Watch video

New construction "WolkenWerk" Zurich

In the three high-rise buildings and basement floors of the "WolkenWerk" in Zurich, more than 300 condominiums have been created with a demand for high living quality and sustainability.

Holistically conceived new buildings

New construction


New construction competence in practice

A building becomes good from the ground up when it is designed and implemented holistically


Design models

You have the choice between different models


Your contacts

We look forward to talking to you about forward-looking new buildings and sophisticated modernisations.

Jens Vollmar
Head Division Buildings & Country President Schweiz

 

 

+41 58 474 06 10 jens.vollmar@implenia.com Linkedin Download VCF-Card Business card
Stefan Winkler, MRICS
Head of Real Estate Consulting and Clients / Head of Region Central
+41 58 474 34 62 stefan.winkler@implenia.com Linkedin Download VCF-Card Business card
Roman Müller
Head of Master Builder German-speaking Switzerland
+41 58 474 04 54 roman.mueller@implenia.com Linkedin Download VCF-Card Business card
Marc Brülhart
Head Northwest Region
marc.bruelhart@implenia.com Linkedin Download VCF-Card Business card
Raffaele Balmelli
Head of Region Central / East, Branch Manager Lugano & Chur a.i.
+41 58 474 10 95 raffaele.balmelli@implenia.com Linkedin Download VCF-Card Business card
Danila Aimone
Head Region West
+41 58 474 05 16 danila.aimone@implenia.com Linkedin Download VCF-Card Business card
Thomas Rolli
Leiter Region Zürich
Division Buildings
thomas.rolli@implenia.com Linkedin Download VCF-Card Business card
Philippe Laurent Kaufmann
Head of Modernisation Switzerland
+41 58 474 27 50 philippelaurent.kaufmann@implenia.com Download VCF-Card Business card
Eric Burg
Head of Modernisation and Branch Manager Onex
eric.burg@implenia.com Linkedin Download VCF-Card Business card

Our locations

14 locations Sort by:
asc desc

Contact

Would you like advice on the subject of execution models?

* mandatory fields

Our new building references

Herrenschwanden New school building

Herrenschwanden, Switzerland

Start of construction: June 2019

School complex with 6 classrooms, a gymnasium and various ancillary rooms (e.g. library, music room, etc.)

Deisswil b. Stettlen Bernapark

Bernapark, Switzerland

Start of construction: August 2018

Renovation and renewal of the existing buildings, partial replacement of service and office premises as well as 173 rental flats.

Biel Residential development Jardin du Paradis

Biel, Switzerland

Start of construction: October 2015

New construction of a residential complex with daycare centre and commercial premises near the city centre of Biel.

Bassbelt residential complex

Pieterlen, Switzerland

Start of construction: January 2017

New construction of a residential complex in the village centre of Pieterlen (BE). The 83 flats are divided into 6 buildings, each with 5 storeys. The surroundings were designed according to the slope situation with curved…

Neubau Kantonsspital Baden AGNES

Baden, Switzerland

Start of construction: July 2019

New construction of a skeleton building for a new hospital. The new building with approx. 400 beds extends up to 6 upper floors.

Neubau Schwimm- und Sporthallen Campus Sursee

Oberkirch, Switzerland

Start of construction: October 2016

Construction of new swimming pool and sports hall on Sursee campus

Hochhaus Park Tower

Zug, Switzerland

Start of construction: January 2012

Park Tower high-rise building

Andreasturm

Zurich, Switzerland

Start of construction: April 2016

SBB Real Estate, the real estate division of the Swiss Federal Railways, is constructing the Andreasturm in the Zurich-Oerlikon district. The 80-metre-high office building is situated on a triangular plot of land between two main…