Visualization O-Werk I Campus – Opelring in Bochum, Germany
Visualization O-Werk I Campus – Opelring in Bochum, Germany
Visualization O-Werk I Campus – Opelring in Bochum, Germany

O-Werk I Campus – Opelring, Bochum, Germany

Short description

On the former Opel factory site in the MARK 51°7 industrial park, an innovation quarter with flair has been created in which the companies located there can work and research closely together.

The project

The office buildings with up to six upper floors are sustainably oriented and equipped with forward-looking building technology and state-of-the-art office space. A mix of utilities, plenty of greenery, an appealing architecture and the direct connection to public transport round off the attractiveness of the campus.

BCL was responsible for the execution of the construction site logistics.

Services in detail

Execution 

  • Delivery traffic control
  • Waste disposal logistics
  • Access and entry control

Sustainability

  • Separation of construction waste by type and disposal via certified companies
  • LEED-Gold aspired

Interest aroused? Get in touch with us!

Contact