Watch the video

Cantonal Hospital Aarau

Planning is carried out using the BIM method in 19 disciplines and with around 200 sub-models that are integrated into an overall model. All planners work together interactively in the coordinated model.

Bundled expertise for complex healthcare and laboratory buildings

Healthcare and laboratory construction


YOUR HEALTHCARE AND LABORATORY CONSTRUCTION IN STRONG HANDS

Healthcare and laboratory buildings must meet particularly high requirements.



HOW WE SUPPORT YOU WITH HEALTHCARE AND LABORATORY BUILDINGS

Partnership and user-oriented cooperation

Expertise

Cooperation

Data and digitization


THESE ARE THE SERVICES WE OFFER IN HEALTHCARE AND LABORATORY CONSTRUCTION

Holistic design and execution of healthcare and laboratory buildings


Health and laboratory construction contacts

We look forward to talking with you about healthcare and laboratory construction.

Jochen Dietmeier
Leiter Gesundheits- und Laborbau
Division Buildings
jochen.dietmeier@implenia.com Linkedin Download VCF-Card Business card
Stefan Winkler, MRICS
Head of Real Estate Consulting and Clients / Head of Region Central
+41 58 474 34 62 stefan.winkler@implenia.com Linkedin Download VCF-Card Business card
Marc Brülhart
Head Northwest Region
marc.bruelhart@implenia.com Linkedin Download VCF-Card Business card

Our healthcare and laboratory construction references

8 references Sort by:
asc desc

Laborneubau Departement Biomedizin DBM Universität Basel

Basel, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 260,898 M EUR Costs converted according to average yearly exchange rates during project realization

The Department of Biomedicine (DBM) of the University of Basel combines the experimental laboratory research of the medical faculty in the latest new building of the Life Sciences Campus on the Schällemätteli site in Basel. This…

Luzerner Kantonsspital – Neubau Kinderspital/Frauenklinik

Luzern, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 41,908 M EUR Costs converted according to average yearly exchange rates during project realization

The new building will enable future-oriented further development of pediatric medicine (pediatrics and pediatric surgery) as well as obstetrics and gynecology at the highest level and is an important step for future health care…

Laborprovisorium Functional Genomics Center Zürich

Zürich, Switzerland

Start of construction: July 2021
Construction volume (value of our services): 16,332 M EUR Costs converted according to average yearly exchange rates during project realization

The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…

Masterplan Forschungscampus Empa Eawag, Etappe 1

Düebendorf, Switzerland

Start of construction: April 2021

In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…

New Aarau Cantonal Hospital "Dreiklang" (KSA) building

Aarau, Switzerland

Start of construction: January 2020

The cantonal hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…

Neubau Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: July 2019
Construction volume (value of our services): 43,77 M EUR Costs converted according to average yearly exchange rates during project realization

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

New BSS building of the Department of Biosystems, Basel

Basel, Switzerland

Start of construction: October 2018
Construction volume (value of our services): 145,023 M EUR Costs converted according to average yearly exchange rates during project realization

The new building for the Department D-BSSE (Department of Biosystems Science and Engineering), founded by ETH Zurich in 2007, will provide experimental biologists and bioinformaticians with the best conditions to generate new…

Neubau Felix Platter Spital, Basel

Basel, Switzerland

Start of construction: January 2015
Construction volume (value of our services): 200,804 M EUR Costs converted according to average yearly exchange rates during project realization

A completely new building will be constructed at the current location on Burgfelderstrasse for around CHF 200 million. The current situation with the hospital built in 1967 no longer meets the structural and operational…


Consulting

Have we aroused your interest in our laboratory and healthcare construction services? Have any questions arisen?

Contact form laboratory and health construction

* mandatory fields