Reference projects for new constructions
New buildings references
Implenia Building contruction has already completed over 250 projects. The success of a new build typically involves comprehensive advice, precise planning and careful execution right through to the successful handover of the keys.
New construction reference projects
Laborprovisorium Functional Genomics Center Zürich
Zürich, Switzerland
Start of construction:
July 2021
Construction volume (value of our services):
16,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…
Masterplan Forschungscampus Empa Eawag, Etappe 1
Düebendorf, Switzerland
Start of construction: April 2021
In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…
Lokstadt Elefant
Winterthur, Switzerland
Start of construction:
April 2021
Construction volume (value of our services):
42,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The "Elefant" is a modern office building consisting of a historic part of the building and a new 7-storey timber construction. This makes it one of the largest timber office buildings that Implenia has developed and realized for…
MFH Lilienstrasse
Allschwil, Switzerland
Start of construction:
July 2020
Construction volume (value of our services):
6,5 M EUR
Costs converted according to average yearly exchange rates during project realization
The "Lilienstrasse" project consists of a four-storey building and a car park.
Worblaufen Hammerwerk residential development
Worblaufen, Switzerland
Start of construction:
May 2020
Construction volume (value of our services):
29,9 M EUR
Costs converted according to average yearly exchange rates during project realization
New residential development on the banks of the River Aare on the former Hammerwerke site in the municipality of Ittigen / Worblaufen (BE).
Am Giessenplatz M1.2.1
Dübendorf, Switzerland
Start of construction:
February 2020
Construction volume (value of our services):
20,5 M EUR
Costs converted according to average yearly exchange rates during project realization
A new, attractive residential quarter is being built on the banks of the Glatt in Dübendorf. Once all four stages have been completed, the quarter will have a total of around 385 flats, 60 care rooms and a new city park. …
Les Jardins de Rozon
Croix-de-Rozon, Australia
Start of construction: January 2020
Marking the border with France, the municipality of Bardonnex includes several localities with residential vocation such as La Croix-de-Rozon
Primary school building Martin Haffter
Weinfelden, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
24 M EUR
Costs converted according to average yearly exchange rates during project realization
The Martin Haffter primary school building was constructed using timber elements. The new building is Minergie-certified.
Vier Wohnhäuser Langenhagweg
Allschwil, Switzerland
Start of construction:
October 2019
Construction volume (value of our services):
19,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The Langenhagweg project consists of 4 residential buildings, each with a basement and base floor, a ground floor, two upper floors and an attic floor.
KIM residential and commercial development / construction site 4.1
Winterthur, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
77 M EUR
Costs converted according to average yearly exchange rates during project realization
The One Company project 'KIM' is being built in Winterthur Neuhegi near Neuhegi railway station. A total of 208 rental flats are being built with public-oriented uses on the ground floor.
Herrenschwanden New school building
Herrenschwanden, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
7,6 M EUR
Costs converted according to average yearly exchange rates during project realization
School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)
Giessenturm
Dübendorf, Switzerland
Start of construction:
January 2019
Construction volume (value of our services):
82,5 M EUR
Costs converted according to average yearly exchange rates during project realization
In the northwest of Dübendorf, between the Überlandstrasse and the idyllic riverside path of the Glatt, a new urban district is being built on the former Givaudan site in five stages by 2022.
Quartier de l'Etang - Îlot E
Vernier, Switzerland
Start of construction: December 2018
The Quartier de l'Etang, an exemplary conversion of an industrial site two kilometers from the historic center of Geneva, has become a strategic urban piece. Located in the commune of Vernier, it extends over a 9.5 hectare…
New BSS building of the Department of Biosystems, Basel
Basel, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
145 M EUR
Costs converted according to average yearly exchange rates during project realization
The new building for the Department D-BSSE (Department of Biosystems Science and Engineering), founded by ETH Zurich in 2007, will provide experimental biologists and bioinformaticians with the best conditions to generate new…
Wohnhochhaus Baslerstrasse
Zürich, Switzerland
Start of construction:
September 2018
Construction volume (value of our services):
58,9 M EUR
Costs converted according to average yearly exchange rates during project realization
The high-rise building with its plinth blends in perfectly with Zurich's up-and-coming outer district and sets a striking urban accent.
Deisswil b. Stettlen Bernapark
Bernapark, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
61,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.
Neubau Halle 7, Militärflugplatz ZLE
Emmen, Switzerland
Start of construction:
July 2018
Construction volume (value of our services):
26,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Hangar building with a total of 7 aircraft boxes in solid construction 187mx27m. On the north side is a three-story annex for offices.
Cilag Microbio Lab B45
Schaffhausen, Switzerland
Start of construction:
June 2018
Construction volume (value of our services):
12,4 M EUR
Costs converted according to average yearly exchange rates during project realization
New building Microbio laboratory with technical rooms in Schaffhausen
Schmitten Residential development Bodenmattpark
Schmitten, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,6 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential development in the village centre of Schmitten (FR). The 70 flats of owner-occupied standard are divided into 5 buildings, each with 5 storeys. The surroundings would be designed according to the…
New residential and commercial development in the picture
Zizers, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Commercial: Coop Cooperative with 650 m2 of retail space 33 rental apartments between 2 ½ and 5 ½-rooms.
Neubau Leister AG
Kägiswil, Switzerland
Start of construction:
January 2018
Construction volume (value of our services):
17,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Addition of a new production to the existing building.
WÜB Bernhardswies, Bernhardswiesstr. 28-34, Hechtackerstr. 12-12g, 14-14b
St. Gallen, Switzerland
Start of construction:
August 2017
Construction volume (value of our services):
36,5 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of four apartment buildings with 147 rental apartments and commercial premises as well as a kindergarten.
Neubau Verwaltungszentrum Sinergia
Chur, Switzerland
Start of construction:
March 2017
Construction volume (value of our services):
58,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Cantonal administration building with open space office structure. Consolidation of 14 offices.
Pressy 17
Vandœuvres, Switzerland
Start of construction: March 2017
In a neighborhood of beautiful residences in the commune of Vandoeuvres, on a 15,928 square meter plot, a complex of four volumes has replaced the 1960s villa. In the heart of this haven of peace bordering the Geneva Golf Club,…
Edmond Vaucher
Châtelaine, Switzerland
Start of construction: February 2017
oie perpendicular to the avenue de Châtelaine and the carrefour du Bouchet, the avenue Edmond-Vaucher traces a long straight line in a disparate landscape where the allotment gardens and the public park impose their green lung…
«RIVUS» WÜB Rehetobelstrasse 64 / 66
St. Gallen, Switzerland
Start of construction:
February 2017
Construction volume (value of our services):
18,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of two apartment buildings with 55 apartments and conversion of the old workshop.
Bassbelt residential complex
Pieterlen, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
20,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…
Les Terrasses Volantes
Saint-Blaise, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
16,9 M EUR
Costs converted according to average yearly exchange rates during project realization
Nestled between vineyards, water and sky, Terrasses Volantes enjoys a privileged location in the communes of Hauterive and Saint-Blaise. Taking advantage of the sloping terrain to enhance the exceptional panorama, the project has…
Îlot Vert
La Chaux-de-Fonds, Switzerland
Start of construction:
November 2016
Construction volume (value of our services):
37,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Îlot Vert is a multifunctional building in La Chaux-de-Fonds. The building offers a new, contemporary image to a complex that has been disused for several years. The project is located in the checkerboard zone, just above…
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction:
October 2016
Construction volume (value of our services):
39,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of new swimming pool and sports hall on Sursee campus
Retirement living Silber
Schaffhausen, Switzerland
Start of construction:
September 2016
Construction volume (value of our services):
102 M EUR
Costs converted according to average yearly exchange rates during project realization
In Schaffhausen, a retirement housing project was built to the Minergie standard.
Security Centre
Weinfelden, Switzerland
Start of construction:
May 2016
Construction volume (value of our services):
7,1 M EUR
Costs converted according to average yearly exchange rates during project realization
New security center for Weinfelden
GIBZ Bildungszentrum Trakt 5
Zug, Switzerland
Start of construction:
April 2016
Construction volume (value of our services):
11,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Educational center with 20 classrooms, 10 group rooms and 1 seminar room.
Andreasturm
Zürich, Switzerland
Start of construction:
April 2016
Construction volume (value of our services):
89,5 M EUR
Costs converted according to average yearly exchange rates during project realization
SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…
Neubau Hallenbad Oberes Rheintal in Altstätten
Altstätten, Switzerland
Start of construction:
January 2016
Construction volume (value of our services):
17,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Demolition work with pollutant cleanup of existing HB new indoor swimming pool.
Fährenpark
St. Margrethen, Switzerland
Start of construction:
January 2016
Construction volume (value of our services):
13,6 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of four apartment buildings with 36 apartments.
sue & til
Winterthur, Switzerland
Start of construction:
October 2015
Construction volume (value of our services):
109 M EUR
Costs converted according to average yearly exchange rates during project realization
One of the largest timber construction projects in Switzerland - residential development with commercial space.
Biel Residential development Jardin du Paradis
Biel, Switzerland
Start of construction:
October 2015
Construction volume (value of our services):
78,3 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.
Neubau Alterspflegeheim Humanitas
Riehen, Switzerland
Start of construction:
September 2015
Construction volume (value of our services):
25,7 M EUR
Costs converted according to average yearly exchange rates during project realization
A new building is planned for a nursing home for the elderly with a garden in Riehen, Niederholz. The building has a basement, a ground floor and three upper floors.
Primary school centre «Elisabetha Hess»
Weinfelden, Switzerland
Start of construction:
July 2015
Construction volume (value of our services):
16,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The primary school center "Elisabetha Hess" is the first school center in the canton of Thurgau with Minergie-A certification.
Neubau Wohnheime Rathausen SSBL
Emmen, Switzerland
Start of construction:
March 2015
Construction volume (value of our services):
19,9 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction 3 dormitories with 90 resident rooms.
Neubau Wohnen im Knonau
Knonau, Switzerland
Start of construction:
March 2015
Construction volume (value of our services):
15,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Residential development with 3 MFH with 5 apartments each and 5 EFH.
Neubau Felix Platter Spital, Basel
Basel, Switzerland
Start of construction:
January 2015
Construction volume (value of our services):
201 M EUR
Costs converted according to average yearly exchange rates during project realization
A completely new building will be constructed at the current location on Burgfelderstrasse for around CHF 200 million. The current situation with the hospital built in 1967 no longer meets the structural and operational…
Lyss Portalyssa residential development
Lyss, Switzerland
Start of construction:
November 2014
Construction volume (value of our services):
47,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New residential development on a former commercial site in the immediate vicinity of Lyss railway station. The 143 flats are divided into 5 structures.
Neubau Wohnüberbauung Feldbreite Baufeld D2
Emmen, Switzerland
Start of construction:
September 2014
Construction volume (value of our services):
35,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Residential development with 151 apartments and commercial space on the ground floor, underground parking with 131 parking spaces.
Hinterkappelen Capella residential development
Hinterkappelen Wohlen, Switzerland
Start of construction:
September 2014
Construction volume (value of our services):
22,8 M EUR
Costs converted according to average yearly exchange rates during project realization
74 rental flats in Minergie standard
Schoren Hochhäuser
Basel, Switzerland
Start of construction:
July 2014
Construction volume (value of our services):
40,2 M EUR
Costs converted according to average yearly exchange rates during project realization
The construction project comprises the new construction of two high-rise buildings with 18 and 16 upper floors respectively. Both buildings have two basement floors. The existing car park was structurally repaired and adapted to…
Residential and commercial development Witenzelg
Romanshorn, Switzerland
Start of construction:
June 2014
Construction volume (value of our services):
44 M EUR
Costs converted according to average yearly exchange rates during project realization
The Witenzelg residential and commercial development is a housing estate with 10 apartment buildings. It was realized according to the Minergie standard.
Modulis Business Park
Versoix, Switzerland
Start of construction: May 2014
Birth of a new business center 10 km from Geneva. Versoix can be reached by the "Route Suisse", by two SBB stations or by the CGN boats from the Swiss and French coastal towns. Geneva's public transport system also serves 11 bus…
Crèche Origami
Geneva, Switzerland
Start of construction: February 2014
Geneva displays its international dimension first and foremost on its right bank. Permanent missions, headquarters of organizations or large companies, this part of the city has not ceased to develop for nearly a hundred years.…
Migros Ticino
Lugano, Switzerland
Start of construction:
January 2014
Construction volume (value of our services):
22,2 M EUR
Costs converted according to average yearly exchange rates during project realization
Conversion and renovation; facade renovation
Construction Sunnewiese
Islikon, Switzerland
Start of construction:
July 2013
Construction volume (value of our services):
23,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The Sunnewiese development is a new construction project with seven buildings.
Renergia waste incineration plant
Renergia Zentralschweiz, Switzerland
Start of construction:
August 2012
Construction volume (value of our services):
6 M EUR
Costs converted according to average yearly exchange rates during project realization
Renergia in Perlen (LU) is a modern and environmentally friendly waste incineration plant.
Sportpark Bergholz
Wil, Switzerland
Start of construction:
August 2012
Construction volume (value of our services):
46,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Overall renovation of the sports and recreational facility.
Herisau Kasernenareal
Herisau, Switzerland
Start of construction:
May 2012
Construction volume (value of our services):
25,3 M EUR
Costs converted according to average yearly exchange rates during project realization
In June 2012, the foundation stone was laid in Herisau for the planned adaptations to the barracks buildings. The intact load-bearing structure and the existing generous room layout in the multi-storey old building made of…
Hochhaus Park Tower
Zug, Switzerland
Start of construction:
January 2012
Construction volume (value of our services):
79,1 M EUR
Costs converted according to average yearly exchange rates during project realization
Park Tower high-rise building
OMC Extra Muros
Romont, Switzerland
Start of construction: January 2011
Respond to growth and consolidate all activities on a single site. The WTO's current headquarters is located in Geneva and houses approximately 900 staff. It houses the various departments of the Secretariat, as well as…
LCA Supercomputing Center
Lugano, Switzerland
Start of construction:
July 2010
Construction volume (value of our services):
35,5 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction LCA Supercomputing Center Turnkey construction Construction and building services work Office building with four floors
Bon-Park
Lancy, Switzerland
Start of construction: August 2009
A place to (re)invent. Eighteen buildings, tens of thousands of square meters of housing, three thousand five hundred inhabitants planned, commerce and a large public park: the new district of La Chapelle is a major urban…
O2
Onex, Switzerland
Start of construction: April 2006
An extension in continuity. The "O2" building extension is located at the junction of the communes of Onex and Lancy, along the Avenue des Grandes-Communes. It is the second stage of a project for an activity building established…
Les Jardins d'Onex
Onex, Switzerland
Start of construction: March 2003
Former filling area. Located on the edge of the new city of Onex, the building benefits from a privileged situation with a magnificent view of the Jura and the cliffs of the Rhone. All amenities are nearby, shops and public…
Migros Navigation
Genève, Switzerland
The building, located in a busy area in the Les Pâquis neighborhood, houses Migros and three other retailers. The complete renovation took place on a semi-occupied site.
Pont-Rouge B4-B5
Lancy, Switzerland
The creation of CEVA has been the basis for a real estate revival along the route of this new rail link. The area around the Pont-Rouge station is a very good example of this, as it becomes the gateway to the city from the Lancy…
Japan Tobacco International
Genève, Switzerland
apan Tobacco International (JTI) has been present in Geneva for half a century. Until October 2015, its thousand employees were spread over three buildings. The desire to regroup all the activities of its international…
INAD
Carouge, Australia
Discretion. In compliance with the federal authorities' request to host a center for asylum seekers and persons in a situation of non-admission on Swiss soil, Geneva Airport had to find a location in 2012 to allow for the…
Petite-Prairie
Nyon, Switzerland
The land had been decommissioned some 15 years ago, but a farmer who owned 1.25% of the parcels concerned had managed to block the project until an agreement was finally reached. On 100,000 m2, in the north of Nyon, the new…
Résidence Les Hauts de Drize
Plan-les-Ouates, Australia
A green setting at the gates of Geneva. Close to the Salève, five minutes from the center of Carouge, in the Geneva commune of Plan-les-Ouates, the plot is located on the Route d'Annecy, in a privileged setting due to the…
Rhône-Monnaie
Genève, Australia
Because it is the nerve center of the city, the Place de Bel-Air offers a special status to the buildings located there. Aware of this fact, Credit Suisse has occupied the area since 1906. Initially located in two arcades, the…
Résidences A26 - Ecoquartier Les Vergers
Meyrin, Switzerland
Ecoquartier. The new Ecoquartier des Vergers is the result of a competition organized by the commune of Meyrin (Geneva). It is developed on former agricultural parcels declassified in development zone 3 in 2006.
Petite Prairie 2
Nyon, Australia
The concept aims at creating an island oriented towards Lake Geneva on the one hand and towards the Jura mountain range on the other hand, with a morphology allowing to open up numerous perspectives, to limit the number of facing…
Centror-Ritschard
Meyrin, Australia
An ideal location. Too cramped for space on its former production site, Centror, a subsidiary of the watch manufacturer Audemars-Piguet, was forced to look for a new location for its activities. The land on which the company has…
Les Résidences du Soleil
Meinier, Australia
Au cœur du village. Composé à l’origine de deux hameaux distincts, le village de Meinier se singularise par son noyau ancien et ses réalisations récentes (bâtiments locatifs ou villas) ayant considérablement modifié la structure…
Le Nouveau Prieuré
Chêne-Bougeries, Switzerland
Chêne-Bougeries, a pretty commune on the left bank, is experiencing, like all the agglomerations located on the outskirts of the city of Geneva, significant development. Today, between the Frontenex plateau and the Gradelle…
Quartier Coupe Gordon-Bennett
Vernier, Switzerland
A new life. After more than half a century as the site of the construction company Zschokke, which became Implenia in 2006, a 35,000 m2 site in the heart of Vernier has undergone a rapid and spectacular transformation in just a…
IAF Genève
Genève, Switzerland
Change of use in the course of studies. Launched in 2003, the project was the result of an architectural competition set up to create an extension to the WTO (International Trade Organization). The latter subsequently withdrew,…
UBS Corraterie - Confédération
Genève, Switzerland
A pilot project. In 2010, ten years after the end of the redevelopment of the urban block consisting of the building on rue de la Corraterie 5 and 7, known as the Camoletti building, adjoining the building on rue de la Cité 4 and…
Terre Bonne Park
Eysins, Switzerland
A real estate park of ten buildings. 15 minutes from Geneva International Airport, 20 minutes from Lausanne and served by the TPN (Nyon public transport), "Terre Bonne Park" has all the features likely to attract international…