
Spiez, Implenia Switzerland Ltd.
In Spiez können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
ANGEBOTENE LEISTUNGEN
Contact
References
E4 Förbifart, Johannelund Tunnel
Vällingby, Sweden
Start of construction: January 2015
The bypass “Förbifart” Stockholm is a link between the north and south of the capital of Sweden and intends to relieve the traffic through the city. The 21 km long bypass motorway, of which approximately 17 km are underground in…
E39 Eiganestunnelen
Jølster, Norway
The E39 Eiganes tunnel (Lot E04) is part of the coastal main road between Kristiansand and Trondheim and is built in conjunction with rv.13 Ryfast which connects the municipal districts of Strand and Stavanger. This urban road…
Extension of Metro B – Hopitaux Lyon Sud – GC01
LYON, France
Start of construction: December 2017
In order to serve the city center of Oullins, the university-hospital hub of Lyon Sud, to create a multimodal exchange center and globally to intensify the development of the "valley of hospitals", SYTRAL has decided to extend…
U5, Berlin
Berlin, Germany
Start of construction: December 2011
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
Heat accumulator, Dessau
Dessau-Roßlau, Germany
Start of construction: November 2014
Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau
N01/42, 46 UPlaNS Verzweigung ZH Ost – Effretikon
Wallisellen, Switzerland
Start of construction: February 2018
Repair and optimisation of the N01 for vehicle traffic between the Zurich North and Effretikon junctions.
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction: October 2016
Construction of new swimming pool and sports hall on Sursee campus
Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme
Zürich, Switzerland
Start of construction: September 2018
Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction: May 2008
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction: May 2008
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Address
Spiez, Switzerland
Implenia Switzerland Ltd.
Gygerweg 18
3700 Spiez