Lysaker, Implenia Norge AS
In Lysaker können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Contact
References
Fv. 260 Frogner bru
Frogner, Sørum, Norway
Start of construction: August 2018
The project involved the design and construction of a new road bridge (96 m) and a new pedestrian and bicycle bridge (98 m) over Leira at Frogner on Fv. 260 (now Fv. 1496) in Sørum municipality. The bridges were to replace the…
E02 E16 Rud - Vøyenenga
Sandvika, Bærum, Norway
Start of construction: October 2016
E16 is a development project between Rud and Vøyenenga. The project consisted of the construction of a new E16, which today is mainly a 1.3 km long 4-lane road on the section E02 Rud-Vøyenenga in the municipality of Bærum. It was…
UFP-08 Eidanger
Porsgrunn, Norway
Start of construction: September 2013
Das Projekt UFP-08 Eidanger ist Teil der neuen Eisenbahnstrecke zwischen Larvik und Porsgrunn, die in der Zuteilung der "Vestfold Line, Farriseidet - Porsgrunn" enthalten ist. Der Abschnitt wird zweigleisig für eine…
K2A Tunnel og grunnarbeider Lysaker-Fornebu
Fornebu, Bærum, Norway
Start of construction: May 2021
The Fornebubanen will establish a new t-train line between Majorstuen and Fornebu. The line will run 8 km in a tunnel under the hill. The line will start with a new station and base at Fornebu and extend to Majorstuen where the…
E39 Lyngdal Øst - Lyngdal Vest
Lyngdal, Norway
Start of construction: January 2021
E39 Lyngdal East - Lyngdal West stretches from Herdal to Røyskår for a total of 11 km. The project involves a longer road with several tunnels, bridges and complex infrastructure. The contract will be executed as a total contract…
Sandbukta-Moss-Såstad (SMS2A)
Sandbukta, Moss, Såstad, Norway
Start of construction: June 2019
The project New double track Sandbukta-Moss-Såstad (SMS2A) is part of the Intercity expansion, and is one of the parsellene in the direction of Halden (Østfoldbanens vestre line). On the line, 10.3 km of new double track will be…
Åseral Nord
Åseral, Norway
Start of construction: January 2018
Åseral North is located in the upper part of the Mandalsvassdraget in West Agder, existing facilities were built in the 1950s. In this undertaking, the Langevatn Dam was replaced by a new stone infill dam, which constitutes 10…
Fv. 6312 Berfjorden
Roan, Norway
Start of construction: February 2019
Existing Fv. 6312 was curved, narrow and heavily skredutsatt. The route had poor accessibility and a traffic volume of 380 vehicles, 15% of which was heavy traffic. New route 6312 is a landslide protection project which included…
FV. 857 – FV. 125 Bjarkøyforbindelsen
Grytøy, Harstad, Norway
Start of construction: December 2016
Bjarkøyforbindelsen is a road connection between Grytøy, Bjarkøy and Sandsøy in Harstad municipality in Troms.
Fv. 2904 Austvoll III new bridge and road connection
Flå, Norway
Start of construction: November 2020
The project concerns the construction of a new concrete bridge over Hallingdalselva, replacing the existing bridge. The existing bridge has been environmentally remediated on site (demolition, source separation and resilience)…