Schattdorf, Implenia Switzerland Ltd.
In Schattdorf können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Am Standort Schattdorf befindet sich zudem ein Implenia Werkhof. Der Werkhof ist der zuverlässige interne Partner der Baustellen zur Versorgung mit Inventar bzw. Material und einer breiten Palette von Dienstleistungen. Angeboten werden unter anderem zahlreiche Gerätschaften und Maschinen sowie Kleinmaterial und Elektrotechnik. Der Werkhof stellt so die Arbeitsfähigkeit der Baustellen sicher.
Unsere Leistungen
Contact
References
N01/42, 46 UPlaNS junction Zurich East – Effretikon
Wallisellen, Switzerland
Start of construction: February 2018
Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.
Pont Rouge Lot B1
Lancy, Switzerland
Start of construction: August 2015
Construction of a complex for SBB Real Estate consisting of three towers of 13 to 15 floors (total area of 47'365 m2 of offices and shops) but also an underground parking of 353 places on 3 levels of basements over the entire…
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction: October 2016
Construction of new swimming pool and sports hall on Sursee campus
Andreasturm
Zurich, Switzerland
Start of construction: April 2016
SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…
Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme
Zürich, Switzerland
Start of construction: September 2018
Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction: May 2008
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction: May 2008
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Zurich, ETH Gloriastrasse
Zurich, Switzerland
Start of construction: June 2015
For construction of the new research and laboratory building GLC in the university district in central Zurich, the existing Hydraulics, Hydrology and Glaciology (VAW) building and the Gloriabar on Gloriastrasse were dismantled.…
Panxwiesen groundwater pumping station, Malans
Malans, Switzerland
Start of construction: January 2018
A new pumping station was built in the Panxwiesen district in order to increase the drinking water capacity of the municipalities of Malans and Landquart.
Basel, Roche Construction 02 (Roche Tower 2)
Basel, Switzerland
Start of construction: October 2016
The joint venture for Roche Construction 02, consisting of the Foundation Engineering business unit of Implenia Switzerland Ltd. and BAUER Schweiz AG, was instructed by Hofmann – La Roche in 2016 to construct the excavation pit…
Address
Schattdorf, Switzerland
Implenia Switzerland Ltd.
Umfahrungsstrasse 3
6467 Schattdorf