Nel sito di Bioggio è presente anche un deposito di Implenia. Il deposito è il partner interno affidabile dei cantieri per la fornitura di scorte e materiali e per un'ampia gamma di servizi. Offre un'ampia gamma di attrezzature e macchinari, oltre a piccoli materiali e ingegneria elettrica. In questo modo, il Werkhof garantisce che i cantieri siano in grado di lavorare.
SERVIZI OFFERTI
Contact
References
Ausbau K 268 Mellingerstrasse / Ersatz SBB Brücke B-223
Baden, Switzerland
Start of construction: October 2021
A complete rehabilitation and road/civil engineering redesign of the nearly 550 m long section of Mellingerstrasse in Baden is being undertaken. The operational optimizations of the heavily trafficked road envisage a concrete…
Steffisburg, Gschwendareal
Steffisburg, Switzerland
Start of construction: November 2022
The project included pavement paving as part of the environmental works of the Gschwendareal.
Biel, Umgestaltung Jakob-Stämpfli Strasse
Biel, Switzerland
Start of construction: January 2017
The rehabilitation of Jakob-Stämpfli-Strasse includes the construction of new sidewalks on both sides, the renewal of the entire road drainage system as well as the foundation and edge trims over a total length of 510m. …
Gesamtsanierung Monbijoustrasse
Bern, Switzerland
Start of construction: February 2021
The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.
Andockung MLK Frauenklinik, Inselspital
Bern, Switzerland
Start of construction: August 2018
The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.
Sanierung Abwasseranlagen Breitenrain
Bern, Switzerland
Start of construction: May 2016
The sewer systems in Viktoriastrasse and Moserstrasse in Bern have reached their age and are being replaced.
Neubau LNG-Anlage
Neuenegg, Switzerland
Start of construction: September 2020
Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.
Sanierung Werkleitungen und Umgestaltung Marktplatz
Lyss, Switzerland
Start of construction: April 2018
In Lyss, the market square was redesigned and the works pipelines were rehabilitated.
Umgestaltung Worbstrasse
Gümligen, Switzerland
Start of construction: June 2019
The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.
Sanierung Busplatz und Anpassungen Kantonsstrasse
Reichenbach im Kandertal, Switzerland
Start of construction: November 2019
The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.