Infrastructure,
Special Foundations
Parking Kunstmuseum
southern area. When the surface was completed on both sides, the parking garage levels were started in cover construction. Three excavation openings allowed all the gravel material to be conveyed to the surface, loaded and discharged. At the same time, the parking ceilings were pulled in and the floor ramps[...]