Alpnach Dorf, Implenia Switzerland Ltd.
In Alpnach können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
References
E39 Vågsbotn-Hylkje
Bergen, Norway
Implenia has developed a new four-lane road from the roundabout in Vågsbotn to the junction at Haukås Næringspark. The road passes through Eikåsen as a tunnel. The aim was to improve traffic safety and accessibility in the area…
E6 Vinstra - Sjoa
Vinstra, Norway
Start of construction: February 2014
E6 Vinstra-Sjoa is part of Frya-Sjoa, which has been one of the biggest road developments in Norway in recent years. The contract was noted as the part of the "Plant of the Year" in 2016.
K11 Rådal – Nordås – Flyplassvegen
Bergen, Norway
Start of construction: September 2015
E39 K11 Rådal - Nordås - The airport road is Implenia's largest road project in Norway and one of two main contracts on the E39 between Bergen and Os, which are part of the new standard road between Kristiansand and Trondheim. …
E134 Myntbrua–Trollerudmoen
Kongsberg, Norway
Start of construction: May 2016
Implenia builds the new E134 through Kongsberg in Buskerud. The contract is one of three main contracts on E134 between Damåsen and Saggrenda. One of the challenges for the project is areas with very little overburden. …
Erneuerung Waldenburgerbahn Los 6.1
Waldenburg, Switzerland
Start of construction: October 2020
The renewal of the Waldenburg railway between Liestal and Waldenburg includes the upgrading of sections of the line to double track, the reconstruction and new construction of stops, the total renovation of the Waldenburg…
Pont Neuf - Replacement Kettenbrücke Aarau
Aarau, Switzerland
Start of construction: November 2019
The project includes the dismantling of the existing Kettenbrücke bridge and the construction of the new Aare bridge "Pont Neuf" in Aarau.
Secondo tubo San Gottardo - Lot 243, North access tunnel
Göschenen, Switzerland
Start of construction: April 2021
To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…
Südwestumfahrung Brugg
Brugg/Windisch/Hausen, Switzerland
Start of construction: April 2019
The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.
TELT, CO08 - Villard Clément
Lyon, France
Start of construction: January 2021
Construction of the base tunnel from the Villard Clément portal attacks.
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Address
Alpnach Dorf, Switzerland
Implenia Switzerland Ltd.
Steinmattli 1
6055 Alpnach Dorf