20 references Sort by:
asc desc

Fulenbach, Erweiterung

Bern, Switzerland

Start of construction: May 2023
Construction volume (value of our services): 141.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included the construction of an access road on the premises of Fischer Papier AG.

Leonardo Zürich

Zürich, Switzerland

Start of construction: February 2023
Construction volume (value of our services): 274.000 EUR Costs converted according to average yearly exchange rates during project realization

In the New Leonardo office building in Zurich Oerlikon, the joinery was commissioned to carry out the interior fit-out of the new catering area.

Steffisburg, Gschwendareal

Steffisburg, Switzerland

Start of construction: November 2022
Construction volume (value of our services): 121.000 EUR Costs converted according to average yearly exchange rates during project realization

The project included pavement paving as part of the environmental works of the Gschwendareal.

Neubau REFH Sandblatte Rain

Rain, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 2,633 M EUR Costs converted according to average yearly exchange rates during project realization

The "Sandblatte" development comprises 22 terraced single-family homes and three commercial premises.

EWZ Werkhof Herdern

Zürich, Switzerland

Start of construction: August 2022
Construction volume (value of our services): 1,012 M EUR Costs converted according to average yearly exchange rates during project realization

The façade of the new Werkhof Herdern building consists of over 2,500 m² of untreated, local Douglas fir wood with special profiles, which were developed for the project in close collaboration with the architect and the supplier.…

Ersatzneubau Riedacker

Zürich, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 2,43 M EUR Costs converted according to average yearly exchange rates during project realization

For the new Riedacker replacement building, timber construction elements were mounted on a solid steel and concrete structure.

Stettlen, Schwandihof WL

Bern, Switzerland

Start of construction: June 2022
Construction volume (value of our services): 307,816 M EUR Costs converted according to average yearly exchange rates during project realization

With the "Schwandihof property", Bernapark AG created a new quarter on an old farm site, which combines living, work and leisure in one place. We carried out the civil engineering work for this project. These were carried out in…

Parkhaus Forschungskampus EMPA

Düebendorf, Switzerland

Start of construction: March 2022
Construction volume (value of our services): 1,792 M EUR Costs converted according to average yearly exchange rates during project realization

A new campus is being built on the Empa-Eawag site in Dübendorf, consisting of a laboratory and a multifunctional building with a parking garage.

Ottikon Schulhausstrasse

Ottikon bei Kemptthal, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 84.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is realizing the interior fittings and custom-made products for the new construction of the Wachter multi-family house.

Überbauung Lindenweg

Zell, Switzerland

Start of construction: November 2021
Construction volume (value of our services): 2,291 M EUR Costs converted according to average yearly exchange rates during project realization

Production and assembly of prefabricated pitched roof elements.

Green Village Route de Ferney

Genf, Switzerland

Start of construction: September 2021
Construction volume (value of our services): 388.000 EUR Costs converted according to average yearly exchange rates during project realization

The building is named after the Montreal Protocol, an international agreement signed by 24 countries in 1987 to reduce by half the number of substances that damage the ozone layer. In 2009, it became the first universally…

Neubau Grundwasserfassung Oberi Au

Uttigen, Switzerland

Start of construction: August 2021
Construction volume (value of our services): 2,655 M EUR Costs converted according to average yearly exchange rates during project realization

Wasserverbund Region Bern AG (WVRB AG) had a new groundwater well built in Uttigen, including the intake structure. For this purpose, a siphon line (DN 800 mm) was also built between the new intake and the existing unification…

Laborprovisorium Functional Genomics Center Zürich

Zürich, Switzerland

Start of construction: July 2021
Construction volume (value of our services): 16,332 M EUR Costs converted according to average yearly exchange rates during project realization

The Functional Genomics Center Zurich (FGCZ), a joint research and education platform of the University of Zurich (UZH) and ETH Zurich, will provide space for 80 laboratory staff and scientific equipment on a total area of…

Neubau Mehrzweckgebäude Alterswil

Alterswil, Switzerland

Start of construction: June 2021
Construction volume (value of our services): 2,113 M EUR Costs converted according to average yearly exchange rates during project realization

The Alterswil multi-purpose building is an important part of the Alterswil municipality's infrastructure. It is used for school lessons, sports, events and other purposes.

Zollikerberg Langwattstrasse

Zollikerberg, Switzerland

Start of construction: May 2021
Construction volume (value of our services): 98.000 EUR Costs converted according to average yearly exchange rates during project realization

Implenia Holzbau is carrying out the interior finishing work on the new Langwattstrasse apartment building in Zollikerberg.

Lokstadt Elefant

Winterthur, Switzerland

Start of construction: April 2021
Construction volume (value of our services): 43,072 M EUR Costs converted according to average yearly exchange rates during project realization

The "Elefant" is a modern office building consisting of a historic part of the building and a new 7-storey timber construction. This makes it one of the largest timber office buildings that Implenia has developed and realized for…

Masterplan Forschungscampus Empa Eawag, Etappe 1

Düebendorf, Switzerland

Start of construction: April 2021

In the first stage of the new campus on the existing Empa-Eawag site in Dübendorf, a new laboratory building, a multifunctional building with parking garage and the outdoor space design are being designed with SAM Architekten and…

Gesamtsanierung Monbijoustrasse

Bern, Switzerland

Start of construction: February 2021
Construction volume (value of our services): 13,161 M EUR Costs converted according to average yearly exchange rates during project realization

The track system for the streetcar on Monbijoustrasse from the Eigerstrasse junction to the Seftigenstrasse junction had to be replaced due to its age.

Neubau LNG-Anlage

Neuenegg, Switzerland

Start of construction: September 2020
Construction volume (value of our services): 608.000 EUR Costs converted according to average yearly exchange rates during project realization

Wander AG had a new filling station for an LNG plant (depot for liquefied natural gas) and a storage area for pressing troughs built on its site in Neuenegg.

MFH Lilienstrasse

Allschwil, Switzerland

Start of construction: July 2020
Construction volume (value of our services): 6,508 M EUR Costs converted according to average yearly exchange rates during project realization

The "Lilienstrasse" project consists of a four-storey building and a car park.