Fulenbach, Erweiterung

Bern, Switzerland

Start of construction: May 2023
Construction volume (value of our services): 140.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the construction of an access road on the premises of Fischer Papier AG.

Verkehrssanierung und städtebauliche Entwicklung in Laupen

Laupen, Switzerland

Start of construction: March 2023
Construction volume (value of our services): 50,529 M EUR Costs converted according to average yearly exchange rates during project realization

After completion of the project, the course of the Sense River will be wider and more natural. Thus, the town of Laupen, the new train station, the bicycle and hiking paths along the Sense and the settlements in the Sense area…

Steffisburg, Gschwendareal

Steffisburg, Switzerland

Start of construction: November 2022
Construction volume (value of our services): 121.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included pavement paving as part of the environmental works of the Gschwendareal.

Laborneubau Departement Biomedizin DBM Universität Basel

Basel, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 254,764 M EUR Costs converted according to average yearly exchange rates during project realization

The Department of Biomedicine (DBM) of the University of Basel combines the experimental laboratory research of the medical faculty in the latest new building of the Life Sciences Campus on the Schällemätteli site in Basel. This…

Secondo tubo San Gottardo - Lot 241, Main Tunnel North

Göschenen, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 441,9 M EUR Costs converted according to average yearly exchange rates during project realization

The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…

Luzerner Kantonsspital – Neubau Kinderspital/Frauenklinik

Luzern, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 41,37 M EUR Costs converted according to average yearly exchange rates during project realization

The new building will enable future-oriented further development of pediatric medicine (pediatrics and pediatric surgery) as well as obstetrics and gynecology at the highest level and is an important step for future health care…

COE Green Village, Bâtiment Kyoto

Le Grand-Saconnex, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 60,838 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of an administrative building in the new Green Village district on the site of the Ecumenical Center of Churches.

Stettlen, Schwandihof WL

Bern, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 307,816 M EUR Costs converted according to average yearly exchange rates during project realization

With the "Schwandihof property", Bernapark AG created a new quarter on an old farm site, which combines living, work and leisure in one place. We carried out the civil engineering work for this project. These were carried out in…

STEP AS25 Rüthi – Oberriet, system adjustments

Rüthi – Oberriet, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 101,397 M EUR Costs converted according to average yearly exchange rates during project realization

The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.

AFW Holligen Nord

Bern, Switzerland

Start of construction: May 2022
Construction volume (value of our services): 7,401 M EUR Costs converted according to average yearly exchange rates during project realization

Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.

Ersatzneubau Tokeh

Zürich, Switzerland

Start of construction: April 2022
Construction volume (value of our services): 7,753 M EUR Costs converted according to average yearly exchange rates during project realization

For the replacement TOKEH building, a new morphological building type was generated that combines the two row buildings (longitudinal and transverse to the slope) prevalent in the neighborhood into a cruciform floor plan. …

Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude

Liestal, Switzerland

Start of construction: February 2022
Construction volume (value of our services): 40,558 M EUR Costs converted according to average yearly exchange rates during project realization

In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …

Ottikon Schulhausstrasse

Ottikon bei Kemptthal, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 84.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is realizing the interior fittings and custom-made products for the new construction of the Wachter multi-family house.

Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223

Baden, Switzerland

Start of construction: October 2021
Construction volume (value of our services): 11,777 M EUR Costs converted according to average yearly exchange rates during project realization

A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…

Green Village Route de Ferney

Genf, Switzerland

Start of construction: September 2021
Construction volume (value of our services): 388.000 EUR Costs converted according to average yearly exchange rates during project realization

The building is named after the Montreal Protocol, an international agreement signed by 24 countries in 1987 to reduce by half the number of substances that damage the ozone layer. In 2009, it became the first universally…

Neubau Grundwasserfassung Oberi Au

Uttigen, Switzerland

Start of construction: August 2021
Construction volume (value of our services): 2,649 M EUR Costs converted according to average yearly exchange rates during project realization

Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…

Laborprovisorium Functional Genomics Center Zürich

Zürich, Switzerland

Start of construction: July 2021
Construction volume (value of our services): 16,332 M EUR Costs converted according to average yearly exchange rates during project realization

The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…

Zollikerberg Langwattstrasse

Zollikerberg, Switzerland

Start of construction: May 2021
Construction volume (value of our services): 98.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is carrying out the interior finishing work on the new Langwattstrasse apartment building in Zollikerberg.

Secondo tubo San Gottardo - Lot 243, North access tunnel

Göschenen, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 84,893 M EUR Costs converted according to average yearly exchange rates during project realization

To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…

Masterplan Forschungscampus Empa Eawag, Etappe 1

Düebendorf, Switzerland

Start of construction: April 2021

In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage, and the design of the outdoor space are being designed by SAM…

Gesamtsanierung Monbijoustrasse

Bern, Switzerland

Start of construction: February 2021
Construction volume (value of our services): 13,161 M EUR Costs converted according to average yearly exchange rates during project realization

The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.

Adlikon Leebern

Adlikon, Switzerland

Start of construction: January 2021
Construction volume (value of our services): 1,666 M EUR Costs converted according to average yearly exchange rates during project realization

The Adlikon Leebern project is spread over three stages, which will be carried out one after the other. The contract is worth around 1.7 million Swiss francs.

Erneuerung Waldenburgerbahn Los 6.1

Waldenburg, Switzerland

Start of construction: October 2020
Construction volume (value of our services): 69,812 M EUR Costs converted according to average yearly exchange rates during project realization

The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…

Neubau LNG-Anlage

Neuenegg, Switzerland

Start of construction: September 2020
Construction volume (value of our services): 608.000 EUR Costs converted according to average yearly exchange rates during project realization

Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.

MFH Lilienstrasse

Allschwil, Switzerland

Start of construction: July 2020
Construction volume (value of our services): 6,508 M EUR Costs converted according to average yearly exchange rates during project realization

The "Lilienstrasse" project consists of a four-storey building and a car park.

Worblaufen Hammerwerk residential development

Worblaufen, Switzerland

Start of construction: May 2020
Construction volume (value of our services): 29,888 M EUR Costs converted according to average yearly exchange rates during project realization

New residential development on the banks of the River Aare on the former Hammerwerke site in the municipality of Ittigen / Worblaufen (BE).

Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9

Zweisimmen, Switzerland

Start of construction: April 2020
Construction volume (value of our services): 5,711 M EUR Costs converted according to average yearly exchange rates during project realization

The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…

Bernapark, Erschliessung Marktplatz und Speditionsplatz

Stettlen, Switzerland

Start of construction: March 2020
Construction volume (value of our services): 2,665 M EUR Costs converted according to average yearly exchange rates during project realization

Bernapark AG created the "Bernapark" on an old factory site, a new quarter that combines living, working and leisure in one place. We carried out the civil engineering work for this project. These took place in different parts of…

Swiss Life Brannhof

Zürich, Switzerland

Start of construction: March 2020
Construction volume (value of our services): 96,962 M EUR Costs converted according to average yearly exchange rates during project realization

With the redevelopment of Swiss Life Brannhof in Zurich's Bahnhofstrasse comes a new and attractive mixed-use concept. Thus, the historic pioneering spirit on the renowned promenade and shopping street will be given a new lease…

Innere Erneuerung, Hummelbergstrasse 8 - 16

Rapperswil-Jona, Switzerland

Start of construction: February 2020
Construction volume (value of our services): 4,369 M EUR Costs converted according to average yearly exchange rates during project realization

The existing properties are located in an attractive residential area in Rapperswil-Jona and were renovated a few years ago. Although the occupancy rate remains very good, the owner has been intending to carry out a renovation…

Am Giessenplatz M1.2.1

Dübendorf, Switzerland

Start of construction: February 2020
Construction volume (value of our services): 20,453 M EUR Costs converted according to average yearly exchange rates during project realization

A new, attractive residential quarter is being built on the banks of the Glatt in Dübendorf. Once all four stages have been completed, the quarter will have a total of around 385 flats, 60 care rooms and a new city park. …

Bremgarten Wohnüberbauung Wydeweg

Bremgarten, Switzerland

Start of construction: January 2020
Construction volume (value of our services): 1,475 M EUR Costs converted according to average yearly exchange rates during project realization

On behalf of Graubünden-based general contractor Mathis Baumanagement, approx. 5000 m2 of wooden facade will be installed in three stages on a total of 6 apartment buildings.

New building of the Cantonal Hospital Aarau “Dreiklang”

Aarau, Switzerland

Start of construction: January 2020

The Cantonal Hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…

SH4 Datacenter

Rafz, Switzerland

Start of construction: December 2019
Construction volume (value of our services): 19,708 M EUR Costs converted according to average yearly exchange rates during project realization

Construction of a data center with main building, office complex, cooling systems, generator building, 2 power conversion buildings.

Sanierung Busplatz und Anpassungen Kantonsstrasse

Reichenbach im Kandertal, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 582.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.

Pont Neuf - Replacement Kettenbrücke Aarau

Aarau, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 22,932 M EUR Costs converted according to average yearly exchange rates during project realization

The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.

Kilchberg Seestrasse 160 / 162

Zürich, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 531.000 EUR Costs converted according to average yearly exchange rates during project realization

With the displacement of the old building, space was created for an apartment building with seven parties.

Pontons von Cologny, Genf

Cologny, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 1,65 M EUR Costs converted according to average yearly exchange rates during project realization

The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…

Primary school building Martin Haffter

Weinfelden, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 23,953 M EUR Costs converted according to average yearly exchange rates during project realization

The Martin Haffter primary school building was constructed using timber elements. The new building is Minergie-certified.

Vier Wohnhäuser Langenhagweg

Allschwil, Switzerland

Start of construction: October 2019
Construction volume (value of our services): 19,708 M EUR Costs converted according to average yearly exchange rates during project realization

The Langenhagweg project consists of 4 residential buildings, each with a basement and base floor, a ground floor, two upper floors and an attic floor.