Tunnel Ligerz, Lot 2
Ligerz, Switzerland
Start of construction:
September 2024
Construction volume (value of our services):
230 M EUR
Costs converted according to average yearly exchange rates during project realization
The project comprises the construction of the 2.1 km long twin-track tunnel in Ligerz. The total contract value is CHF 220 million, with Implenia's share amounting to around CHF 150 million.
Secondo tubo San Gottardo - Lot 241, Main Tunnel North
Göschenen, Switzerland
Start of construction:
October 2022
Construction volume (value of our services):
449 M EUR
Costs converted according to average yearly exchange rates during project realization
The present project includes the execution of the second tunnel tube north (2TG), the fault zone drive north, the second stage of the precut, the TBM launch section, the cross connections, the ventilation control centers and the…
Secondo tubo San Gottardo - Lot 243, North access tunnel
Göschenen, Switzerland
Start of construction:
April 2021
Construction volume (value of our services):
85,1 M EUR
Costs converted according to average yearly exchange rates during project realization
To rehabilitate the existing Gotthard Road Tunnel, a second tunnel tube (2TG) will be built first. Lot 243 comprises the construction of the access tunnel and the north logistics excavations. The project serves for the…
RBS Los 1.2 Postparc – Ausbau Bahnhof Bern
Bern, Switzerland
Start of construction:
August 2018
Construction volume (value of our services):
12,4 M EUR
Costs converted according to average yearly exchange rates during project realization
Sub-project involving the expansion of Bern train station
SBB Bözbergtunnel
Strihen, Switzerland
Start of construction:
May 2015
Construction volume (value of our services):
134 M EUR
Costs converted according to average yearly exchange rates during project realization
The existing Bözberg tunnel between Frick and Brugg does not meet the new requirements for the clearance gauge (corner height 4.0 m) and will therefore be replaced by a new 4-metre corridor as part of the overall project. …
Funicular railway Schwyz-Stoos
Schwyz, Switzerland
Start of construction:
May 2013
Construction volume (value of our services):
22 M EUR
Costs converted according to average yearly exchange rates during project realization
The existing funicular on the Stoos will be replaced by a new construction (the concession of the existing funicular is expiring and cannot be extended) with new lines. The type of cableway to be used is a funicular in shuttle…
Pumpspeicherkraftwerk Nant de Drance
Finhaut VS (Le Châtelard), Switzerland
Start of construction:
January 2008
Construction volume (value of our services):
602 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of an underground pumped-storage power station for the Nant de Drance pumped-storage power plant.
Weinbergtunnel DML SBB Zürich ATW
Zürich, Switzerland
Start of construction:
January 2007
Construction volume (value of our services):
257 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction of a two-track railway tunnel with a TBM.
Métro Lausanne, M2 Lot 1700
Lausanne, Switzerland
Start of construction:
March 2004
Construction volume (value of our services):
33 M EUR
Ouchy-Epalinges metro line via the Central Station and Place de l'Europe. Total length: 6 km, 14 stops, 9 tunnels and 5 bridges.
Lötschberg Basistunnel
Niedergesteln, Switzerland
Start of construction:
October 2002
Construction volume (value of our services):
515 M EUR
Costs converted according to average yearly exchange rates during project realization
The Lötschberg base line runs from Frutigen to Raron. In the north, it includes the connection to the BLS line and the Frutigen bypass with the Engstligen tunnel, the Lötschberg base tunnel and, in the south, the Rhone crossing…
Sedrun tunnel, lot 360, AlpTransit, Gotthard Base Tunnel
Sedrun, Switzerland
Start of construction:
December 2001
Construction volume (value of our services):
1.061 B EUR
Costs converted according to average yearly exchange rates during project realization
Construction of two parallel single-track railway tunnels using blasting, and construction of a multi-function station.
Bodio & Faido sections, Alptransit Gotthard Base Tunnel
Bodio - Faido, Switzerland
Start of construction:
January 2001
Construction volume (value of our services):
1.996 B EUR
Costs converted according to average yearly exchange rates during project realization
Construction of two parallel single-track railway tunnels with a Gripper TBM and of a multi-function station using blasting
CERN LHC, Los 1
Genf, Switzerland
Start of construction:
January 1998
Construction volume (value of our services):
68,5 M EUR
Costs converted according to average yearly exchange rates during project realization
Construction contract for CERN, the European Organization for Nuclear Research (Conseil Européen pour la Recherche Nucléaire). CERN is one of the largest and most renowned centers for basic research in physics in the world.…