Onex, Implenia Switzerland Ltd.
À Onex, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts aux clients
Contact
References
Åseral Nord
Åseral, Norway
Start of construction: January 2018
Åseral North is located in the upper part of the Mandalsvassdraget in West Agder, existing facilities were built in the 1950s. In this undertaking, the Langevatn Dam was replaced by a new stone infill dam, which constitutes 10…
Fv. 6312 Berfjorden
Roan, Norway
Start of construction: February 2019
Existing Fv. 6312 was curved, narrow and heavily skredutsatt. The route had poor accessibility and a traffic volume of 380 vehicles, 15% of which was heavy traffic. New route 6312 is a landslide protection project which included…
FV. 857 – FV. 125 Bjarkøyforbindelsen
Grytøy, Harstad, Norway
Start of construction: December 2016
Bjarkøyforbindelsen is a road connection between Grytøy, Bjarkøy and Sandsøy in Harstad municipality in Troms.
Fv. 2904 Austvoll III new bridge and road connection
Flå, Norway
Start of construction: November 2020
The project concerns the construction of a new concrete bridge over Hallingdalselva, replacing the existing bridge. The existing bridge has been environmentally remediated on site (demolition, source separation and resilience)…
K13 Harpe bru/ K14 Solhaug bru/ K21 Vinstersletta bru
Sør-Fron, Norway
As part of the E6 H1 Frya-Vinstra project, Implenia constructed three bridges for AF Gruppen, of which Harpe bridge is the largest with its 320 m. Harpe Bridge crosses Lågen river at Harpefoss in Sør-Fron. Harpe bridge is a…
E136 Tresfjordbrua
Vestnes, Norway
Start of construction: October 2012
Implenia has built the E136 Tresfjordbrua, which was part of the repair of the E136 between Måndalstunnelen and Våge in Rauma municipality in Møre og Romsdal. Tresfjordbrua alone has led to a saving of approximately 13 kilometres…
Fv. 86 Gryllefjord bru
Senja, Troms, Norway
Start of construction: September 2012
Implenia has constructed a bridge across Gryllefjord, situated in the municipality of Torsken on Senja in Troms county. The bridge is a landslide protection project which in combination with the tunnel through Ballesvikskaret has…
Fv 48 Tunnel behind Tysse
Tysse, Norway
Implenia has constructed a new tunnel from Sætrevika to Tysseelva. The aim of the project was to relieve the centre of Tysse of through-traffic on FV 48 and to improve the poor road standard on this stretch. Implenia has…
E39 Vågsbotn-Hylkje
Bergen, Norway
Implenia has developed a new four-lane road from the roundabout in Vågsbotn to the junction at Haukås Næringspark. The road passes through Eikåsen as a tunnel. The aim was to improve traffic safety and accessibility in the area…
E6 Vinstra - Sjoa
Vinstra, Norway
Start of construction: February 2014
E6 Vinstra-Sjoa is part of Frya-Sjoa, which has been one of the biggest road developments in Norway in recent years. The contract was noted as the part of the "Plant of the Year" in 2016.
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed