Tunnelling,
Transport tunnels
Wienerwald-Tunnel
The whole Wienerwald tunnel construction has been divided into the following three sections: two single-track tunnel tubes, L = 2 x 10,770 m driven by a TBM; a 2,356 m long, double-track tunnel section with widened tunnel area in conventional tunnelling method and earth works of about 2 million m³ of solid material, renovation of dumpsite for domestic waste, roadway […]