Bern, Implenia Switzerland Ltd.
Das bärenstarke Team für Ihre Bauprojekte
In Bern können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
References
AFW Holligen Nord
Bern, Switzerland
Start of construction:
May 2022
Construction volume (value of our services):
7,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Energie Wasser Bern is connecting the Holligen district with district heating pipelines as part of various expansion stages.
Neubau Grundwasserfassung Oberi Au
Uttigen, Switzerland
Start of construction:
August 2021
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…
Gesamtsanierung Monbijoustrasse
Bern, Switzerland
Start of construction:
February 2021
Construction volume (value of our services):
13,2 M EUR
Costs converted according to average yearly exchange rates during project realization
The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.
Neubau LNG-Anlage
Neuenegg, Switzerland
Start of construction:
September 2020
Construction volume (value of our services):
609.000 EUR
Costs converted according to average yearly exchange rates during project realization
Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.
Worblaufen Hammerwerk residential development
Worblaufen, Switzerland
Start of construction:
May 2020
Construction volume (value of our services):
29,9 M EUR
Costs converted according to average yearly exchange rates during project realization
New residential development on the banks of the River Aare on the former Hammerwerke site in the municipality of Ittigen / Worblaufen (BE).
Erneuerung Saanenmöserstrasse Priorität 2, Los 8+9
Zweisimmen, Switzerland
Start of construction:
April 2020
Construction volume (value of our services):
5,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised an approx. 1.1 km long section in the overall project of the renewal of the Saanenmöserstrasse (cantonal road no. 11). It was located in the Ledigraben - Rychestei section and was divided into 2 lots (lots 8…
Bernapark, Erschliessung Marktplatz und Speditionsplatz
Stettlen, Switzerland
Start of construction:
March 2020
Construction volume (value of our services):
2,7 M EUR
Costs converted according to average yearly exchange rates during project realization
Bernapark AG created the "Bernapark" on an old factory site, a new quarter that combines living, working and leisure in one place. We carried out the civil engineering work for this project. These took place in different parts of…
Sanierung Busplatz und Anpassungen Kantonsstrasse
Reichenbach im Kandertal, Switzerland
Start of construction:
November 2019
Construction volume (value of our services):
582.000 EUR
Costs converted according to average yearly exchange rates during project realization
The project included the renovation of the bus station at the Reichenbach train station and work on the adjacent cantonal road.
Herrenschwanden New school building
Herrenschwanden, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
7,6 M EUR
Costs converted according to average yearly exchange rates during project realization
School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)
Umgestaltung Worbstrasse
Gümligen, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
1,4 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprised the rehabilitation and extension of Worbstrasse between the junction with Allmendingenweg and the end of the village.
Korrektion Gerbers Kurve
Reichenbach im Kandertal, Switzerland
Start of construction:
October 2018
Construction volume (value of our services):
1,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The current road exiting the village of Reichenbach has different road widths. There are crossing problems in many places, especially when trucks or post buses are involved. Therefore, the OIK I plans to rehabilitate the section…
Deisswil b. Stettlen Bernapark
Bernapark, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
61,6 M EUR
Costs converted according to average yearly exchange rates during project realization
Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.
Andockung MLK Frauenklinik, Inselspital
Bern, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
1,7 M EUR
Costs converted according to average yearly exchange rates during project realization
The project included the completion of the media and logistics channel (MLK) for the women's clinic at Inselspital.
Schmitten Residential development Bodenmattpark
Schmitten, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
17,6 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential development in the village centre of Schmitten (FR). The 70 flats of owner-occupied standard are divided into 5 buildings, each with 5 storeys. The surroundings would be designed according to the…
Sanierung Werkleitungen und Umgestaltung Marktplatz
Lyss, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
1,9 M EUR
Costs converted according to average yearly exchange rates during project realization
In Lyss, the market square was redesigned and the works pipelines were rehabilitated.
Erneuerung Saanenmöserstrasse Priorität 3, Los 5+6+7
Saanenmöser, Switzerland
Start of construction:
June 2017
Construction volume (value of our services):
9,3 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project comprised an approx. 1.95 km long section in the overall project of the renewal of the Saanenmöserstrasse.
Bassbelt residential complex
Pieterlen, Switzerland
Start of construction:
January 2017
Construction volume (value of our services):
20,7 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…
Sanierung Abwasseranlagen Breitenrain
Bern, Switzerland
Start of construction:
May 2016
Construction volume (value of our services):
12,6 M EUR
Costs converted according to average yearly exchange rates during project realization
The sewer systems in Viktoriastrasse and Moserstrasse in Bern have reached their age and are being replaced.
Biel Residential development Jardin du Paradis
Biel, Switzerland
Start of construction:
October 2015
Construction volume (value of our services):
78,3 M EUR
Costs converted according to average yearly exchange rates during project realization
New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.
Hinterkappelen Capella residential development
Hinterkappelen Wohlen, Switzerland
Start of construction:
September 2014
Construction volume (value of our services):
22,8 M EUR
Costs converted according to average yearly exchange rates during project realization
74 rental flats in Minergie standard
Address
Bern, Switzerland
Implenia Switzerland Ltd.
Wabernstrasse 40
3007 Bern
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Division Civil Engineering
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:00
13:00
-
17:00
Closed