 243, North access tunnel
Göschenen, Switzerland
Start of construction:
April 2021
Construction volume (value of our services):
85,1 M EUR
Costs converted according to average yearly exchange rates during project realization
To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…
Gesamtsanierung Monbijoustrasse
Bern, Switzerland
Start of construction:
February 2021
Construction volume (value of our services):
13,2 M EUR
Costs converted according to average yearly exchange rates during project realization
The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.
Neubau LNG-Anlage
Neuenegg, Switzerland
Start of construction:
September 2020
Construction volume (value of our services):
609.000 EUR
Costs converted according to average yearly exchange rates during project realization
Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.
Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9
Zweisimmen, Switzerland
Start of construction:
April 2020
Construction volume (value of our services):
5,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…
Bernapark, Erschliessung Marktplatz und Speditionsplatz
Stettlen, Switzerland
Start of construction:
March 2020
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Bernapark AG created the "Bernapark" on an old factory site, a new quarter that combines living, working and leisure in one place. We carried out the civil engineering work for this project. These took place in different parts of…
Sanierung Busplatz und Anpassungen Kantonsstrasse
Reichenbach im Kandertal, Switzerland
Start of construction:
November 2019
Construction volume (value of our services):
582.000 EUR
Costs converted according to average yearly exchange rates during project realization
The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.
Pontons von Cologny, Genf
Cologny, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
1,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…
Umgestaltung Worbstrasse
Gümligen, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
1,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.
Korrektion Gerbers Kurve
Reichenbach im Kandertal, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
1,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The current road exiting the village of Reichenbach has different road widths. There are crossing problems in many places, especially when trucks or post buses are involved. Therefore, the OIK I plans to rehabilitate the section…
Parking Kunstmuseum
Basel, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
40,8 M EUR
Costs converted according to average yearly exchange rates during project realization
In the St. Alban-Graben in Basel, a busy street with two-lane streetcar traffic, a new underground parking lot is to be built, surrounded by the Museum of Art and Antiquities, the main branches of UBS and CS in Basel and the…
RBS Los 1.2 Postparc – Ausbau Bahnhof Bern
Bern, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
12,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Sub-project involving the expansion of Bern train station
Andockung MLK Frauenklinik, Inselspital
Bern, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
1,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.
Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS
St. Gallen, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
66,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…
Sanierung Werkleitungen und Umgestaltung Marktplatz
Lyss, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
1,9 M EUR
Costs converted according to average yearly exchange rates during project realization
In Lyss, the market square was redesigned and the works pipelines were rehabilitated.
Erneuerung Saanenmöserstrasse Priorität 3, Los 5+6+7
Saanenmöser, Switzerland
Start of construction:
June 2017
Construction volume (value of our services):
9,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project comprised an approx. 1.95 km long section in the overall project of the renewal of the Saanenmöserstrasse.
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction:
October 2016
Construction volume (value of our services):
39,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of new swimming pool and sports hall on Sursee campus
SBB Bözbergtunnel
Strihen, Switzerland
Start of construction:
May 2015
Construction volume (value of our services):
134 M EUR
Costs converted according to average yearly exchange rates during project realization
The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project. …
Funicular railway Schwyz-Stoos
Schwyz, Switzerland
Start of construction:
May 2013
Construction volume (value of our services):
22 M EUR
Costs converted according to average yearly exchange rates during project realization
The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle…
Zürich-Oerlikon Bahnhofausbau Gleis 7+8
Zürich, Switzerland
Start of construction:
January 2012
Construction volume (value of our services):
9,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train…
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction:
May 2008
Construction volume (value of our services):
7,7 M EUR
Costs converted according to average yearly exchange rates during project realization
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction:
May 2008
Construction volume (value of our services):
23,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Pumpspeicherkraftwerk Nant de Drance
Finhaut VS (Le Châtelard), Switzerland
Start of construction:
January 2008
Construction volume (value of our services):
602 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of an underground pumped-storage power station for the Nant de Drance pumped-storage power plant.
Weinbergtunnel DML SBB Zürich ATW
Zürich, Switzerland
Start of construction:
January 2007
Construction volume (value of our services):
257 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of a two-track railway tunnel with a TBM.
Métro Lausanne, M2 Lot 1700
Lausanne, Switzerland
Start of construction:
March 2004
Construction volume (value of our services):
33 M EUR
Ouchy-Epalinges metro line via the Central Station and Place de l'Europe. Total length: 6 km, 14 stops, 9 tunnels and 5 bridges.
Lötschberg Basistunnel
Niedergesteln, Switzerland
Start of construction:
October 2002
Construction volume (value of our services):
515 M EUR
Costs converted according to average yearly exchange rates during project realization
The Lötschberg base line runs from Frutigen to Raron. In the north, it includes the connection to the BLS line and the Frutigen bypass with the Engstligen tunnel, the Lötschberg base tunnel and, in the south, the Rhone crossing…
Sedrun tunnel, lot 360, AlpTransit, Gotthard Base Tunnel
Sedrun, Switzerland
Start of construction:
December 2001
Construction volume (value of our services):
1.061 B EUR
Costs converted according to average yearly exchange rates during project realization
Construction of two parallel single-track railway tunnels using blasting, and construction of a multi-function station.
Bodio & Faido sections, Alptransit Gotthard Base Tunnel
Bodio - Faido, Switzerland
Start of construction:
January 2001
Construction volume (value of our services):
1.996 B EUR
Costs converted according to average yearly exchange rates during project realization
Construction of two parallel single-track railway tunnels with a Gripper TBM and of a multi-function station using blasting
CERN LHC, Los 1
Genf, Switzerland
Start of construction:
January 1998
Construction volume (value of our services):
68,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction contract for CERN, the European Organization for Nuclear Research (Conseil Européen pour la Recherche Nucléaire). CERN is one of the largest and most renowned centers for basic research in physics in the world.…
Address
Bolzano, Italy
Implenia Construction GmbH
Via Vicenzo Lancia 8C
39100 Bolzano