|
Respect for the environment,
Topics and projects,
Switzerland

Sustainable use of excavated material at the Gotthard

The construction of the second tube of the Gotthard Road Tunnel is generating a total of around 7.4 million tonnes of excavated material. A significant proportion of the rock is being reused – including for the creation of near-natural shoreline areas on Lake Uri.