Watch video

New construction "WolkenWerk" Zurich

In the three high-rise buildings and basement floors of the "WolkenWerk" in Zurich, more than 300 condominiums have been created with a demand for high living quality and sustainability.

Holistically conceived new buildings

New construction


New construction competence in practice

A building becomes good from the ground up when it is designed and implemented holistically


Design models

You have the choice between different models


Your contacts

We look forward to talking to you about forward-looking new buildings and sophisticated modernisations.

Jens Vollmar
Head Division Buildings & Country President Schweiz

 

 

+41 58 474 06 10 jens.vollmar@implenia.com Linkedin Download VCF-Card Business card
Stefan Winkler, MRICS
Head of Real Estate Consulting and Clients / Head of Region Central
+41 58 474 34 62 stefan.winkler@implenia.com Linkedin Download VCF-Card Business card
Roman Müller
Head of Master Builder German-speaking Switzerland
+41 58 474 04 54 roman.mueller@implenia.com Linkedin Download VCF-Card Business card
Marc Brülhart
Head Northwest Region
marc.bruelhart@implenia.com Linkedin Download VCF-Card Business card
Raffaele Balmelli
Head of Region Central / East, Branch Manager Lugano & Chur a.i.
+41 58 474 10 95 raffaele.balmelli@implenia.com Linkedin Download VCF-Card Business card
Danila Aimone
Head Region West
+41 58 474 05 16 danila.aimone@implenia.com Linkedin Download VCF-Card Business card
Thomas Rolli
Leiter Region Zürich
Division Buildings
thomas.rolli@implenia.com Linkedin Download VCF-Card Business card
Philippe Laurent Kaufmann
Head of Modernisation Switzerland
+41 58 474 27 50 philippelaurent.kaufmann@implenia.com Download VCF-Card Business card
Eric Burg
Head of Modernisation and Branch Manager Onex
eric.burg@implenia.com Linkedin Download VCF-Card Business card

Our locations

14 locations Sort by:
asc desc

Contact

Would you like advice on the subject of execution models?

* mandatory fields

Our new building references

Pressy 17

Vandœuvres, Switzerland

Start of construction: March 2017

In a neighborhood of beautiful residences in the commune of Vandoeuvres, on a 15,928 square meter plot, a complex of four volumes has replaced the 1960s villa. In the heart of this haven of peace bordering the Geneva Golf Club,…

Edmond Vaucher

Châtelaine, Switzerland

Start of construction: February 2017

oie perpendicular to the avenue de Châtelaine and the carrefour du Bouchet, the avenue Edmond-Vaucher traces a long straight line in a disparate landscape where the allotment gardens and the public park impose their green lung…

Pont-Rouge B4-B5

Lancy, Switzerland

The creation of CEVA has been the basis for a real estate revival along the route of this new rail link. The area around the Pont-Rouge station is a very good example of this, as it becomes the gateway to the city from the Lancy…

Atrium Park

Genève, Australia

Start of construction: May 2017

The municipality of Meyrin, which enjoys a strategic position of the first rank, regroups the most important industrial zones of the canton of Geneva and counts numerous urbanistic projects ensuring the good development of a…

Les Jardins de Rozon

Croix-de-Rozon, Australia

Start of construction: January 2020

Marking the border with France, the municipality of Bardonnex includes several localities with residential vocation such as La Croix-de-Rozon

Petite Prairie 2

Nyon, Australia

The concept aims at creating an island oriented towards Lake Geneva on the one hand and towards the Jura mountain range on the other hand, with a morphology allowing to open up numerous perspectives, to limit the number of facing…

Quartier de l'Etang - Îlot E

Vernier, Switzerland

Start of construction: December 2018

The Quartier de l'Etang, an exemplary conversion of an industrial site two kilometers from the historic center of Geneva, has become a strategic urban piece. Located in the commune of Vernier, it extends over a 9.5 hectare…

Migros Ticino

Lugano, Switzerland

Start of construction: January 2014

Conversion and renovation; facade renovation

LCA Supercomputing Center

Lugano, Switzerland

Start of construction: July 2010

New construction LCA Supercomputing Center Turnkey construction Construction and building services work Office building with four floors

Neubau Leister AG

Kägiswil, Switzerland

Start of construction: January 2018

Addition of a new production to the existing building.