Onex, Implenia Switzerland Ltd.
In Onex, our customers have access to Implenia's entire service portfolio. Our specialists work across the board, regardless of location or division, to offer you the best solution from a single source.
SERVICES OFFERED TO CUSTOMERS
Contact
References
Hyparschale Magdeburg
Magdeburg, Germany
Start of construction: October 2020
Reinforcement of the supporting and shell structure of the Hyparschale built in 1969 in Magdeburg using carbon concrete.
Subway access structure Oberhafentunnel
Hamburg, Germany
Start of construction: August 2020
Construction of a new subway access structure with connection to the station HafenCity University
Haus Adeline Favre (Hall 52)
Winterthur, Switzerland
Start of construction: December 2016
In 2017, Siska Heuberger Holding AG acquired Hall 52 from Implenia Schweiz AG as the owner and developer in the Lokstadt district and, at the same time, commissioned Implenia with the turnkey contractor mandate for the new…
Errichtung LasmAaZ – Kernkraftwerk Krümmel
Geesthacht, Germany
Start of construction: June 2020
Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.
Stadtbahnlinie U81, Los 1, Rohbau Hochtrasse
Düsseldorf, Germany
Start of construction: June 2020
Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated…
Stadtbahn line U81, lot 2, shell construction of tunnel
Düsseldorf, Germany
Start of construction: May 2020
Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction. …
Weiterbau der Grundwasserwanne Ohu
Essenbach, Germany
Start of construction: April 2020
Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
East Side Combined Sewer Overflow ESCSO
Portland, United States
Start of construction: May 2005
As the largest of all Portland’s projects to reduce overflows into the Willamette River, the East Side Combined Sewer Overflow tunnel is designed to significantly reduce sewage and storm water overflows. To reduce risk exposure…
Taiwan High Speed Railway
Changhua, 石牌里, Taiwan
Start of construction: May 2000
Lot 6 (C 260) is 36.60 km long and includes seven tunnels with a total length of 9,245 m. The 7,276 m long Paghuashan Tunnel is the longest of tunnels. The lengths of the two northern and four southern shorter tunnels range…
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed