Bourget du Lac, Implenia France SA
À Le Bourget du Lac, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Contact
References
Sandbukta-Moss-Såstad (SMS2A)
Sandbukta, Moss, Såstad, Norway
Start of construction: June 2019
The project New double track Sandbukta-Moss-Såstad (SMS2A) is part of the Intercity expansion, and is one of the parsellene in the direction of Halden (Østfoldbanens vestre line). On the line, 10.3 km of new double track will be…
Åseral Nord
Åseral, Norway
Start of construction: January 2018
Åseral North is located in the upper part of the Mandalsvassdraget in West Agder, existing facilities were built in the 1950s. In this undertaking, the Langevatn Dam was replaced by a new stone infill dam, which constitutes 10…
Fv. 6312 Berfjorden
Roan, Norway
Start of construction: February 2019
Existing Fv. 6312 was curved, narrow and heavily skredutsatt. The route had poor accessibility and a traffic volume of 380 vehicles, 15% of which was heavy traffic. New route 6312 is a landslide protection project which included…
Fv 48 Tunnel behind Tysse
Tysse, Norway
Implenia has constructed a new tunnel from Sætrevika to Tysseelva. The aim of the project was to relieve the centre of Tysse of through-traffic on FV 48 and to improve the poor road standard on this stretch. Implenia has…
E6 Vinstra - Sjoa
Vinstra, Norway
Start of construction: February 2014
E6 Vinstra-Sjoa is part of Frya-Sjoa, which has been one of the biggest road developments in Norway in recent years. The contract was noted as the part of the "Plant of the Year" in 2016.
K11 Rådal – Nordås – Flyplassvegen
Bergen, Norway
Start of construction: September 2015
E39 K11 Rådal - Nordås - The airport road is Implenia's largest road project in Norway and one of two main contracts on the E39 between Bergen and Os, which are part of the new standard road between Kristiansand and Trondheim. …
E134 Myntbrua–Trollerudmoen
Kongsberg, Norway
Start of construction: May 2016
Implenia builds the new E134 through Kongsberg in Buskerud. The contract is one of three main contracts on E134 between Damåsen and Saggrenda. One of the challenges for the project is areas with very little overburden. …
Secondo tubo San Gottardo - Lot 243, North access tunnel
Göschenen, Switzerland
Start of construction: April 2021
To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…
TELT, CO08 - Villard Clément
Lyon, France
Start of construction: January 2021
Construction of the base tunnel from the Villard Clément portal attacks.
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Address
Bourget du Lac, France
Implenia France SA
Savoie Technolac Parc Ouragan – Bat A, 20 rue du Lac Majeur
73370 Bourget du Lac