Bored piles in slopes and water
Well positioned in all situations Bored piles in slopes and water With the HW method (Hochstrasser way), we are able to produce large bored piles that do not have to be positioned directly in front of the excavator, as is the case when working with rotary drilling rigs or casing machines. Bored piles
Infrastructure
Civil engineering services
Special foundations
Service portfolio