Tunnelling,
Transport tunnels,
Service tunnels,
Special Foundations,
Civil engineering,
Concrete construction,
Urban transport infrastructure,
Rail transport infrastructure,
Structural engineering,
Infrastructure
München Haltepunkt Marienhof
The Marienhof construction project includes the central access structure that is being constructed in the diaphragm wall/cut-and-cover construction method. The installa-tion of the first excavation level at approx. 3m below ground level is being built as a first measure with a back-anchored girder pile shoring as a secured excavation pit. From this level, the diaphragm […]