
Altstätten, Implenia Switzerland Ltd.
In Altstätten können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
References
Subway line 17.1 - Paris Grand Paris Express
Paris, France
Start of construction: December 2018
With a length of 27 km, line 17 extends over 13 municipalities in the departments of Seine-Saint-Denis, Val-d'Oise and Seine-et-Marne. It connects nine stations between Saint-Denis Pleyel and Le Mesnil-Amelot in less than…
Albvorlandtunnel
Wendlingen am Neckar, Germany
Start of construction: January 2016
The new railway link (NBS) Wendlingen-Ulm together with Stuttgart 21 significantly improves the infrastructure of Baden-Württemberg and thus creates shortened travel and transport times not only in Baden-Württemberg but also…
E4 Förbifart, Johannelund Tunnel
Vällingby, Sweden
Start of construction: January 2015
The bypass “Förbifart” Stockholm is a link between the north and south of the capital of Sweden and intends to relieve the traffic through the city. The 21 km long bypass motorway, of which approximately 17 km are underground in…
E39 Eiganestunnelen
Jølster, Norway
The E39 Eiganes tunnel (Lot E04) is part of the coastal main road between Kristiansand and Trondheim and is built in conjunction with rv.13 Ryfast which connects the municipal districts of Strand and Stavanger. This urban road…
Extension of Metro B – Hopitaux Lyon Sud – GC01
LYON, France
Start of construction: December 2017
In order to serve the city center of Oullins, the university-hospital hub of Lyon Sud, to create a multimodal exchange center and globally to intensify the development of the "valley of hospitals", SYTRAL has decided to extend…
U5, Berlin
Berlin, Germany
Start of construction: December 2011
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
Heat accumulator, Dessau
Dessau-Roßlau, Germany
Start of construction: November 2014
Construction of foundations for a heat accumulator, including machine building, for the thermal power station in Dessau
Neubau Schwimm- und Sporthallen Campus Sursee
Oberkirch, Switzerland
Start of construction: October 2016
Construction of new swimming pool and sports hall on Sursee campus
Zurich cross-city link, lots 3.1 / 3.2, underpinning of southern section and access shaft
Zurich, Switzerland
Start of construction: May 2008
For the construction of the new cross-city link between Zurich Oerlikon and Zurich Altstetten, an access shaft was built at Bahnhofquai to act as the main starting point for underpinning the listed building in the southern…
Zurich cross-city link, lot 2, Löwenstrasse train station
Zurich, Switzerland
Start of construction: May 2008
The new underground transit station at Löwenstrasse is the heart of the Zurich cross-city link. It was built 16 metres below the existing tracks during normal railway operations. This represented an enormous challenge for…
Address
Altstätten, Switzerland
Implenia Switzerland Ltd.
Untersteinstrasse 10
9450 Altstätten