Wien, Implenia Österreich GmbH
In Wien können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Contact
References
Pumpspeicherkraftwerk Nant de Drance
Finhaut VS (Le Châtelard), Switzerland
Start of construction: January 2008
Construction of an underground pumped-storage power station.
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction: May 2008
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction: May 2008
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Zurich, ETH Gloriastrasse
Zurich, Switzerland
Start of construction: June 2015
For construction of the new research and laboratory building GLC in the university district in central Zurich, the existing Hydraulics, Hydrology and Glaciology (VAW) building and the Gloriabar on Gloriastrasse were dismantled.…
Panxwiesen groundwater pumping station, Malans
Malans, Switzerland
Start of construction: January 2018
A new pumping station was built in the Panxwiesen district in order to increase the drinking water capacity of the municipalities of Malans and Landquart.
Basel, Roche Construction 02 (Roche Tower 2)
Basel, Switzerland
Start of construction: October 2016
The joint venture for Roche Construction 02, consisting of the Foundation Engineering business unit of Implenia Switzerland Ltd. and BAUER Schweiz AG, was instructed by Hofmann – La Roche in 2016 to construct the excavation pit…
St. Gallen, Schuppis new construction
St. Gallen, Switzerland
Start of construction: February 2015
To expand the premises of K+D AG on the Schuppis industrial estate in St. Gallen, an extension featuring a four-level underground parking garage and five above-ground floors was built.
Zürich-Oerlikon Bahnhofausbau Gleis 7+8
Zürich, Switzerland
Start of construction: January 2012
The expansion of Oerlikon train station is linked to the overarching SBB project for the Zurich cross-city link. In order to ensure that capacity can be increased sufficiently in connection with the cross-city link, two new train…
Weinbergtunnel DML SBB Zürich ATW
Zürich, Switzerland
Start of construction: January 2007
Construction of a two-track railway tunnel with a TBM.
Address
Wien, Austria
Implenia Österreich GmbH
Grünbergstrasse 15 / Stiege 3
1120 Wien