Wood construction References

Timber construction references


Reference projects for timber construction

39 references Sort by:
asc desc

Rocket & Tigerli

Winterthur, Switzerland

Start of construction: September 2025

At 100 meters, "Rocket" in Winterthur is one of the tallest timber residential buildings currently in planning. The building complex comprises attractive rental apartments and hotel rooms. The three "Tigerli" buildings complete…

Leonardo Zürich

Zürich, Switzerland

Start of construction: February 2023
Construction volume (value of our services): 275.000 EUR Costs converted according to average yearly exchange rates during project realization

In the New Leonardo office building in Zurich Oerlikon, the joinery was commissioned to carry out the interior fit-out of the new catering area.

Neubau REFH Sandblatte Rain

Rain, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 2,6 M EUR Costs converted according to average yearly exchange rates during project realization

The "Sandblatte" development comprises 22 terraced single-family homes and three commercial premises.

EWZ Werkhof Herdern

Zürich, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 1 M EUR Costs converted according to average yearly exchange rates during project realization

The façade of the new Werkhof Herdern building consists of over 2,500 m² of untreated, local Douglas fir wood with special profiles, which were developed for the project in close collaboration with the architect and the…

Ersatzneubau Riedacker

Zürich, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 2,4 M EUR Costs converted according to average yearly exchange rates during project realization

For the new Riedacker replacement building, timber construction elements were mounted on a solid steel and concrete structure.

Parkhaus Forschungskampus EMPA

Düebendorf, Switzerland

Start of construction: March 2022
Construction volume (value of our services): 1,8 M EUR Costs converted according to average yearly exchange rates during project realization

A new campus is being built on the Empa-Eawag site in Dübendorf, consisting of a laboratory and a multifunctional building with a parking garage.

Ottikon Schulhausstrasse

Ottikon bei Kemptthal, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 85.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is realizing the interior fittings and custom-made products for the new construction of the Wachter multi-family house.

Überbauung Lindenweg

Zell, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 2,3 M EUR Costs converted according to average yearly exchange rates during project realization

Production and assembly of prefabricated pitched roof elements.

Green Village Route de Ferney

Genf, Switzerland

Start of construction: September 2021
Construction volume (value of our services): 389.000 EUR Costs converted according to average yearly exchange rates during project realization

The building is named after the Montreal Protocol, an international agreement signed by 24 countries in 1987 to reduce by half the number of substances that damage the ozone layer. In 2009, it became the first universally…

Neubau Mehrzweckgebäude Alterswil

Alterswil, Switzerland

Start of construction: June 2021
Construction volume (value of our services): 2,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Alterswil multi-purpose building is an important part of the Alterswil municipality's infrastructure. It is used for school lessons, sports, events and other purposes.

Zollikerberg Langwattstrasse

Zollikerberg, Switzerland

Start of construction: May 2021
Construction volume (value of our services): 99.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is carrying out the interior finishing work on the new Langwattstrasse apartment building in Zollikerberg.

Lokstadt Elefant

Winterthur, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 42,9 M EUR Costs converted according to average yearly exchange rates during project realization

The "Elefant" is a modern office building consisting of a historic part of the building and a new 7-storey timber construction. This makes it one of the largest timber office buildings that Implenia has developed and realized for…

Masterplan Forschungscampus Empa Eawag, Etappe 1

Düebendorf, Switzerland

Start of construction: April 2021

In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…

Adlikon Leebern

Adlikon, Switzerland

Start of construction: January 2021
Construction volume (value of our services): 1,7 M EUR Costs converted according to average yearly exchange rates during project realization

The Adlikon Leebern project is spread over three stages, which will be carried out one after the other. The contract is worth around 1.7 million Swiss francs.

Bremgarten Wohnüberbauung Wydeweg

Bremgarten, Switzerland

Start of construction: January 2020
Construction volume (value of our services): 1,5 M EUR Costs converted according to average yearly exchange rates during project realization

On behalf of Graubünden-based general contractor Mathis Baumanagement, approx. 5000 m2 of wooden facade will be installed in three stages on a total of 6 apartment buildings.

Kilchberg Seestrasse 160 / 162

Zürich, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 532.000 EUR Costs converted according to average yearly exchange rates during project realization

With the displacement of the old building, space was created for an apartment building with seven parties.

Kaiseraugst Bollingerhaus

Basel, Switzerland

Start of construction: September 2019
Construction volume (value of our services): 533.000 EUR Costs converted according to average yearly exchange rates during project realization

Complete excavation of the economic part. Support and securing of the roof structure to be protected. Measures to secure the facade.

KIM residential and commercial development / construction site 4.1

Winterthur, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 77 M EUR Costs converted according to average yearly exchange rates during project realization

The One Company project 'KIM' is being built in Winterthur Neuhegi near Neuhegi railway station. A total of 208 rental flats are being built with public-oriented uses on the ground floor.

Basel Kaserne Hauptbau

Basel, Switzerland

Start of construction: May 2019
Construction volume (value of our services): 1,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Kaserne Basel is a building in Basel, built in 1863. Today it is a cultural center for the independent theater, dance and performance scene as well as for concerts in the field of popular music.

Feuerthalen am Cholfirst

Laufen-Uhwiesen, Switzerland

Start of construction: January 2019
Construction volume (value of our services): 828.000 EUR Costs converted according to average yearly exchange rates during project realization

In this project Implenia Holzbau realized the facade including insulation as well as the floor gratings on the balconies.

Giessenturm

Dübendorf, Switzerland

Start of construction: January 2019
Construction volume (value of our services): 82,5 M EUR Costs converted according to average yearly exchange rates during project realization

In the northwest of Dübendorf, between the Überlandstrasse and the idyllic riverside path of the Glatt, a new urban district is being built on the former Givaudan site in five stages by 2022.

Winterthur Lokstadt Krokodil

Winterthur, Switzerland

Start of construction: May 2018
Construction volume (value of our services): 15,3 M EUR Costs converted according to average yearly exchange rates during project realization

The four-sided perimeter block development with parking garage on the 1st basement level is planned on 3 sides with 6 floors.

Winterthur Town Village

Town Village, Winterthur, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 1,9 M EUR Costs converted according to average yearly exchange rates during project realization

A multi-use, multi-faceted development with a community focus.

Pieterlen Bassbelt

Biel, Switzerland

Start of construction: November 2017
Construction volume (value of our services): 1,6 M EUR Costs converted according to average yearly exchange rates during project realization

Spring 2019 saw the completion of the new, timber-clad Bassbelt superstructure between Bassbeltweg and Solothurnerstrasse in Pieterlen.

Flughafen SwissLounge

Zürich Flughafen, Switzerland

Start of construction: November 2017
Construction volume (value of our services): 309.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau helped produce and install the new SwissLounge at the Zürich Airport with a close partnership between our wood construction and our finish carpentry teams.

Neubau Schulpavillon Steinmürli

Dietikon, Switzerland

Start of construction: May 2016
Construction volume (value of our services): 1,8 M EUR Costs converted according to average yearly exchange rates during project realization

Six classrooms and nursery rooms for a total of 110 children, provided for the start of the 2017/2018 school year.

Neubau Schulhaus Rotweg

Wädenswil, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 780.000 EUR Costs converted according to average yearly exchange rates during project realization

In parts four stories high, the project is situated atop a public parking garage.

sue & til

Winterthur, Switzerland

Start of construction: October 2015
Construction volume (value of our services): 109 M EUR Costs converted according to average yearly exchange rates during project realization

One of the largest timber construction projects in Switzerland - residential development with commercial space.

Renovation on Rheinsfelderstrasse

Eglisau, Switzerland

Start of construction: August 2015
Construction volume (value of our services): 584.000 EUR Costs converted according to average yearly exchange rates during project realization

The "Rheinsfelder Hof" is a former barn with a distinctive supporting structure and striking roof. Six apartments have been integrated into the building, each combined with contemporary elements and modern comforts. …

Villa Boveri

Baden, Switzerland

Start of construction: July 2015
Construction volume (value of our services): 287.000 EUR Costs converted according to average yearly exchange rates during project realization

Preservation work on the historic, 125 year old Villa along with the extension of the top floor staff rooms and installation of a dampening mass in the conference rooms.

INAD (Entreprise Générale)

Meyrin, Switzerland

Start of construction: June 2015

Due to the federal authorities' requirement to create a centre for asylum seekers and people who have been refused entry to Switzerland, Geneva Airport had to find a new location for the construction of a building in 2012, as the…

PPE Alezane, Vufflens-La-Ville

Vufflens-la-Ville, Switzerland

Start of construction: June 2015

Anchored in the heart of Vufflens-la-Ville, a quiet village in Grosde-Vaud just outside Lausanne, the "Alezane" residence - the proximity to a stud farm gave the project its name - comprises ten three-and-a-half to…

ETH HWW Living Science

Zürich, Switzerland

Start of construction: January 2015
Construction volume (value of our services): 2,1 M EUR Costs converted according to average yearly exchange rates during project realization

The Luzerner Pensionskasse (Lucerne Pension Fund) constructed the new HWW "livingscience" student accommodation building on the Hönggerberg campus in partnership with Losinger Marazzi AG.

Neubau Wellnesshostel Aqua Allin

Saas Fee, Switzerland

Start of construction: November 2013
Construction volume (value of our services): 981.000 EUR Costs converted according to average yearly exchange rates during project realization

Four story wood building with a ventilated wood façade.

"Neugrüen" residential complex

Mellingen, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 10,7 M EUR Costs converted according to average yearly exchange rates during project realization

Multi-story wooden structures erected in prefabricated elements with a wood façade. The project meets Minergie P ECO standards.

Zellweger Park

Uster, Switzerland

Start of construction: August 2012
Construction volume (value of our services): 1,2 M EUR Costs converted according to average yearly exchange rates during project realization

5000 m² of ventilated façade with wood cladding

Elephant House, Zürich Zoo

Zurich, Switzerland

Start of construction: April 2012
Construction volume (value of our services): 9,9 M EUR Costs converted according to average yearly exchange rates during project realization

Our Elephant House covers over 5,000 square meters of the new 10,000 square meter Elephant paddock at the Zürich Zoo.

Schorenstadt

Basel, Switzerland


Construction volume (value of our services): 9,2 M EUR Costs converted according to average yearly exchange rates during project realization

Implenia`s flagship project for the 2000-Watt Society. This 65-unit housing development meets the latest requirements of the SIA path towards energy efficiency.

Zurlindenstrasse 111

Zurich, Switzerland


Construction volume (value of our services): 10,8 M EUR Costs converted according to average yearly exchange rates during project realization

In Zürich`s central Scmiede Wiedikon district, developers renovated the former Swisscom buildings into 20 loft apartments.