Altstätten, Implenia Switzerland Ltd.
In Altstätten können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
References
Renovation of two raw meal silos at the Karsdorf cement plant
Karsdorf, Germany
Start of construction: September 2020
Implenia is renovating two 70-metre-high raw meal silos at the Karsdorf cement plant in Saxony-Anhalt on behalf of OPTERRA Zement GmbH.
EK2 E18 Farrisbrua
Larvik, Norway
Start of construction: January 2014
Farris bridge pases in a horizontal curve around the Farris Lake, near Larvik in Vestfold. The bridge is a part of E18, and is a part of the new 7 km long stretch from Bommestad to Sky in Larvik. The bridge is a part of the new…
Kantonsspital St.Gallen KSSG -Ostschweizer Kinderspital OKS
St. Gallen, Switzerland
Start of construction: April 2018
The Cantonal Hospital St.Gallen is not only getting a new, striking face - the modern new building will also support efficient and more cost-effective processes. It will also meet the increased demands of patients in terms of…
Pontons von Cologny, Genf
Cologny, Switzerland
Start of construction: October 2019
The attraction of this new bathing area is undoubtedly the "Great swimming Wooden Circle" on the lake which is located in front of the shore. It is the largest platform of its kind on Lake Geneva. The special attraction of this…
Construction LasmAaZ - Nuclear power plant Krümmel
Geesthacht, Germany
Start of construction: June 2020
Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.
Stadtbahnlinie U81, Los 1, Rohbau Hochtrasse
Düsseldorf, Germany
Start of construction: June 2020
Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated…
Stadtbahn line U81, lot 2, shell construction of tunnel
Düsseldorf, Germany
Start of construction: May 2020
Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction. …
Weiterbau der Grundwasserwanne Ohu
Essenbach, Germany
Start of construction: April 2020
Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
Varberg Tunneln FAS 2
Varberg, Sweden
Start of construction: June 2018
Strategically important railway project in Varberg.
Address
Altstätten, Switzerland
Implenia Switzerland Ltd.
Untersteinstrasse 10
9450 Altstätten