München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
Tunnel Silberberg
Großbreitenbach, Germany
Start of construction: January 2009
The New Railway Line of the German Railway System from Ebensfeld to Erfurt is part of the “Deutsche Einheit” Track No. 8 expansion and new railway project that runs from Nuremberg to Berlin. It is the connecting link between the…
Albvorlandtunnel
Wendlingen am Neckar, Germany
Start of construction: January 2016
The new railway link (NBS) Wendlingen-Ulm together with Stuttgart 21 significantly improves the infrastructure of Baden-Württemberg and thus creates shortened travel and transport times not only in Baden-Württemberg but also…
380-kV-Kabeldiagonale, 50hertz
Berlin, Germany
Start of construction: August 2019
Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts
U5, Berlin
Berlin, Germany
Start of construction: December 2011
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
Metro Subway Nuremberg U3, BA 2.1
Nuremberg, Germany
Start of construction: July 2014
In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west…
Niederfinow ship lift
Niederfinow, Germany
Start of construction: May 2008
Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal.
Ilmenau sewage treatment plant
Ilmenau, Germany
Start of construction: August 2015
New replacement for the Ilmenau sewage treatment plant
Elevated water tank in Bamberg
Bamberg, Germany
Start of construction: April 2014
An elevated container with a usable capacity of 10,000 cubic metres was constructed above Bamberg old town in order to ensure a continuous supply of drinking water.
Mannheim power station
Mannheim, Germany
Start of construction: May 2009
Construction of a coal-fired power station unit to ensure the long-term security of electricity and district heating generation