![](/fileadmin/_processed_/c/c/csm_iStock-528959560_Onex_web__1__27e5e52b0c.jpg)
Onex, Implenia Switzerland Ltd.
À Onex, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts aux clients
Contact
References
Pont Rouge Lot B1
Lancy, Switzerland
Start of construction: August 2015
Construction of a complex for SBB Real Estate consisting of three towers of 13 to 15 floors (total area of 47'365 m2 of offices and shops) but also an underground parking of 353 places on 3 levels of basements over the entire…
Wehrhahn line, lot 1
City of Düsseldorf, Germany
Start of construction: December 2006
In order to improve the local public transportation system, the state capital of Duesseldorf has made the decision to expand the so-called core section of the Wehrhahn Line as an underground city railway line, replacing 5…
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction: October 2016
Construction of new swimming pool and sports hall on Sursee campus
Hochhaus Park Tower
Zug, Switzerland
Start of construction: January 2012
Park Tower high-rise building
Andreasturm
Zurich, Switzerland
Start of construction: April 2016
SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…
Feuer- und Rettungswache Monheim am Rhein
Monheim am Rhein, Germany
Start of construction: September 2017
Demolition and new construction of the fire station in Monheim during ongoing operations
Einhausung Schwamendingen (ZH) – Lärmschutzmassnahme
Zürich, Switzerland
Start of construction: September 2018
Construction of the new cut-and-cover tunnel with a length of 940 metres, a width of 30 metres and a height of 8 to 10 metres.
Pumpspeicherkraftwerk Nant de Drance
Finhaut VS (Le Châtelard), Switzerland
Start of construction: January 2008
Construction of an underground pumped-storage power station.
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction: May 2008
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction: May 2008
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
![](/fileadmin/_processed_/c/f/csm_Jarlegant_Laurent_web_58ace5f4e7.jpg)
Alternatively, the business card is available for download. Download VCF-Card
![](/fileadmin/_processed_/8/1/csm_Purro_Joel_web_c94177928f.jpg)
Alternatively, the business card is available for download. Download VCF-Card
![](/fileadmin/_processed_/7/0/csm_Eric_Burg_67f0bb8755.jpg)
Alternatively, the business card is available for download. Download VCF-Card
![](/fileadmin/_processed_/b/e/csm_Francois_Grobel_e8885cf449.jpg)
Alternatively, the business card is available for download. Download VCF-Card
![](/fileadmin/_processed_/0/b/csm_Sainte-rose_Camille_411a879287.jpg)
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed