![[Translate to English:] Verbundkonzept [Translate to English:] Verbundkonzept](/fileadmin/_processed_/2/c/csm_100_0991_2f03b353b5.jpg)
![[Translate to English:] Verbundkonzept [Translate to English:] Verbundkonzept](/fileadmin/_processed_/6/e/csm_100_0935_705ab92f2f.jpg)
Combined concept
Short description
Extensive structural work with supporting walls and staircases – construction period: 6 months.
The project
- Extensive structural work with supporting walls and staircases
- Material supply – in some cases from the water
- High requirements for exposed concrete
- Embankment securing
- Construction period: 6 months