
Göteborg, Implenia Sverige AB
I Göteborg har våra kunder tillgång till hela Implenias tjänsteutbud. Våra anställda täcker spektrumet av specialistområden för att kunna erbjuda den bästa lösningen från en enda källa.
Contact
Primary Contact
References
Sofia
Stockholm, Sweden
Start of construction: August 2021
Sofia metro station is part of the extension of the blue line towards Gullmarsplan and Nacka
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Kvarnholmsförbindelsen
Stockholm, Sweden
Kvarnholmen is an island in the Stockholm Archipelago that was used industrially. The former industrial area has now been developed into a vibrant urban environment.
Getingmidjan
Stockholm, Sweden
Start of construction: April 2017
Complex project in the heart of Stockholm.
Rönnskär - Endlager
Skellefteå, Sweden
Start of construction: January 2018
Implenia Sweden is building a repository for process waste from Boliden's Rönnskär copper smelter in Skelleftehamn. Boliden has awarded Implenia the contract, which essentially consists of drilling and blasting a series of rock…
Slussen SN91
Stockholm, Sweden
Start of construction: January 2018
Extensive rock and concrete work at Katarina Mountain
Citylink Anneberg-Skanstull Tunnel
Stockholm, Sweden
Start of construction: December 2018
As the second of four phases of the so-called City Link Project, the Anneberg-Skanstull Tunnel serves to improve the power supply in the Greater Stockholm area. At a length of around 14 km and a diameter of 5 m, the tunnel is…
Varberg Tunneln FAS 2
Varberg, Sweden
Start of construction: June 2018
Strategically important railway project in Varberg.
Citybanan Project Odenplan and Vasatunnel
Stockholm, Sweden
Start of construction: December 2008
The Citybanan connects the northern and the southern part of Stockholm subterranean with two additional rail tracks and doubles the capacity of the rail connection which exists since 1871. The wider area of Stockholm increases by…
Malmö Citytunnel Lot E201
Malmö, Sweden
Start of construction: December 2004
The Citytunnel Malmö is part of the in total 17 km long railway infrastructure project to improve connections of the Swedish railway network across the Öresund Bridge to Denmark and the European high speed railway network. …
Address
Göteborg, Sweden
Implenia Sverige AB
Otterhällegatan 1
411 18 Göteborg