Freiburg, Implenia Civil Engineering GmbH
In Freiburg können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
Primary Contact
Niederlassung Freiburg
References
Renovation of two raw meal silos at the Karsdorf cement plant
Karsdorf, Germany
Start of construction: September 2020
Implenia is renovating two 70-metre-high raw meal silos at the Karsdorf cement plant in Saxony-Anhalt on behalf of OPTERRA Zement GmbH.
Hyparschale Magdeburg
Magdeburg, Germany
Start of construction: October 2020
Reinforcement of the supporting and shell structure of the Hyparschale built in 1969 in Magdeburg using carbon concrete.
Subway access structure Oberhafentunnel
Hamburg, Germany
Start of construction: August 2020
Construction of a new subway access structure with connection to the station HafenCity University
Errichtung LasmAaZ – Kernkraftwerk Krümmel
Geesthacht, Germany
Start of construction: June 2020
Construction of a new storage facility for low- and intermediate-level waste - Hybrid project with Implenia Spezialtiefbau GmbH Hamburg and Hochbau GmbH Berlin.
Stadtbahnlinie U81, Los 1, Rohbau Hochtrasse
Düsseldorf, Germany
Start of construction: June 2020
Construction of a new rail line to connect the airport in two sections/lots. New construction of civil engineering structures (ramp structures, an elevated trough section, bridge near access gate 1) including the associated…
Stadtbahn line U81, lot 2, shell construction of tunnel
Düsseldorf, Germany
Start of construction: May 2020
Construction of a new railway line to connect the airport in two sections/lots. Construction of ramp, trough section, tunnel and train station (underground station) Düsseldorf Airport as cut-and-cover construction. …
Weiterbau der Grundwasserwanne Ohu
Essenbach, Germany
Start of construction: April 2020
Construction of a 970m long section of the B15 new as a massive trough structure (groundwater basin) with a connection point in the groundwater (cloverleaf).
München Haltepunkt Marienhof
München, Germany
Start of construction: January 2019
The major project 2nd S-Bahn main line Munich consists of the sub-projects "above-ground areas", "inner city area/tunnel" and "supplementary network measures" in the outer branches.
Albvorlandtunnel
Wendlingen am Neckar, Germany
Start of construction: January 2016
The new railway link (NBS) Wendlingen-Ulm together with Stuttgart 21 significantly improves the infrastructure of Baden-Württemberg and thus creates shortened travel and transport times not only in Baden-Württemberg but also…
380-kV-Kabeldiagonale, 50hertz
Berlin, Germany
Start of construction: August 2019
Cable diagonal Berlin - Construction of a 6.7 km long cable tunnel with 4 shafts as supply / rescue shafts
Address
Freiburg, Germany
Implenia Civil Engineering GmbH
Hans-Bunte-Strasse 12
79108 Freiburg
Contact persons
Alternatively, the business card is available for download. Download VCF-Card