Freiburg, Implenia Civil Engineering GmbH
In Freiburg können unsere Kunden auf das ganze Leistungsportfolio von Implenia zurückgreifen. Unsere Spezialisten agieren standort- und bereichsübergreifend, um Ihnen die beste Lösung aus einer Hand anzubieten.
Angebotene Leistungen
Contact
Primary Contact
Niederlassung Freiburg
References
U5 Berlin
Berlin, Germany
Start of construction: January 2012
Construction of 1.6-kilometre-long double-tube tunnel and shell construction of two stations in central Berlin
U-Bahn Nürnberg U3, BA 2.1
Nürnberg, Germany
Start of construction: August 2014
In order to enhance North Nuremberg’s accessibility to the local public transportation system, the existing subway network will be expanded with the construction of the new U3 line. One section of this new line, south-west…
Niederfinow ship lift
Niederfinow, Germany
Start of construction: May 2008
Construction of a new ship lift to overcome the 36-metre altitude difference in the Oder-Havel canal.
Rastatt-Karlsruhe-Wiesental noise barrier
Rastatt-Karlsruhe-Wiesental, Germany
Start of construction: January 2015
Installation of noise barriers along the Rastatt-Karlsruhe-Wiesental railway line
Noise barrier in Ditzingen
Ditzingen, Germany
Start of construction: June 2015
Construction of a noise barrier in Ditzingen
Ilmenau sewage treatment plant
Ilmenau, Germany
Start of construction: August 2015
New replacement for the Ilmenau sewage treatment plant
Elevated water tank in Bamberg
Bamberg, Germany
Start of construction: April 2014
An elevated container with a usable capacity of 10,000 cubic metres was constructed above Bamberg old town in order to ensure a continuous supply of drinking water.
Noise control enclosure A1 Cologne-Lövenich
Cologne-Lövenich, Germany
Start of construction: December 2006
Construction of a noise control enclosure including control and safety technology, plus maintenance for ten years
Mannheim power station
Mannheim, Germany
Start of construction: May 2009
Construction of a coal-fired power station unit to ensure the long-term security of electricity and district heating generation
Gollachbrücken
Gollhofen, Germany
Start of construction: April 2017
New replacements for three bridges as part of the bridge strengthening scheme for the Gollach Bridge
Address
Freiburg, Germany
Implenia Civil Engineering GmbH
Hans-Bunte-Strasse 12
79108 Freiburg
Contact persons
Alternatively, the business card is available for download. Download VCF-Card