25 references Sort by:
asc desc

Verkehrssanierung und städtebauliche Entwicklung in Laupen

Laupen, Switzerland

Start of construction: March 2023
Construction volume (value of our services): 49,4 M CHF

After completion of the project, the course of the Sense River will be wider and more natural. Thus, the town of Laupen, the new train station, the bicycle and hiking paths along the Sense and the settlements in the Sense area…

Laborneubau Departement Biomedizin DBM Universität Basel

Basel, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 250 M CHF

The Department of Biomedicine (DBM) of the University of Basel combines the experimental laboratory research of the medical faculty in the latest new building of the Life Sciences Campus on the Schällemätteli site in Basel. This…

Secondo tubo San Gottardo - Lot 241, Main Tunnel North

Göschenen, Switzerland

Start of construction: October 2022
Construction volume (value of our services): 433,434 M CHF

The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…

Luzerner Kantonsspital – Neubau Kinderspital/Frauenklinik

Luzern, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 40,8 M CHF

The new building will enable future-oriented further development of pediatric medicine (pediatrics and pediatric surgery) as well as obstetrics and gynecology at the highest level and is an important step for future health care…

STEP AS25 Rüthi – Oberriet, system adjustments

Rüthi – Oberriet, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 100 M CHF

The project "STEP AS25, Rüthi SG- Oberriet, plant modifications" essentially comprises a 2,100 m long double track extension for the SBB.

COE Green Village, Bâtiment Kyoto

Le Grand-Saconnex, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 60 M CHF

Construction of an administrative building in the new Green Village district on the site of the Ecumenical Center of Churches.

AFW Holligen Nord

Bern, Switzerland

Start of construction: May 2022
Construction volume (value of our services): 7,3 M CHF

Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.

Ersatzneubau Tokeh

Zürich, Switzerland

Start of construction: April 2022
Construction volume (value of our services): 7,63 M CHF

For the replacement TOKEH building, a new morphological building type was generated that combines the two row buildings (longitudinal and transverse to the slope) prevalent in the neighborhood into a cruciform floor plan. …

Ersatzneubau Bahnhof Liestal, Neubau Wohn- und Verwaltungsgebäude

Liestal, Switzerland

Start of construction: February 2022
Construction volume (value of our services): 40 M CHF

In recent years, SBB station Liestal has developed into the transport hub of the upper Basel region. For this reason, SBB is planning comprehensive infrastructure measures to improve services and increase capacity. …

Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223

Baden, Switzerland

Start of construction: October 2021
Construction volume (value of our services): 12 M CHF

A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…

Secondo tubo San Gottardo - Lot 243, North access tunnel

Göschenen, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 86,5 M CHF

To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…

Adlikon Leebern

Adlikon, Switzerland

Start of construction: January 2021
Construction volume (value of our services): 1,7 M CHF

The Adlikon Leebern project is spread over three stages, which will be carried out one after the other. The contract is worth around 1.7 million Swiss francs.

Erneuerung Waldenburgerbahn Los 6.1

Waldenburg, Switzerland

Start of construction: October 2020
Construction volume (value of our services): 72 M CHF

The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…

Swiss Life Brannhof

Zürich, Switzerland

Start of construction: March 2020
Construction volume (value of our services): 100 M CHF

With the redevelopment of Swiss Life Brannhof in Zurich's Bahnhofstrasse comes a new and attractive mixed-use concept. Thus, the historic pioneering spirit on the renowned promenade and shopping street will be given a new lease…

New Aarau Cantonal Hospital "Dreiklang" (KSA) building

Aarau, Switzerland

Start of construction: January 2020

The cantonal hospital in Aarau is currently the largest new hospital building in Switzerland. The name "Dreiklang" (triad) is explained by the optimal interplay between functional areas and outpatient clinics in the base building…

Pont Neuf - Replacement Kettenbrücke Aarau

Aarau, Switzerland

Start of construction: November 2019
Construction volume (value of our services): 24 M CHF

The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.

Neubau Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: July 2019
Construction volume (value of our services): 47,6 M CHF

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

SBB Vierspurausbau – Liestal

Liestal, Switzerland

Start of construction: June 2019
Construction volume (value of our services): 114,7 M CHF

Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure. …

Staumauer Spitallamm – Grimsel

Grimsel, Switzerland

Start of construction: May 2019
Construction volume (value of our services): 98 M CHF

The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.

Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme

Zürich, Switzerland

Start of construction: September 2018
Construction volume (value of our services): 53,055 M CHF

Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.

Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS

St. Gallen, Switzerland

Start of construction: April 2018
Construction volume (value of our services): 68 M CHF

The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…

Lokstadt

Winterthur, Switzerland

Start of construction: January 2016
Construction volume (value of our services): 650 M CHF

A modern, urban and sustainable new district with fascinating industrial history in the heart of Winterthur

Pont-Rouge

Lancy, Switzerland

The upcoming opening of CEVA will give a boost to the neighborhoods that will be revitalized by the new rail link. This is the case for the area around the Pont-Rouge station, which becomes the gateway to the city from the Lancy…

Trèfle Campus Santé

Le Grand-Saconnex, Switzerland

Since the first quarter of the 20th century, it has been an implicit tradition for Geneva to host its international organizations on the right bank of Lake Geneva. This choice was justified in particular by the proximity of the…

Im Giessen

Dübendorf, Switzerland


Construction volume (value of our services): 260 M CHF

One of the most attractive residential areas in Dübendorf is being built in idyllic surroundings on the bank of the River Glatt. Featuring architecture that is sophisticated yet down to earth, the Im Giessen district forms an…