Pont-Rouge
Lancy, Switzerland
The upcoming opening of CEVA will give a boost to the neighborhoods that will be revitalized by the new rail link. This is the case for the area around the Pont-Rouge station, which becomes the gateway to the city from the Lancy…
Trèfle Campus Santé
Le Grand-Saconnex, Switzerland
Since the first quarter of the 20th century, it has been an implicit tradition for Geneva to host its international organizations on the right bank of Lake Geneva. This choice was justified in particular by the proximity of the…
Im Giessen
Dübendorf, Switzerland
Construction volume (value of our services):
260 M CHF
One of the most attractive residential areas in Dübendorf is being built in idyllic surroundings on the bank of the River Glatt. Featuring architecture that is sophisticated yet down to earth, the Im Giessen district forms an…
Lokstadt
Winterthur, Switzerland
Start of construction:
January 2016
Construction volume (value of our services):
650 M CHF
A modern, urban and sustainable new district with fascinating industrial history in the heart of Winterthur
Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS
St. Gallen, Switzerland
Start of construction:
April 2018
Construction volume (value of our services):
68 M CHF
The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…
Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme
Zürich, Switzerland
Start of construction:
September 2018
Construction volume (value of our services):
53,055 M CHF
Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.
Staumauer Spitallamm – Grimsel
Grimsel, Switzerland
Start of construction:
May 2019
Construction volume (value of our services):
98 M CHF
The new double-curvature arch dam will be built directly in front of the existing dam. The old dam will remain in place and will be flooded at a later date.
SBB Vierspurausbau – Liestal
Liestal, Switzerland
Start of construction:
June 2019
Construction volume (value of our services):
114,7 M CHF
Expansion of the SBB railway line from two tracks to four over a length of 2.5 km, upgrading the train station including the construction of new structures on the platform, and modifications to the infrastructure. …
Neubau Kantonsspital Baden AGNES
Baden, Switzerland
Start of construction:
July 2019
Construction volume (value of our services):
47,6 M CHF
New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.