Rheinberg Industrial Park
Short description
Construction of new limestone warehouse in just six months.
The project
- Construction period: 6 months
- 1400 m³ reinforced concrete
- 300 m³ precast reinforced concrete elements
- Transport tunnel: 120 m long, 3.0 m x 3.0 m cross-section
- 280 t steel construction
- Underground loading station with low-level bunker
- Inbound transportation of limestone or coal by train or truck
- Intermediate storage facility with storage volume of approx, 10,000 m³
- Material transportation via supply tunnels and overground via conveyor belts