Emmering, Implenia Construction GmbH (Baustofftechnik)
In Emmering können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
References
Stadtbahn line U81, lot 2, shell construction of tunnel
Düsseldorf, Germany
Start of construction: May 2020
Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction. …
Weiterbau der Grundwasserwanne Ohu
Essenbach, Germany
Start of construction: April 2020
Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
Albvorlandtunnel
Wendlingen am Neckar, Germany
Start of construction: January 2016
The new railway link (NBS) Wendlingen-Ulm together with Stuttgart 21 significantly improves the infrastructure of Baden-Württemberg and thus creates shortened travel and transport times not only in Baden-Württemberg but also…
380-kV-Kabeldiagonale, 50hertz
Berlin, Germany
Start of construction: August 2019
Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts
U5, Berlin
Berlin, Germany
Start of construction: December 2011
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
Heat accumulator, Dessau
Dessau-Roßlau, Germany
Start of construction: November 2014
Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau
Metro Subway Nuremberg U3, BA 2.1
Nuremberg, Germany
Start of construction: July 2014
In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west…
Niederfinow ship lift
Niederfinow, Germany
Start of construction: May 2008
Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal.
Ilmenau sewage treatment plant
Ilmenau, Germany
Start of construction: August 2015
New replacement for the Ilmenau sewage treatment plant
Address
Emmering, Germany
Implenia Construction GmbH (Baustofftechnik)
Dr.-Rank-Straße 9
82275 Emmering