Primary school building Martin Haffter
Short description
The Martin Haffter primary school building was constructed using timber elements. The new building is Minergie-certified.
The project
Implenia carries out the demolition of the old school building after the move. The replacement of the primary school building was carried out as a wooden element construction. Consisting of wood from Thurgau trees, the building was certified as Minergie-P.
Challenges
- New construction on existing emergency hospital
- Construction activity during ongoing school operation
Sustainability
The system wood construction was built exclusively with wood from Thurgau forests. The school building is Minergie-P certified.