Onex, Implenia Switzerland Ltd.
À Onex, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts aux clients
Contact
References
Weiterbau der Grundwasserwanne Ohu
Essenbach, Germany
Start of construction: April 2020
Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
East Side Combined Sewer Overflow ESCSO
Portland, United States
Start of construction: May 2005
As the largest of all Portland’s projects to reduce overflows into the Willamette River, the East Side Combined Sewer Overflow tunnel is designed to significantly reduce sewage and storm water overflows. To reduce risk exposure…
Taiwan High Speed Railway
Changhua, 石牌里, Taiwan
Start of construction: May 2000
Lot 6 (C 260) is 36.60 km long and includes seven tunnels with a total length of 9,245 m. The 7,276 m long Paghuashan Tunnel is the longest of tunnels. The lengths of the two northern and four southern shorter tunnels range…
Funicular railway Schwyz-Stoos
Schwyz, Switzerland
Start of construction: May 2013
The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle…
SBB Bözbergtunnel
Strihen, Switzerland
Start of construction: May 2015
The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project. …
Varberg Tunneln FAS 2
Varberg, Sweden
Start of construction: June 2018
Strategically important railway project in Varberg.
Citybanan Project Odenplan and Vasatunnel
Stockholm, Sweden
Start of construction: December 2008
The Citybanan connects the northern and the southern part of Stockholm subterranean with two additional rail tracks and doubles the capacity of the rail connection which exists since 1871. The wider area of Stockholm increases by…
Malmö Citytunnel Lot E201
Malmö, Sweden
Start of construction: December 2004
The Citytunnel Malmö is part of the in total 17 km long railway infrastructure project to improve connections of the Swedish railway network across the Öresund Bridge to Denmark and the European high speed railway network. …
Wienerwald-Tunnel
Westportal Wienerwaldtunnel, Austria
Start of construction: December 2003
The Wienerwald Tunnel is an integral part of the new high speed railway line between Vienna and St. Pölten.
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed