Onex, Implenia Switzerland Ltd.
À Onex, nos clients peuvent accéder à l’ensemble du portefeuille de prestations d’Implenia. Nos spécialistes opèrent de manière transversale, indépendamment du site ou de la Division, afin de vous offrir la meilleure solution dans une logique de prestataire unique.
Services offerts aux clients
Contact
References
Herrenschwanden New school building
Herrenschwanden, Switzerland
Start of construction: June 2019
School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)
Deisswil b. Stettlen Bernapark
Bernapark, Switzerland
Start of construction: August 2018
Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.
Biel Residential development Jardin du Paradis
Biel, Switzerland
Start of construction: October 2015
New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.
Bassbelt residential complex
Pieterlen, Switzerland
Start of construction: January 2017
New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…
Südwestumfahrung Brugg
Brugg/Windisch/Hausen, Switzerland
Start of construction: April 2019
The new bypass will connect the lower Aare valley with the A1 and A3 motorways and provide access to Brugg/Windisch.
TELT, CO08 - Villard Clément
Lyon, France
Start of construction: January 2021
Construction of the base tunnel from the Villard Clément portal attacks.
Norra Länken 12 och 22
Stockholm, Sweden
Start of construction: December 2007
The design was carried out by Technisches Büro, Implenia's, then Bilfinger's, in-house Structural Design department.
Kvarnholmsförbindelsen
Stockholm, Sweden
Kvarnholmen is an island in the Stockholm Archipelago that was used industrially. The former industrial area has now been developed into a vibrant urban environment.
Getingmidjan
Stockholm, Sweden
Start of construction: April 2017
Complex project in the heart of Stockholm.
Line B of the Lyon Metro
Lyon, France
Start of construction: January 2018
This project, with a length of approximately 2.5 km, will extend line B from Gare d'Oullins station to Hôpitaux Lyon Sud station and create two additional stations. The journey time between Oullins station and the Lyon Sud…
Address
Onex, Switzerland
Implenia Switzerland Ltd.
Chemin de l'Echo 1
1213 Onex
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Opening hours
07:30
-
12:15
13:30
-
17:00
Closed