Topics and projects,
Civil engineering
Replacement of the Rader Hochbrücke bridge progresses successfully. Top speed at the highest technical level.
which weighs several tons, on the water, two jack-up platforms from England are used, which, with the help of their long legs (solid steel tubes), are able to transfer the high weights into the low-lying load-bearing subsoil. The successful execution of the work on the hydraulic engineering site would not[...]