Tiefbau - Tunnelbau
References
380-kV-Kabeldiagonale, 50hertz
Berlin, Germany
Start of construction: August 2019
Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts
European XFEL Röntgenlaserprojekt
Hamburg, Germany
Start of construction: January 2009
The European XFEL (X-Ray Free Electron Laser) project brings a new research facility to Hamburg.
U5, Berlin
Berlin, Germany
Start of construction: December 2011
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
U-Bahn Nürnberg U3, BA 2.1
Nürnberg, Germany
Start of construction: August 2014
In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west…
Niederfinow ship lift
Niederfinow, Germany
Start of construction: May 2008
Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal.
Ilmenau sewage treatment plant
Ilmenau, Germany
Start of construction: August 2015
New replacement for the Ilmenau sewage treatment plant
Elevated water tank in Bamberg
Bamberg, Germany
Start of construction: April 2014
An elevated container with a usable capacity of 10,000 cubic metres was constructed above Bamberg old town in order to ensure a continuous supply of drinking water.
Mannheim power station
Mannheim, Germany
Start of construction: May 2009
Construction of a coal-fired power station unit to ensure the long-term security of electricity and district heating generation
Gollachbrücken
Gollhofen, Germany
Start of construction: April 2017
New replacements for three bridges as part of the bridge strengthening scheme for the Gollach Bridge
CHEMPARK Dormagen
Cologne, Germany
Start of construction: December 2014
Construction of a new boiler plant consisting of ten steam boilers, three steel pipe stacks, a natural gas reducing station and a transformer
Address
München, Germany
Implenia Construction GmbH
Landsberger Straße 290a
80687 München
Contact persons
Alternatively, the business card is available for download. Download VCF-Card
Alternatively, the business card is available for download. Download VCF-Card
Technical Design Office Munich Implenia Construction GmbH
Alternatively, the business card is available for download. Download VCF-Card