Onex, Implenia Switzerland Ltd.
À Onex, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts aux clients
Contact
References
Métro Lausanne, M2 Lot 1700
Lausanne, Switzerland
Start of construction: March 2004
Ouchy-Epalinges metro line via the Central Station and Place de l'Europe. Total length: 6 km, 14 stops, 9 tunnels and 5 bridges.
Steffisburg, Gschwendareal
Steffisburg, Switzerland
Start of construction: November 2022
The project included pavement paving as part of the environmental works of the Gschwendareal.
Verkehrssanierung und städtebauliche Entwicklung in Laupen
Laupen, Switzerland
Start of construction: March 2023
After completion of the project, the course of the Sense River will be wider and more natural. Thus, the town of Laupen, the new train station, the bicycle and hiking paths along the Sense and the settlements in the Sense area…
Biel, Umgestaltung Jakob-Stämpfli Strasse
Biel, Switzerland
Start of construction: January 2017
The rehabilitation of Jakob-Stämpfli-Strasse includes the construction of new sidewalks on both sides, the renewal of the entire road drainage system as well as the foundation and edge trims over a total length of 510m. …
Fulenbach, Erweiterung
Bern, Switzerland
Start of construction: May 2023
The project included the construction of an access road on the premises of Fischer Papier AG.
Gesamtsanierung Monbijoustrasse
Bern, Switzerland
Start of construction: February 2021
The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.
Andockung MLK Frauenklinik, Inselspital
Bern, Switzerland
Start of construction: August 2018
The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.
Neubau LNG-Anlage
Neuenegg, Switzerland
Start of construction: September 2020
Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.
Sanierung Werkleitungen und Umgestaltung Marktplatz
Lyss, Switzerland
Start of construction: April 2018
In Lyss, the market square was redesigned and the works pipelines were rehabilitated.
Umgestaltung Worbstrasse
Gümligen, Switzerland
Start of construction: June 2019
The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed