The existing Elbe Tunnel, which opened in 1975 with 3 tubes and 6 lanes, was designed for 70,000 vehicles per day. With up to 140,000 vehicles per day during peak periods, the tunnel’s capacity was exceeded and an extension was required. In its final operating state, traffic flows exclusively through the 4th Tube from north to south with a very high percentage of heavy […]