Rheinberg
Short description
Collecting basin in accordance with the German Federal Water Act (WHG) – some work carried out in explosive atmospheres.
The project
- Construction period: 3 months
- 140 m³ reinforced concrete
- Some work carried out in explosive atmospheres
- Strict requirements for crack widths
- Jointless building method