Infrastructure,
Tunnelling,
Special Foundations,
Civil engineering
District heating tunnel – West (FWS-West) Southern Line
installed in the shaft structures. Above the site, the launch shaft will have a small operations building to control the system. Pictures: © Wärme Hamburg GmbH Press article[...]